Integration of Wind Generation within the Electric Power System Experiences from Spain

Tamaño: px
Comenzar la demostración a partir de la página:

Download "Integration of Wind Generation within the Electric Power System Experiences from Spain"

Transcripción

1 Integration of Wind Generation within the Electric Power System Experiences from Spain Berlin, December 2005 Juan F. Alonso-Llorente RED ELÉCTRICA DE ESPAÑA Contents The Wind Generation within Spanish system: past and prospects Sensitive aspects of WG for the power system The WG within System Planning and Access to the Grid : Generation Expansion Planning Planning and Access Studies Wind Power Dimensioning within system The WG within System Operation Summary and Conclusions 2 1

2 The special regime Legal framework created to favour the European policy of Promotion of renewable and high efficiency plants, with some advantageous features in the operation and economic contexts: Choice of selling policy and price method Market Bidding Price: Market Price + Additional Bonus Acquired by the distribution companies Price: Fixed Special Price Guarantee of output and injection into system (except security constraints) Classification according to UCTE taxonomy: Hydro plants (< 10 MW) and sea-energy (0) plants Other renewables Biomass // Solid Urban and Industrial Waste // Solar // Geothermal (0) // Wind Farms No renewable sources Plants using residual energy from an industrial process Cogeneration plants: Coal // Heavy-oil // Refinery Gas // Natural gas 3 MW Installed Power vs. Load SEPE. OR <> SR (MW) ª STAGE: COGENERATION 2ª STAGE: WIND POWER Accumulated Increase % Ordinary Reg. Special Reg. Peak Demand 4 2

3 Renewable Generation within primary demand 100% 90% 80% 70% 3,7% 3,5% 3,5% 3,6% 3,8% 3,9% 4,2% 4,4% 2,9% 2,7% 1,9% 2,0% 2,8% 1,5% 2,6% 1,9% 13,4% 13,5% 12,8% 13,0% 13,0% 10,3% 10,4% 11,3% 12,2% 12,8% 14,2% 12,4% 11,8% 11,7% 15,6% 17,3% 6 7%vs.12% 12% of primary energy in 2010 ( 54/1997Law) ( 29% of ElecDem) 60% 50% 40% 53,5% 54,1% 52,8% 51,7% 52,2% 51,1% 50,8% 50,0% Otras Energías Ren Hidráulica Nuclear Gas Natural Petroleo Carbón 30% 20% 10% 16,4% 15,5% 17,2% 17,3% 15,3% 16,6% 15,0% 14,9% 0% Evolution of wind power generation (MW installed SEPE) sep 6 3

4 Régimen Especial; ; 24% Gas Ciclo combinado; 8.259; 12% Fuel-Gas; 6.930; 10% Evolution of Special generation: Dec.2004 Wind Power MW (12%) Installed Power dec (g.m.) Hidráulica; ; 25% Carbón; ; 17% Nuclear; 7.876; 12% Energy anual generation 2004 (g.m.) Gas Ciclo Combinado GWh (13%) Fuel-oil GWh (2%) Wind Power Régimen GWh especial (6%) GWh (18%) Hidráulica GWh (12%) Carbón GWh (30%) Significant energy contribution around 5 6 % of total relative contribution EvsP (1.958 heq) comparable to average hydro gen. Nuclear GWh (25%) 7 Energy Forecast H2011 Wind Power means the most significant and likely chapter for the European, Spanish and regional environmental objectives, revitalised in the recent plans Horizon 2011 (MIN) Under review PER 2010 (no grid consideration) Generation SEPE MWins GWh/y MWins GWh/y Biomass Solar-thermoelectric Mini-hydro Wind Power Biogas Solar- photovoltaic Urban Waste Renewable (without large hydro) Hydro (large) Total Renewable Total Generation %vstot Energy 9,7% V 15,4% 31% 8 4

5 Contents The Wind Generation within Spanish system past and prospects Sensitive aspects of WG for the power system The WG within System Planning and Access to the Grid : Generation Expansion Planning Planning and Access Studies Wind Power Dimensioning within system The WG within System Operation Summary and Conclusions 9 Dispatchability of renewable generation In addition to the advantages, the most relevant peculiarities of wind power for the integration are associated to: ATRIBUTES: Capability to manage power production Reliability of production programme (Programme vs. Forecast) Contribution to the constant necessary generation-load balance Inmunity after contingencies Incidents in the power system Extreme Conditions over primary energy (Intermitency) MOTIVATIONS: Nature of the process: Energy Source Primary/Complementary Type of generator and asociated equipment Main chapters (with influence on the power system): NON DISP.- Wind power generation: The large development recent and foreseen- makes local problems into very important challenges for the system operation and development DISP.- Solar-thermoelectric generation 10 5

6 Sensitive nature of wind power System planning: Generation Expansion Planning Transmission grid planning Access and Connection to the Grid System Operation: Programming Operation Markets Constraint Solution f-p Regulation V-Q Regulation Real time Operation Decreasing Time Horizon 11 Contents The Wind Generation within Spanish system past and prospects Sensitive aspects of WG for the power system The WG within System Planning and Access to the Grid : Generation Expansion Planning Planning and Access Studies Wind Power Dimensioning within system The WG within System Operation Summary and Conclusions 12 6

7 Power Potencia production horaria vs / installed potencia instalada capacity (%) (%) Wind Energy in the generation expansion forecast (i) Little time/space pattern for instantaneous production, although seasonal influence is found mar-02 abr-02 may-02 jun-02 jul-02 ago-02 sep-02 oct-02 nov-02 dic-02 ene-03 feb-03 mar-03 abr-03 may-03 jun-03 jul-03 ago-03 sep-03 oct-03 nov-03 dic-03 ene-04 feb-04 mar-04 abr-04 may-04 jun-04 jul-04 ago-04 sep-04 oct-04 nov-04 dic-04 ene Wind Energy in the generation expansion forecast (ii) Significant seasonal pattern for monthly energy production at national level Patrones de producción potencia de mensual/pot potencia a instalada nivel nacional: Escaso patron instantáneo Average monthly potencia productionmensual/pot vs installed capacity instalada (%) Posibles patrones energéticos estacionales Mar-02 May-02 Jul-02 Sep-02 Nov-02 Ene-03 Mar-03 May-03 Jul-03 Sep-03 Nov-03 Ene-04 Mar-04 May-04 Jul-04 Sep-04 Nov-04 Ene

8 37350 MW 15 Contribution to the SoS Wind Power total estimated (MW) SEPE LOAD (MW x 10) MW/ MW (x 10) 26 JAN JAN

9 Wind Energy in the generation expansion forecast (iii) Generation planning is indicative (not binding); however, its forecast is necessary to plan the network (which is binding): New Generation contingent dimensioning Wind Energy Generation: Energy: Sufficient and quite solid estimation (independence of strategies) Power: Volatile estimation and non-firm contribution to the SoS factor Frequency Distribution of wind power Frecuency (%) Power (%) 100 % Production vs Installed % 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Probability of reaching (% Production vs Installled) 17 Contents The Wind Generation within Spanish system past and prospects Sensitive aspects of WG for the power system The WG within System Planning and Access to the Grid : Generation Expansion Planning Planning and Access Studies Wind Power Dimensioning within system The WG within System Operation Summary and Conclusions 18 9

10 Planning and access studies (i) Access Feasibility.- Adequacy & Security Assessment with planning&operation criteria within the last development plan (generally short-medium term : H2008): General Conditions (every type of generation) Acceptable steady state behaviour (N & N-X LF studies) Short-circuit power (Scc) acceptable by substations equipment Acceptable dynamic behaviour (stability after disturbances) Particular ( special gen. -wind-): Limitations associated to the applied MVA 1/20 Scc of connection point ( V Scc) simplistic criterion oriented to quality assurance within distribution; old conditions for a distributed environment, but contributes to power distribution Grid design criteria: grid meshing, magnitude, distance to the grid 19 Planning and access studies (ii) Technical conditions: Studies of different topological scope The nodal studies are preceptive, but the results only reflect upper possibilities or indicative range: nodal capacities are not mutually compatible and reinforcement needs may not be coherent The need for the widest study area is limited to the regional studies, which become the reference for the Regional Administrations (competent for authorising wind generators), deciding nodal distribution within regional possibilities Besides, national studies must establish maximum wind penetration within the system (generally due to dynamic performance) National coordination is needed, and essential when regional capacities are not mutually compatible, in order to: Establish coherent generation plans Design sound grid development plans, by weighing local and interregional reinforcements 20 10

11 Aluminio Español Lemoniz Tabiella Irún Errondenia Puentes de La Granda Santurce Zierbena Gatica Pasajes García Rodríguez Boimente Laminación Carrio Argia A CORUÑA (La Coruña) Aboño Penagos Arkale SANTANDER Amorebieta Hernani Repsol Puerto Uninsa Abanto Hernani Sabón Cacicedo Lemoniz Gueñes Eiris OVIEDOSiero Torrelavega Santurce Azpeitia Irún Errondenia Ferroatlántica Grela Puente de S. Miguel DONOSTIA Arkale Argia Orbegozo Zierbena Gatica Soto de Meirama Lada (San Sebastián) Abadiano Ichaso Penagos Mesón do Vento Narcea Ribera Abanto BILBO (Bilbao) Hernani Ayala Ormaiztegui Vimianzo Azpeitia T. Nervión Hernani Mondragón Aristrain Sidegasa Pesoz La Pereda Tubacex Gueñes Amorebieta Aguayo Ichaso Villalbilla Barcina Vitoria Orcoyen Dumbria La Gaudiere LUGO Villablino Vitoria-Elgea Santiago II Baixas Mazaricos Portodemouros Remolina Velilla Vitoria Elgea Tambre II Anllares Mataporquera Cayetano Virtus C.N. S.M. Gamarra Pragneres Las Ondinas La Robla Guardo Alí Muruarte Orcoyen Benos Montecarrio Cillamayor Garoña Forjas Alavesas IRUÑA (Pamplona) GASTEIZ (Vitoria) Peñadrada Barcina Tabescán Masgalán Compostilla II Cordovilla Tibo Chantada Belesar Sta. Marina Las Mazorras Puentelarra Mercedes Benz Moralets Compostilla Jundiz Biescas II Eriste Ameixeiras LEÓN El Cerro Andorra La Lomba Villameca P. de la Sal Miranda La Fortunada Laguardia Sallente Sangüesa Llavorsi PONTEVEDRA P.E.S. Cando Taf alla S. Pedro Montearenas Escalona Sesue Sabiñanigo Albarellos Vilecha Herrera La Lora Briviesca Logroño Olite Pont de Sta. Llogaia Lourizán Velle El Sequero Castrelo P. Bibey LOGROÑO Arrubal T. Foradada Suert Pazos de Pobla Adrall OURENSE P.E. Sil-Meda Prada Villalbilla Mediano Borben Villimar Trives (Orense) BURGOS Sta. Engracia Quel de Segur Cercs Suido Cartelle Conso San Agustín Carrasquillo Castejón HUESCA Grado Salas Juia Atios Frieira Soutelo Ribadelago Vic Lubián GIRONA (Gerona) Puebla de Sanabria Grijota Vallejera La Serna Gurrea Alcalá de Gurrea Tudela Almudevar Noguera Bescanó Centelles Las Conchas Aparecida PALENCIA Valparaiso Oncala Lanzas Agudas Monzón Calders Massanet Palencia Pola Tardienta Magallón Lindoso Cinca Villanueva Peñaflor S. Celoni Sallente La Mudarra Entrerrios Bajo Cinca SORIA Bescanó ZARAGOZA LLEIDA (Lérida) Sentmenat Ascó Vic La Mudarra (Id) Moncayo Jalón Los Leones VALLADOLID Mangraners Mangraners Pierola Can Barba Ricoba yo Rueda de Jalón Plaza M.Torrero Sentmenat La Granda Osera (AVE) Juneda Castro Zaratán Renedo Santa Coloma La Olma Franquesas Tabiella María de Huerva El Espartal La Espluga Can Jardi BARCELONA Palau La Roca Almazán Peñalba Los Vientos Zaragoza (AVE) Montblanc Laminación Carrio Zamora Tordesillas Mequinenza P. de Suert-Pobla M. Figueres A. Zinc Villalcampo ZAMORA El Ventero Sadumi Collblanch Can Barba R. Caldes Trasona Aboño El Olivar Granadella Castellet Garraf Pobla Pierola Uninsa Vandellós St. Cugat S. Fost Bemposta Terrer Penedés Escatrón Ribarroja El Morell Perafort Aldeadávila II M. del Campo Fuendetodos Abrera La Secuita Foix Can Jardi Santa Coloma Aragón Repsol Castellbisbal (Celsa) Pocinho Olmedo TARRAGONA Constanti Villarino Ascó Bellisens Rubí S. Andreu Castellbisbal Siero Aldeadávila Medinaceli Ascó Sant Adria Antiñano Tarragona Molins Sant Just P. San Miguel Besos Saucelle Muniesa Boimente Villamayor Vandellós Monjos Trinitat Ferreros SALAMANCA Mequinenza Begues Poble Nou Penagos Segovia Teruel Soto de Ribera Saucelle II Hinojosa Foix-Castellet Sant Boi Maragall Lada Lastras SEGOVIA Mezquita Viladecans Vilanova Sabiñanigo Narcea La Pereda Otero de Herreros Fuentes de Castelldefels Eixample la Alcarria La Serna Urgell Garraf Gava Velilla GUADALAJARA Trillo Escucha L. Corts Vandellós Aeropuerto 1 Zona Franca ÁVILA El Cereal Maestrazgo Villanueva Collblanch Aeropuerto 2 La Robla La Robla Galapagar S. S. Reyes Morella L Hospitalet (Hec) Villablino Fuencarral Meco Peñaflor Aragón Paracuellos Anchuelo V. Cañada MADRID TERUEL Los Leones Loeches Bolarque I Escatrón Villa viciosa Gabriel y Galán Moraleja Morata Bolarque II J. Cabrera Plaza Guijo de Granadilla Monte Torrero Parla II CUENCA Entrerríos Cala Huelves Arañuelo El Ingenio Alcudia II Bosch Casatejada La Plana Añover Zaragoza Escatrón Torrijos Bechi María Talavera Aceca (AVE) Torrejón Vall d Uxo Castellón Cala Mesquida Son Reus Llubi J.M. de Oriol Almaraz TOLEDO Segorbe Sagunto Valldurgent Marratxi Cedillo Azután PALMA DE C.N. Almaraz Valdecañas Olmedilla MALLORCA Sidmed Calvia La Eliana Mora F. Muestras Falagueira Aldaya/El Oliveral VALÈNCIA (Valencia) Cáceres CÁCERES Madridejos F. San Luis Requena Torrente Cortes II Valencia (Torrente) Valdecaballeros El Emperador C.N. Cofrentes Catadau M. Cortes Alcira C. Real Romica Picón Ayora Badajoz (AVE) La Paloma ALBACETE S. Jorge Torrent Elvas Mérida CIUDAD REAL BADAJOZ Alarcos Formentera Alvarado Pinilla Benejama Venta La Nava de la Inés Puertollano La Nuncia Elcogas Monovar Xixona Campello Petrel S. Vicente Bienvenida Novelda ALACANT (Alicante) Saladas Balboa Arroyo del Valle El Palmeral Alqueva Elche HC Rocamora Elche Este Guadame Andujar Rojales MURCIA Úbeda La Lancha Montecillo Torremendo San Miguel Bajo El Palmar El Palmar Campoamor Casillas CÓRDOBA San Pedro Olivares Totana La Asomada Hoya Morena JAÉN Guillena Nueva Escombreras Fausita Nueva Tharsis Escombreras Grijota La Mudarra Villanueva del Rey SantiponceSEVILLA Ence Onuba Siderúrgica Sevillana Centenario Cabra El Cereal HUELVA Aljarafe Los Alcores Galapagar C. Colón Guadaira Caparacena Otero Torrearenillas Quintos S. S. Reyes D. Rodrigo Algete Daganzo Palos/Torrearenillas Dos Hermanas La Roda de Andalucía El Fargue Atarfe Litoral Galapagar GRANADA Hueneja Gábias de Almería A. Vega ET Meco Fuencarral Tajo de la ET Sanchinarro Encantada Benahadux C. Casa Campo Hortaleza Aena Paracuellos San Rafael Aravaca C.Naciones Simancas Arcos de la Órgiva ALMERÍA Majadahonda Prosperidad El Coto P.S. Fernando Puerto de Frontera (Norte) Los Montes Berja Palafox MÁLAGA V.Cañada Canillejas Trillo Sta. María Mazarredo Norte Los Ramos Ardoz Melancólicos Estrella Coslada La Cartuja Arcos de la Boadilla Loeches Ventas Vicálvaro J. Cabrera CÁDIZ Frontera (Sur) Alhaurín Talavera Alcorcón Lucero Mediodía P.P rincesa Vallecas Cádiz Paterna Guillena La Lancha Villaviciosa Aguacate Retamar C. Plata Costa Sol Guillena Villaverde Arganda Almaraz Casares Arroyo Molinos C. Fregaderos Getafe La Torrecilla Guillena Santiponce El Hornillo Huelves Parralejo San Roque Pinar del Rey Fuenlabrada Pinto Morata Torrearenillas Almaraz Facinas Centenario Guillena Moraleja Parla Pinto II Almaraz Bahía de Algeciras Parla II Puerto de la Cruz Los Barrios Alcores Olmedilla Playa Blanca Tarifa Almaraz Siderúrgica Azután Valdemoro Corralejo Quintos Aceca Guillena Arañuelo CEUTA Rocío Añover Aceca Tabares Melloussa Dos Hermanas Candelaria Guillena Isora D. Rodrigo Pinar del Rey Lomo del Pto. Real Granadilla Cardo Jinamar Santiponce Santa Agueda Bco. Tirajana Archipiélago Canario reducido al 65% MELILLA Santurce Zierbena Gatica Ortuella El Abra Nervacero Abanto A.C.V. Zamudio Babcock Alonsotegui Sidenor La Jara Gueñes Basauri Wind Power Generation: Expectations and Current Situation ARCHIPIÉLAGO CANARIO LA PALMA HIERRO GOMERA TENERIFE FUERTEVENTURA GRAN CANARIA LANZAROTE Sobradelo Santiago S. Pedro S. Esteban Zierbena Santurce A. Zinc Trasona Aceriasa El Palo TineoAntiñano Astillero Barcina 1536 Vitoria Lac Páramo de Poza D Oo Barcina 881 Cornatel Quereño Centelles Vic-S. Celoni 144 Begues Rubí P. Convención Canyet Badalona 4000 Tarragona Bellisens 0 Foix MENORCA CASTELLÓ DE LA PLANA (Castellón de la Plana) Es Bessons Son Orlandis 7023 MALLORCA CONEJERA 6500 CABRERA IBIZA FORMENTERA 496 Red de Transporte de Energía Eléctrica de España Enero Producers Expectations 442 Access Applications: MW (> MW gross) Aljarafe Guadaira La Fortuna Leganés RED ELÉCTRICA DE ESPAÑA Líneas Circuitos previstos instalados 1 1 En servicio En construcción y programadas En servicio Cable En construcción subterráneo / submarino y programadas Prevista transformación a 400 kv Tensiones 400 kv 220 kv 132/110 kv < 110 kv Todas las líneas se han dibujado en el color al que funcionan. En las construidas a tensión distinta ésta se indica entre paréntesis (F 400 kv) Regional Plans (MIN H2011rev) Total Peninsular: MW En servicio En construcción y programadas Wind Subestaciones Power Installed Hidráulica Centrales Térmica Térmica nuclear Total Peninsular: MW 21 Influence of wind connection on Transmission planning Wind Power connection and operation becomes one of the most significant motivations for the Transmission Network Plan Transmission Grid Development H2011rev Potencia eólica puesta en servicio (MW) P. C.: Potencia eólica conectada Influence from wind power connection: a nudos de la red (transp. o Penínsular 9182 (estimation: distr.) de many la Comunidad facilities are multipurpose) Autónoma Extrapenínsular 128 Moderate < 50% P.I.: Potencia eólica instalada físicamente en High la Comunidad % Total 9310 Autónoma Exclusive = 100% 22 11

12 Access and Connection : Overview Main Features Procedures Access Connection Access Application Perspective System Operation Transmission Object System behaviour Engineering and Physical Feasibility Definite Connection to Transmission >>> SO (REE) Connection to Distribution (> 50 MW, Scc limit.) > DO> SO (REE) Character Indicative REE issues a report evaluating access feasibility, fulfilling system security criteria Connection Application >>> Trans.Co. Agent submits engineering Project and Programme Trans.Co. elaborates Report of Technical Conditions for Connection SO (REE) supervises and issues a report Agent < TECHNICAL CONTRACT> Transmission Company 23 Access and Connection to the Transmission Grid ACCESS AGENT TRADER (as representative of eligible consumer) point) <<<< Application <<<< COMPLEMENTARY INF. >>>> Answer >>>> [< 1 month] Access Application (one by connection SO & TSM Information Analysis Identificationn of connection point TRANSCO Distribution Operator (if applies) Communication to owneroroperator Feasibility Report [ < 2 months] Feasibility Report Feasibility Report [ < 2 months] AGENT CONNECTION OS & GRT TRADER Project and Installation Programme (P&IP) (as representative of eligible consumer) Report[< 1 month] Analysis Report[< 1 month] TRANSCO Analysis and Determination of technical conditions Report on Technical Conditions for Connection (+ copy P&IP) [< 1 month] CONTRACT FOR ACCESS TO THE GRID [< 1 month] 24 12

13 Access and Connection : Costs Allocation Reinforcement and new facilities within the transmission grid Investment Actions directly associated to connection of qualified consumers or generators ( immediate reinforcement: existing/planned line and substation) paid by connecting agents (Guarantee of 20% of Trans Facilities to OS when connection application) Actions associated to support TransNet>DisNet retributed by system Reinforcement for grid meshing retributed by system Operation&Maintenance: retributed by system Small efficiency signal by Economy (distance to grid, local reinforcement) Uncertainty (non-local planned reinforcement), but very insufficient incentive to geographical energy balance 25 Cost Allocation of New Facilities Directly associated Transmission to connection Facilities Structural Reinforcement Connection Facilities Investment Cost Agent System (Agent guarantees 20% of Cost) Agent Operation and Maintenance Cost System System New bay New substation as in/out of existing line Existing Substation New bay TransGrid Connection Facilities (no TransGrid) 26 13

14 Contents The Wind Generation within Spanish system past and prospects Sensitive aspects of WG for the power system The WG within System Planning and Access to the Grid : Generation Expansion Planning Planning and Access Studies Wind Power Dimensioning within system The WG within System Operation Summary and Conclusions 27 Wind Penetration Studies Motivations: Significant increase of risk of loss of stability associated to intermitent energy source (mild) and insufficient immunity to system faults from machines (important), what may lead to Extended loss of load Loss of interconnection with UCTE 28 14

15 Loss of generation (18-Ene-04) 190 MW: Incidencias en L- 400 kv Barcina-Itxaso Y L-400 kv Grijota-Vitoria (d). 390 MW: Incidencias en L-220 kv Mercedes-Puentelarra, AT1 220/132 kv Puentelarra y L-220 kv Garoña-Puentelarra (g). 300 MW: Incidencias en Ls-132 kv Ormaiztegui-Hernani, 1 y 2 (f). 450 MW: Incidencia en L-400 kv Hernani-Itxaso y AT1 400/220 kv Güeñes. (e) 270 MW: Incidencia en L-220 kv Güeñes-La jara-ayala-poza de la Sal (c) y AT2 400/220 kv Güenes. 320 MW: Incidencia en Ls-220 kv Hernani-Itxaso, 1 y 2. a 01:01 h. (b) 29 Wind Penetration Studies Objectives: Identify technical limits for wind power production (reference for installation plans) Establish technical requirements for wind farms (fault ride-through capability) Explore alternative operation measures Ministery Plan H2011 (October 2002) Load Situation Admissible Wind Power MWinst Production (frtc 500 ms) (strategic increase of Peak MW former MW objective) Off-peak MW Current Review (advance of ongoing studies) Results very depending on % of adequate current generators (10GW). Future gen.: adequate Load Sit. % technology Admissible Wind adequacy of current Power Production Peak 50% < MW 75% MW MWinst??? 100% > MW Off-peak 0% MW 75% > MW 30 15

16 Technical Requirements for Wind Power Remain connected to the system in case of faults in the network (3/2/1 phase shorcircuits), allowing the protection system to clear de default (fault ride-through capability): Voltage time at the connection point to be supported (Approv. P.O.12.2; prop. REE P.O.12.3) Voltage (pu) 1 0,8 0,6 0,2 start of disturbance Fault length Situations where generators must remain connected 1ph and 2 ph faults Clearance of the fault 0,95 pu Requirements: Design: Generators and equipment must be able to carry currents during the fault Operation Appropriate protection adjustment 0 0, Time (sec) Limits in power consumption (P,Q) during the fault and recovery: exception periods ms- and lower restriction for unbalance faults 31 Wind Power Generation in Europe: (Installed MW, beginning 2005) 32 16

17 8.046 MW ins. Wind power 235 GWh anual demand 37,5 MW peak 41 Minhab. Comparison Spain-Germany Energy Data 2004 (UCTE) ( Peak : 3ºX-Dec) Interchange Cap. Data (ETSO) MW ins. Wind power(x2,1) 513 GWh anual demand (x2,2) 74 MW peak (x2) 83 Minhab (x2) Import Capacity F: MW P: MW MO: MW Import Capacity A: MW CZ: MW CH: MW DK: MW F: MW NL: MW PL: MW S: MW 33 Contents The Wind Generation within Spanish system Sensitive aspects of WG for the power system The WG within System Planning and Access to the Grid : Generation Expansion Planning Planning and Access Studies Wind Power Dimensioning within system The WG within System Operation Summary and Conclusions 34 17

18 Wind Production Forecast SIPREOLICO A Short Term Model Forecast of wind speed (HIRLAM Model) Information of wind farm characteristics Curves Power.vs. Wind speed Historic data hourly forecast for next 48 h real-time updating Day N-1 Day N Day N+1 REE Programming Operation Markets Real Time Operation DisCo (zonal info ) SIPREOLICO Reliability (i) Relative Error (Forecast.vs. Real Production) Relative Error (%) Average error (MW) Forecast Horizon (hours) 0 Average MW error Forecast Horizon (hours) Week 6-12 june 2005 Power Installed:8.959 MW Power Monitored: MW (80%) 36 18

19 Variability of wind power production: At national scope: typically maximum increase/decrease ramps Increase 800 MW/45 min Gradient: 1067 MW/h Reduction 1000 MW/ 1 h:45min Gradient -570 MW/h 37 Generation Control: Scope and Motivation In planning and access studies, production limitations are detected, which affect generators according to: electric zone (topological/geographical) generator technology (stability) TOPOLOGICAL SCOPE NATURE OF LIMITATION Transmission node (and Load flow capacity associated distribution) Short-circuit power (Scc) Stability Electric zones (and Load flow capacity associated distribution) Short-circuit power (Scc) sharing constraint Stability Power System Feasibility Balance P+jQ Stability TECHNOLOGY DISCRIMINATION Adequate generation control by REE enables adjust the operation, avoiding preventive (conservative) constraints upto confirmation within operation horizon (closer to real rime) 38 19

20 Production Control in Off-Peak periods(1 Jan 04) 39 Production Control in Off-Peak periods(1 Jan 04) Distribution zone A Distribution zone B Distribution zone C Distribution zone D 40 20

21 Production Control in Off-Peak periods (13 Jun 04) 41 Production Control in Off-Peak periods (13 Jun 04) Distribution zone A Distribution zone B Distribution zone C Distribution zone D 42 21

22 Production Control in Off-Peak periods(25 Sep 04) Production reduction required of 670 MW (2 to 8 h) 2-8 hours Reduction of 650 MW (97% required power) 43 Production Control in Off-Peak periods (26 sep 2004) Production reduction required of 570 MW (1 to 11 h) 1-11 hours Reduction of 500 MW (88 % required power) 44 22

23 Production Control in Off-Peak periods( 10 Oct 2004) Production reduction required of 410 MW (2 to 10 h) 5:45 h MW of wind power production with a load below MW (16%) Máximum reduction during the off peak of ~250 MW (68% required power) 45 Generation Control: Features Generation Control by REE involves: Capability of REE for receiving real time info from all wind plants (production, voltage, connectivity, wind speed, ) Capability of wind plants for receiving and executing REE s instructions : production control provision of system services For security and efficiency, this interlocution between REE and plants is not individual but via Control Dispatch Centers with control over a number of plants Human and technical resources (24 h) Secure and redundant Connection Dispatching Centre <> REE CC (computer<>computer, telephone) Connection Dispatching Centre <> Wind Farms-Generators This is specially relevant for wind generation due to large number of plants, agents and nodes involved, as well as specific technical requirements: CECRE

24 Large nº de nodes and Wind Farms current and foreseen Motivations for: Nº nodes TransGrid: 30 (> 100) GCD vs. NodeInt. Nº WF: 400 (>700) CECRE 47 CECRE Generation Control The large number of wind farms and grid nodes affected, as well as the development of company owned control centres, motivates that the system operation control needs are expected to be fulfilled by CECRE, as a dedicated centre for wind and in general for special regime: - Integrated within REE Control Structure - Mission: Real time Interlocution with generators - what for?: - monitoring required variables - issuing control instructions - how? Permanent Situation: Interlocution via Generation Control Centre. CECRE does not command or manoeuvre generation facilities; this is carried out by generation control dispatches Temporary Situation: Possible command function of CECRE as last resource control centre -Issues concerning production control criteria under development (basically agreed with generators associations to be approved as grid code) 48 24

25 CECRE Generation Control: Functional Scheme CECOEL / CECORE Iccp LInk Iccp LInk CECRE Link and Command (*) Iccp LInk Iccp LInk Link and Command (*) DD CONV DDRE 1 DDRE n Link and Command over facilities Link and Command Link and Command 49 Measures to avoid wind power reduction Objective: Reduce possible loss of wind power generation trying to avoid preventive reduction of production (over MW with full occupation of France-Spain capacity) Disadvantages: only in some cases and affects grid reliability Line opening (L-400 kv Mudarra-Grijota) reduces maximum wind power loss after ShortCircuit MW MW (situation with MW national production) 50 25

26 Market Participation (Sep05) Wind Power bidding is increasing, and currently 87% of WP is in market M W 100% 90% 80% 70% 60% 50% 40% 30% 20% 10 % 429 W IN D P O W E R IN M A R K E T Power Wind Non Market 13% Power Wind in Market 87% 0% DIST MARK J a n F e b M a r A p r M a y J u n J u l WP represents 77% of market in SpecReg, and present in most OUs Power Market from Non Wind 23% Power Market from Wind 77% Mixed OU 37% OUs 18% Wind OU 45% 51 Summary and Conclusions (i) Wind power is the most important and likely chapter for European and Spanish environmental targets : Sole renewable strategy option, with a good social approval (current) Notable Energetic firmness (independent of strategic factors) Insufficient guaranteed power: complementary resource Loss of the dispersed generation character: it does not avoid additional development of distribution network, but implies transmission network reinforcement Notable Development Plan of the Transmission Network (400 & 220 kv) Exceptional scope in European field Negotiation/execution faster for wind farms than for network reinforcements needed installation in zones with traditional excess of generation involves energy losses in the grid 52 26

R E D E L É C T R IC A D E E S P A Ñ A

R E D E L É C T R IC A D E E S P A Ñ A R E D E L É C T R IC A D E E S P A Ñ A Interacciones entre la avifauna y las instalaciones de transporte de energía eléctrica Mesa Redonda: Avifauna y líneas eléctricas: una convivencia necesaria RED DE

Más detalles

102 Sistema eléctrico español El sistema eléctrico por comunidades autónomas

102 Sistema eléctrico español El sistema eléctrico por comunidades autónomas 102 Sistema eléctrico español 2012 CA El sistema eléctrico por comunidades autónomas Sistema eléctrico español 2012 103 Balance de energía eléctrica 104 Estructura de la producción del régimen ordinario

Más detalles

El sistema eléctrico por comunidades autónomas

El sistema eléctrico por comunidades autónomas CA El sistema eléctrico por comunidades autónomas Gráficos y cuadros /// Sistema eléctrico español 2011 109 110 111 112 113 114 116 117 Balance de energía eléctrica Estructura de la producción del régimen

Más detalles

INVENTARIO DE ELEMENTOS DE LA RED DE TRANSPORTE DE ENERGÍA ELÉCTRICA

INVENTARIO DE ELEMENTOS DE LA RED DE TRANSPORTE DE ENERGÍA ELÉCTRICA INVENTARIO DE ELEMENTOS DE LA RED DE TRANSPORTE DE ENERGÍA ELÉCTRICA Junio 2013 1 Inventario de elementos de la red de transporte de energía eléctrica Actualizado a junio de 2013. La red de transporte

Más detalles

ESTA CONFERENCE. Standards to Improve The Cash Cycle. May 23r d 24 th, 2011. Operations - Spain Department Central Cash Mgmt. Date 05.

ESTA CONFERENCE. Standards to Improve The Cash Cycle. May 23r d 24 th, 2011. Operations - Spain Department Central Cash Mgmt. Date 05. ESTA CONFERENCE Standards to Improve The Cash Cycle May 23r d 24 th, 2011 Area Operations - Spain Department Central Cash Mgmt Type Internal Date 05.2011 El presente documento es propiedad de BBVA y ha

Más detalles

Spanish DSM initiatives 26th March 2008 Task XV Meeting

Spanish DSM initiatives 26th March 2008 Task XV Meeting Spanish DSM initiatives 26th March 2008 Task XV Meeting 1 Index 1. The Spanish electricity system 2. Electricity demand in Spain 3. DSM in Spain 4. Conclusions The Spanish electricity system Small producers

Más detalles

Modelos de sistemas de energía eléctrica

Modelos de sistemas de energía eléctrica Modelos de sistemas de energía eléctrica Caracterización de un sistema de energía eléctrica Andrés Ramos Contenido 1. Atributos de clasificación 2. Técnicas matemáticas cuantitativas Modelos de sistemas

Más detalles

VIZCAYA GUIPUZCOA ALAVA NAVARRA BURGOS LA RIOJA HUESCA SORIA ZARAGOZA CUENCA CIUDAD REAL ALBACET E ALICANTE CORDOBA JAÉN MURCIA ALMERIA

VIZCAYA GUIPUZCOA ALAVA NAVARRA BURGOS LA RIOJA HUESCA SORIA ZARAGOZA CUENCA CIUDAD REAL ALBACET E ALICANTE CORDOBA JAÉN MURCIA ALMERIA LA CORUÑA LUGO ASTURIAS CANTABRIA VIZCAYA GUIPUZCOA ALAVA PONTEVEDRA ORENSE LEON BURGOS PALENCIA NAVARRA LA RIOJA HUESCA LÉRIDA GERONA ZAMORA VALLADOLID SORIA ZARAGOZA BARCELONA SEGOVIA TARRAGONA SALAMANCA

Más detalles

CONECTE LAS SEDES DE SU EMPRESA DE FORMA INTELIGENTE

CONECTE LAS SEDES DE SU EMPRESA DE FORMA INTELIGENTE , 25 de Enero de 2007 CONECTE LAS SEDES DE SU EMPRESA DE FORMA INTELIGENTE La Red Privada como Alternativa Eficaz para Empresas en Crecimiento Fernando Conde Rodríguez Gerente de Ingeniería a de Clientes.

Más detalles

II Jornadas Internacionales de Innovación Energética Energías Renovables y Desarrollo Sostenible Energía y Territorio

II Jornadas Internacionales de Innovación Energética Energías Renovables y Desarrollo Sostenible Energía y Territorio II Jornadas Internacionales de Innovación Energética Energías Renovables y Desarrollo Sostenible Energía y Territorio Jordi Dolader i Clara Ex Consejero de la Comisión Nacional de Energía Consultor Independiente

Más detalles

1. Temperaturas medias, horas de sol y precipitación acuosa

1. Temperaturas medias, horas de sol y precipitación acuosa Año Andalucía Almería Cádiz Córdoba Granada Jaén Huelva Málaga Sevilla Mes (aeropuerto) (aeropuerto) (Armilla) (aeropuerto) (aeropuerto) 2009 19,2 19,1 18,9 16,3 17,7 18,8 19,2 20,3 2010 19,1 19,3 18,3

Más detalles

Tipología Penal 2013 2014 Var. % 14/13 1.-DELITOS Y FALTAS (EU)

Tipología Penal 2013 2014 Var. % 14/13 1.-DELITOS Y FALTAS (EU) ANDALUCÍA 373.846 352.420-5,7 65 68 4,6 13.874 11.732-15,4 10.531 8.396-20,3 67.166 58.046-13,6 22.031 19.391-12,0 9.125 8.354-8,4 3.274 3.339 2,0 36.487 34.660-5,0 127.933 116.073-9,3 1 de 221 Provincia

Más detalles

Acumulado enero a marzo. Tipología Penal 2014 2015 Var. % 15/14 1.-DELITOS Y FALTAS (EU)

Acumulado enero a marzo. Tipología Penal 2014 2015 Var. % 15/14 1.-DELITOS Y FALTAS (EU) ANDALUCÍA 86.905 85.264-1,9 20 14-30,0 2.962 2.588-12,6 2.204 1.835-16,7 15.915 14.613-8,2 5.504 4.890-11,2 2.044 2.190 7,1 809 761-5,9 9.080 8.808-3,0 28.070 27.273-2,8 1 de 221 Provincia de Almería 7.721

Más detalles

La energía eléctrica por Comunidades Autónomas

La energía eléctrica por Comunidades Autónomas La energía eléctrica por Comunidades Autónomas 1999 RED ELÉCTRICA DE ESPAÑA Glosario de Términos b.a.: bornes de alternador. b.c.: barras de central. Las energías medidas en estos puntos tienen deducidos

Más detalles

CALENDARIO DE FIESTAS LABORALES 2006

CALENDARIO DE FIESTAS LABORALES 2006 M O N O G R A F Í A Nº 60 4 DE ENERO DE 2006 CALENDARIO DE FIESTAS LABORALES 2006 Las diferentes fiestas laborales (nacionales, autonómicas y locales) pueden plantear problemas a la hora de efectuar viajes

Más detalles

INVENTARIO DE ELEMENTOS DE LA RED DE TRANSPORTE DE ENERGÍA ELÉCTRICA

INVENTARIO DE ELEMENTOS DE LA RED DE TRANSPORTE DE ENERGÍA ELÉCTRICA INVENTARIO DE ELEMENTOS DE LA RED DE TRANSPORTE DE ENERGÍA ELÉCTRICA Junio 2012 1 Inventario de elementos de la red de transporte de energía eléctrica Actualizado a junio de 2012. La red de transporte

Más detalles

VALORACIÓN PARCIAL ÁREA DE TRANSPARENCIA: A) INFORMACIÓN SOBRE LA CORPORACIÓN MUNICIPAL 2010 (Media General: 68,1)

VALORACIÓN PARCIAL ÁREA DE TRANSPARENCIA: A) INFORMACIÓN SOBRE LA CORPORACIÓN MUNICIPAL 2010 (Media General: 68,1) VALORACIÓN PARCIAL ÁREA DE TRANSPARENCIA: A) INFORMACIÓN SOBRE LA CORPORACIÓN MUNICIPAL 2010 (Media General: 68,1) PUNTUACIÓN AYUNTAMIENTOS (Entre 1 y 100) 1 ALCOBENDAS 100,0 1 BILBAO 100,0 1 GIJÓN 100,0

Más detalles

VALORACIÓN PARCIAL ÁREA DE TRANSPARENCIA: A) INFORMACIÓN SOBRE LA CORPORACIÓN MUNICIPAL 2009 (Media General: 71,4)

VALORACIÓN PARCIAL ÁREA DE TRANSPARENCIA: A) INFORMACIÓN SOBRE LA CORPORACIÓN MUNICIPAL 2009 (Media General: 71,4) VALORACIÓN PARCIAL ÁREA DE TRANSPARENCIA: A) INFORMACIÓN SOBRE LA CORPORACIÓN MUNICIPAL 2009 (Media General: 71,4) AYUNTAMIENTOS PUNTUACIÓN (Entre 1 y 100) 1 ALCORCÓN 100,0 1 BILBAO 100,0 1 ELCHE 100,0

Más detalles

VALORACIÓN PARCIAL ÁREA DE TRANSPARENCIA: A) INFORMACIÓN SOBRE LA CORPORACIÓN MUNICIPAL 2012 (Media General: 72,2)

VALORACIÓN PARCIAL ÁREA DE TRANSPARENCIA: A) INFORMACIÓN SOBRE LA CORPORACIÓN MUNICIPAL 2012 (Media General: 72,2) VALORACIÓN PARCIAL ÁREA DE TRANSPARENCIA: A) INFORMACIÓN SOBRE LA CORPORACIÓN MUNICIPAL 2012 (Media General: 72,2) PUNTUACIÓN AYUNTAMIENTOS (Entre 1 y 100) 1 ALBACETE 100,0 1 ALCOBENDAS 100,0 1 ARONA 100,0

Más detalles

ÍNDICE DE TRANSPARENCIA DE LOS AYUNTAMIENTOS 2017 VALORACIÓN GLOBAL (MEDIA GENERAL: 89,7)

ÍNDICE DE TRANSPARENCIA DE LOS AYUNTAMIENTOS 2017 VALORACIÓN GLOBAL (MEDIA GENERAL: 89,7) ÍNDICE DE TRANSPARENCIA DE LOS AYUNTAMIENTOS 2017 VALORACIÓN GLOBAL (MEDIA GENERAL: 89,7) AYUNTAMIENTOS PUNTUACIÓN (Entre 1 y 100) 1 ALCOBENDAS 100 1 ALICANTE 100 1 BARAKALDO 100 1 BARCELONA 100 1 BILBAO

Más detalles

VALORACIÓN PARCIAL ÁREA DE TRANSPARENCIA: A) TRANSPARENCIA ACTIVA E INFORMACIÓN SOBRE LA CORPORACIÓN MUNICIPAL 2017 (Media General: 92,7)

VALORACIÓN PARCIAL ÁREA DE TRANSPARENCIA: A) TRANSPARENCIA ACTIVA E INFORMACIÓN SOBRE LA CORPORACIÓN MUNICIPAL 2017 (Media General: 92,7) VALORACIÓN PARCIAL ÁREA DE TRANSPARENCIA: A) TRANSPARENCIA ACTIVA E INFORMACIÓN SOBRE LA CORPORACIÓN MUNICIPAL 2017 (Media General: 92,7) AYUNTAMIENTOS PUNTUACIÓN (Entre 1 y 100) 1 ALBACETE 100 1 ALCALÁ

Más detalles

Capítulo 8 DESCRIPCIÓN DE LAS INSTALACIONES DE LA RED DE TRANSPORTE ELÉCTRICO A DESARROLLAR Y SU ESTIMACIÓN ECONÓMICA. Capítulo 8

Capítulo 8 DESCRIPCIÓN DE LAS INSTALACIONES DE LA RED DE TRANSPORTE ELÉCTRICO A DESARROLLAR Y SU ESTIMACIÓN ECONÓMICA. Capítulo 8 DESCRIPCIÓN DE LAS INSTALACIONES DE LA RED DE TRANSPORTE ELÉCTRICO A DESARROLLAR Y SU ESTIMACIÓN ECONÓMICA RETELGAS 13/09/2002 8. DESCRIPCIÓN DE LAS INSTALACIONES DE LA RED DE TRANSPORTE ELÉCTRICO A DESARROLLAR

Más detalles

Desarrollo de la red de transporte

Desarrollo de la red de transporte Desarrollo de la red de transporte 7 Planificación de la red de transporte Entre las actividades desarrolladas durante 1997 relacionadas con la planificación de la red de transporte, tanto en sus aspectos

Más detalles

1.1. Padrón Municipal de Habitantes 1998

1.1. Padrón Municipal de Habitantes 1998 1. Los habitantes 1.1. Padrón Municipal de Habitantes 1998 1.1.1. Población según sexo por provincias y capitales Provincia Capital Ambos sexos Varones Mujeres Ambos sexos Varones Mujeres TOTAL 39.852.651

Más detalles

Demografía. 1. Población Padrón Municipal de Habitantes Población según sexo por provincias y capitales. Año 1999

Demografía. 1. Población Padrón Municipal de Habitantes Población según sexo por provincias y capitales. Año 1999 1. Población 1.1. Padrón Municipal de Habitantes 1.1.1. Población según sexo por provincias y capitales. Año 1999 Provincia Capital Ambos sexos Varones Mujeres Ambos sexos Varones Mujeres TOTAL 40.202.160

Más detalles

The Role of Natural Gas and Gas Infrastructure as an Enabler of the Renewable and Low Carbon Economy. Francisco P. de la Flor

The Role of Natural Gas and Gas Infrastructure as an Enabler of the Renewable and Low Carbon Economy. Francisco P. de la Flor The Role of Natural Gas and Gas Infrastructure as an Enabler of the Renewable and Low Carbon Economy Francisco P. de la Flor UNECE, 24 January 212 1 Enagas; Basic Infrastruture Operator E&P Licuef. International

Más detalles

La energía eléctrica por Comunidades Autónomas 2000

La energía eléctrica por Comunidades Autónomas 2000 La energía eléctrica por Comunidades Autónomas 2 RED ELÉCTRICA DE ESPAÑA GLOSARIO DE TÉRMINOS b.a.: bornes de alternador. b.c.: barras de central. Las energías medidas en estos puntos tienen deducidos

Más detalles

Expediente nº: INF/DE/160/16 SALA DE SUPERVISIÓN REGULATORIA. Presidenta Dª. María Fernández Pérez

Expediente nº: INF/DE/160/16 SALA DE SUPERVISIÓN REGULATORIA. Presidenta Dª. María Fernández Pérez ACUERDO POR EL QUE SE CONTESTA A LA SOLICITUD DE LA SECRETARÍA DE ESTADO DE ENERGÍA DE INFORME COMPLEMENTARIO AL INFORME SOBRE EL ACUERDO DE 17 DE NOVIEMBRE DE 2016, POR EL QUE SE PROPONE LA RETRIBUCIÓN

Más detalles

VALORACIÓN PARCIAL ÁREA DE TRANSPARENCIA: A) INFORMACIÓN SOBRE LA CORPORACIÓN MUNICIPAL 2014 (Media General: 86,3)

VALORACIÓN PARCIAL ÁREA DE TRANSPARENCIA: A) INFORMACIÓN SOBRE LA CORPORACIÓN MUNICIPAL 2014 (Media General: 86,3) VALORACIÓN PARCIAL ÁREA DE TRANSPARENCIA: A) INFORMACIÓN SOBRE LA CORPORACIÓN MUNICIPAL 2014 (Media General: 86,3) PUNTUACIÓN AYUNTAMIENTOS (Entre 1 y 100) 1 ALCALÁ DE HENARES 100,0 1 ALCOBENDAS 100,0

Más detalles

ÍNDICE DE TRANSPARENCIA DE LOS AYUNTAMIENTOS 2010 VALORACIÓN GLOBAL (MEDIA GENERAL: 70,2)

ÍNDICE DE TRANSPARENCIA DE LOS AYUNTAMIENTOS 2010 VALORACIÓN GLOBAL (MEDIA GENERAL: 70,2) ÍNDICE DE TRANSPARENCIA DE LOS AYUNTAMIENTOS 2010 VALORACIÓN GLOBAL (MEDIA GENERAL: 70,2) AYUNTAMIENTOS 1 BILBAO 100,0 1 GIJÓN 100,0 1 PONFERRADA 100,0 1 PUERTO DE SANTA MARÍA 100,0 1 SABADELL 100,0 1

Más detalles

IMPORTE TOTAL DE CONTRATACIÓN COMUNICADO AL REGISTRO PÚBLICO DE CONTRATOS

IMPORTE TOTAL DE CONTRATACIÓN COMUNICADO AL REGISTRO PÚBLICO DE CONTRATOS 4. IMPORTE TOTAL DE CONTRATACIÓN COMUNICADO AL REGISTRO PÚBLICO DE CONTRATOS 48.16 35. Millones de pesetas 3. 25. 2. 15. 1. 83.669 11.915 15.257 2.9 253.128 5. 1993 1994 1995 1996 1997 1998 AÑOS OBRAS

Más detalles

El sistema eléctrico por comunidades autónomas

El sistema eléctrico por comunidades autónomas 100 El sistema eléctrico por comunidades autónomas SISTEMA ELÉCTRICO ESPAÑOL GRÁFICOS Y CUADROS 102 Balance de energía eléctrica 103 Estructura de la producción del régimen ordinario por tipo de central

Más detalles

DE ESPAÑA. Aparecida Zamora. Integración paisajística de subestaciones. 14 de julio de 2005

DE ESPAÑA. Aparecida Zamora. Integración paisajística de subestaciones. 14 de julio de 2005 RED ELÉCTRICA DE ESPAÑA SUBESTACIÓN DE Aparecida Zamora Integración paisajística de subestaciones 14 de julio de 2005 Dirección de Comunicación y Relaciones Institucionales Gabinete de Prensa Red Eléctrica

Más detalles

MADRID. Madrid ciudad. Empresa Expositora. Promhogar. Cismisa. Gilmar Consulting Inmobiliario. Ciudad de los Angeles. Grupo Caixa Catalunya.

MADRID. Madrid ciudad. Empresa Expositora. Promhogar. Cismisa. Gilmar Consulting Inmobiliario. Ciudad de los Angeles. Grupo Caixa Catalunya. MADRID Madrid ciudad ZONA Aravaca Calderón Carabanchel Casarrubuelos Centro Chamberí Empresa Expositora Pecsa Gestión Inmobiliaria Ciudad de los Angeles Ciudad Lineal Ciudad Universitaria Ensanche de Vallecas

Más detalles

EVOLUCIÓN MENSUAL DE LAS PENSIONES DEL SISTEMA DE LA SEGURIDAD SOCIAL

EVOLUCIÓN MENSUAL DE LAS PENSIONES DEL SISTEMA DE LA SEGURIDAD SOCIAL DICIE EMBRE 2014 EVOLUCIÓN MENSUAL DE LAS PENSIONES DEL SISTEMA DE LA SEGURIDAD SOCIAL Numero de Pensiones Importe mensual nómina pensiones Media Nuevas altas de pensiones Numero de pensiones e importe

Más detalles

Mercantile Companies Statistics February 2015. Provisional data

Mercantile Companies Statistics February 2015. Provisional data 15 April 2015 Mercantile Companies Statistics February 2015. Provisional data 8,712 mercantile companies are created in January, 3.0% less than in the same month of 2014, and 2,072 are dissolved, 2.5%

Más detalles

sistema eléctrico por comunidades autónomas

sistema eléctrico por comunidades autónomas Sístema eléctrico español 2009 / gráficos y cuadros sistema eléctrico por comunidades CAEl autónomas 112 Balance de energía eléctrica 113 Estructura de la producción del régimen ordinario por tipo de central

Más detalles

Todas las comarcas 0,10 0,33 0,18 0,35 0,20 0,39 0,22. Todas las comarcas 0,10 0,33 0,18 0,35 0,20 0,39 0,22

Todas las comarcas 0,10 0,33 0,18 0,35 0,20 0,39 0,22. Todas las comarcas 0,10 0,33 0,18 0,35 0,20 0,39 0,22 AGRUPACION ESPAÑOLA DE ENTIDADES TARIFA DE PRIMAS COMERCIALES DE LOS SEGUROS : PLAN - 2009 PAG: 1 01 ALAVA 02 ALBACETE 03 ALICANTE 04 ALMERIA 05 AVILA 06 BADAJOZ 07 BALEARES 08 BARCELONA 09 BURGOS 10 CACERES

Más detalles

- PRINCIPALES OFICINAS DE EMPLEO/DIPUTACIONES PROVINCIALES -

- PRINCIPALES OFICINAS DE EMPLEO/DIPUTACIONES PROVINCIALES - - PRINCIPALES OFICINAS DE EMPLEO/DIPUTACIONES PROVINCIALES -. (Diputación l) Diputación l de Madrid C/ ESPARTINAS, 10 Madrid - 28005 Teléfono 915206000 Alcalá de Henares - Estación Pso. De la Estación,

Más detalles

Contribución de las tecnologías de generación eléctrica a la garantía de suministro en el sistema español.

Contribución de las tecnologías de generación eléctrica a la garantía de suministro en el sistema español. Contribución de las tecnologías de generación eléctrica a la garantía de suministro en el sistema español. Miguel Duvison García Director de Operación ICAI - 12 de abril de 2011 Operación del Sistema Eléctrico

Más detalles

HIGH SPEED RAIL AND SOCIETY COMPETITION AND COMPLEMENTARITY BETWEEN TRANSPORT MODES

HIGH SPEED RAIL AND SOCIETY COMPETITION AND COMPLEMENTARITY BETWEEN TRANSPORT MODES HIGH SPEED RAIL AND SOCIETY COMPETITION AND COMPLEMENTARITY BETWEEN TRANSPORT MODES Antonio Monfort Bernat General Manager INECOTIFSA Fast track to Sustainable Mobility DISTRIBUTION OF SPANISH POPULATION

Más detalles

Subdirección de Desarrollo de Proyectos. March 2012

Subdirección de Desarrollo de Proyectos. March 2012 S March 2012 CFE is Comisión Federal de Electricidad (CFE) is a public & decentralized agency, with legal personality and properties, created in 1937 due to a Presidential decree. CFE generates, transmits,

Más detalles

VALORACIÓN PARCIAL ÁREA DE TRANSPARENCIA:

VALORACIÓN PARCIAL ÁREA DE TRANSPARENCIA: VALORACIÓN PARCIAL ÁREA DE TRANSPARENCIA: A) INFORMACIÓN SOBRE LA CORPORACIÓN MUNICIPAL (Media General: 69 6) AYUNTAMIENTOS PUNTUACIÓN (Entre 1 y 100) 1 Barcelona 100,0 1 Bilbao 100,0 1 Cartagena 100,0

Más detalles

Reunión del Comité Técnico de Seguimiento de la Operación del. 11 de marzo del 2010

Reunión del Comité Técnico de Seguimiento de la Operación del. 11 de marzo del 2010 Reunión del Comité Técnico de Seguimiento de la Operación del Sistema Ibérico 11 de marzo del 2010 Índice Operación del Sistema Incidentes en el Sistema Eléctrico Español Problemas de integración de la

Más detalles

www.sepe.es Trabajamos para ti

www.sepe.es Trabajamos para ti COMPLEMENTO-3. TRÁFICO DE VOZ FIJA. 1 A CORUÑA Tarifa Plana 4513 12.498,17 4658 13.584,20 3390 9.344,55 A CORUÑA De fijo a movil desde OOEEs 1708 3.412,20 1733 3.246,62 1403 2.906,23 A CORUÑA De fijo a

Más detalles

JULIO 2018 EVOLUCIÓN DEL PARO REGISTRADO POR SEXO Y EDADES

JULIO 2018 EVOLUCIÓN DEL PARO REGISTRADO POR SEXO Y EDADES Julio 2018 Dato Absoluta Relativa Dato Absoluta Relativa Dato MENORES DE 25 AÑOS Varones 119.765-2.717-2,22 122.482-9.630-7,44 129.395 Mujeres 117.886 194 +0,16 117.692-5.887-4,76 123.773 Ambos sexos 237.651-2.523-1,05

Más detalles

Anexo Información básica del sector eléctrico

Anexo Información básica del sector eléctrico Comisión del Sistema Eléctrico Nacional Anexo Información básica del sector eléctrico 1996 Indice 1. Información sobre la producción eléctrica 1.1. Balance anual de explotación 5 1.2. Máximas demandas

Más detalles

Listado de precios Destacado en una Población*

Listado de precios Destacado en una Población* Listado de precios Destacado en una Población* Provincia Población 3 Meses 6 Meses (10% descuento incluido) 12 Meses (20% de descuento incluido) Álava Vitoria 90 162 288 Albacete Albacete 63 113 202 Alicante

Más detalles

Boletín Hidrológico Semanal

Boletín Hidrológico Semanal Boletín Hidrológico Semanal Información pluviométrica desde el 25 de enero de 2016 hasta el 01 de febrero de 2016 Los datos de pluviometría son provisionales y facilitados por la Agencia Estatal de Meteorología.

Más detalles

El desarrollo de la eólica desde la óptica de los ayuntamientos: Retos y oportunidades

El desarrollo de la eólica desde la óptica de los ayuntamientos: Retos y oportunidades El desarrollo de la eólica desde la óptica de los ayuntamientos: Retos y oportunidades Foro sobre energías renovables en la Manchuela 19 de mayo de 2005 WWF/Adena El cambio climático, el desafío mundial

Más detalles

Subestación donde se localizan las nuevas posiciones. Tensión del parque donde se localizan las nuevas posiciones

Subestación donde se localizan las nuevas posiciones. Tensión del parque donde se localizan las nuevas posiciones CONTENIDO DE LA TABLA ASOCIADA CCAA SUBESTACIÓN ALCANCE / POSICIONES kv PES N / A T.A. Tecnol. CCAA a la que pertenece la actuación Subestación donde se localizan las nuevas posiciones Descripción y alcance

Más detalles

OBSERVATORIO DE LA JUVENTUD EN ESPAÑA. estadística-injuve. cifras jóvenes JULIO AVANCE PARO REGISTRADO. JÓVENES años

OBSERVATORIO DE LA JUVENTUD EN ESPAÑA. estadística-injuve. cifras jóvenes JULIO AVANCE PARO REGISTRADO. JÓVENES años cifras jóvenes JULIO 2015 AVANCE PARO REGISTRADO JÓVENES 16-24 años Julio 2015 Dato Absoluta Relativa Dato Absoluta Relativa Dato MENORES DE 25 AÑOS Varones 174.117-6.038-3,35 180.155-31.951-15,51 206.068

Más detalles

FEBRERO 2018 EVOLUCIÓN DEL PARO REGISTRADO POR SEXO Y EDADES

FEBRERO 2018 EVOLUCIÓN DEL PARO REGISTRADO POR SEXO Y EDADES Febrero 2018 Dato Absoluta Relativa Dato Absoluta Relativa Dato MENORES DE 25 AÑOS Varones 140.963 4.582 +3,36 136.381-14.553-9,36 155.516 Mujeres 135.179 3.766 +2,87 131.413-10.938-7,49 146.117 Ambos

Más detalles

CUENTAS DE RESULTADOS PROVISIONALES 2011 Y OTROS DATOS SIGNIFICATIVOS

CUENTAS DE RESULTADOS PROVISIONALES 2011 Y OTROS DATOS SIGNIFICATIVOS ALBACETE ALGECIRAS / HELIPUERTO ALICANTE ALMERÍA ASTURIAS BADAJOZ BARCELONA-EL PRAT 0,13 0,11 112,26 8,33 12,46 0,58 440,39 0,10 0,11 109,31 7,42 11,98 0,39 434,87 0,09 0,11 74,59 4,50 8,48 0,34 309,95

Más detalles

LINEA: 415 - SEGURO RETIRADA Y DESTRU. MODULO: 1. TARIFA: 1.043-1130- RyD - Cérvidos-Cérvidos RETIRADA Y DESTRUCCION ESPECIE GRUPO RAZAS TIPO ANIMAL

LINEA: 415 - SEGURO RETIRADA Y DESTRU. MODULO: 1. TARIFA: 1.043-1130- RyD - Cérvidos-Cérvidos RETIRADA Y DESTRUCCION ESPECIE GRUPO RAZAS TIPO ANIMAL PLAN: 2.015 SECTOR PRODUCTIVO: 016 - Ganado Página: 1 TARIFA: 1.043-1130- RyD - Cérvidos-Cérvidos RETIRADA Y DESTRUCCION 19 CERVIDOS 10 TODOS 3 TODAS 1 TODOS TARIFA: 1.044-1675- RyD -PiscifactorÍas Marina-Cría

Más detalles

BOLETÍN OFICIAL DEL ESTADO

BOLETÍN OFICIAL DEL ESTADO Núm. 46 Lunes 23 de febrero de 2015 Sec. I. Pág. 15471 ANEXO Plantilla del Ministerio Fiscal Fiscalía General del Estado Inspección Fiscal Fiscal Jefe Inspector.... 1 1 RD Madrid.... Teniente Fiscal Inspector...

Más detalles

RED ELÉC T RI C A DE ESPAÑA

RED ELÉC T RI C A DE ESPAÑA RED ELÉC T RI C A DE ESPAÑA Efectos de la penetración eólica sobre las necesidades de reserva rodante Enero de 2006 La energía eólica y su integración en la red 1 Potencia neta instalada Diciembre 2005

Más detalles

Operación del Sistema Eléctrico 2000

Operación del Sistema Eléctrico 2000 Operación del Sistema Eléctrico 2000 RED ELÉCTRICA DE ESPAÑA 1. El Sector Eléctrico Español en 2000 3 2. Demanda de energía eléctrica 11 2.1 Comportamiento de la demanda de energía eléctrica 11 2.2 Factores

Más detalles

3. Generación de energía eléctrica en el sistema eléctrico peninsular... 39

3. Generación de energía eléctrica en el sistema eléctrico peninsular... 39 ÍNDICE DE CUADROS Y GRÁFICOS 3. Generación de energía eléctrica en el sistema eléctrico peninsular... 39 3.1.1 Cobertura de la demanda de energía eléctrica. Sistema eléctrico peninsular (GWh)... 44 3.1.2

Más detalles

Pensiones de la Seguridad Social. Enero 2017

Pensiones de la Seguridad Social. Enero 2017 Pensiones de la Seguridad Social Enero 2017 PENSIONES PENSIONES CONTRIBUTIVAS EN VIGOR A 1 DE ENERO DE 2017 DISTRIBUCIÓN POR REGÍMENES Y CLASES DE PENSIÓN (Importe en miles de euros) INCAP. PERMANENTE

Más detalles

TABLA 1.- Comunidades Autónomas (CC. AA.) Precio medio de la vivienda en alquiler ( /m 2 al mes) y variaciones mensual, trimestral e interanual (%)

TABLA 1.- Comunidades Autónomas (CC. AA.) Precio medio de la vivienda en alquiler ( /m 2 al mes) y variaciones mensual, trimestral e interanual (%) TABLA 1.- Comunidades Autónomas (CC. AA.) Precio medio de la vivienda en alquiler ( /m 2 al mes) y variaciones mensual, trimestral e interanual (%) CC.AA. OCT. NOV. DIC. mensual *(%) trimestral **(%) interanual

Más detalles

LINEA: 415 - SEGURO RETIRADA Y DESTRU. MODULO: 1. TARIFA: 1.000-1232- RyD Bovino Cebo Industrial RETIRADA Y DESTRUCCION ESPECIE GRUPO RAZAS

LINEA: 415 - SEGURO RETIRADA Y DESTRU. MODULO: 1. TARIFA: 1.000-1232- RyD Bovino Cebo Industrial RETIRADA Y DESTRUCCION ESPECIE GRUPO RAZAS PLAN: 2.015 SECTOR PRODUCTIVO: 016 - Ganado Página: 1 TARIFA: 1.000-1232- RyD Bovino Cebo Industrial 1 BOVINO 1 CEBO INDUSTRIAL 3 TODAS 3 ENGORDE TARIFA: 1.001-1233- RyD Bovino Reproductor Recría Carne

Más detalles

1. Temperaturas medias, horas de sol y precipitación acuosa

1. Temperaturas medias, horas de sol y precipitación acuosa Año Andalucía Almería Cádiz Córdoba Granada Jaén Huelva Málaga Sevilla Mes (aeropuerto) (aeropuerto) (Armilla) (aeropuerto) (aeropuerto) 2011 19,3 19,5 18,9 16,1 17,8 18,9 19,3 20,3 2012 18,6 18,7 18,6

Más detalles

Precio medio de la vivienda en Venta en España AGOSTO 2013

Precio medio de la vivienda en Venta en España AGOSTO 2013 Precio medio de la vivienda en Venta en España AGOSTO TABLA 1.- Comunidades Autónomas (CC. AA.) Precio medio de la vivienda en venta ( /m 2 ) y variaciones mensual, trimestral e interanual (%) TABLA 2.-

Más detalles

Seminario de Electrónica Industrial

Seminario de Electrónica Industrial Elena Villanueva Méndez Parques eólicos y conexión a la red. Valparaíso, Junio de 2010 Parques eólicos Altas demandas dinámicas: Control de frecuencia y voltaje Control de potencia activa y reactiva Respuesta

Más detalles

Informe Anual de la Evolución de la Corriente de Cortocircuito en la red de transporte del Sistema Eléctrico Peninsular Español en el año 2016

Informe Anual de la Evolución de la Corriente de Cortocircuito en la red de transporte del Sistema Eléctrico Peninsular Español en el año 2016 Informe Anual de la Evolución de la Corriente de Cortocircuito en la red de transporte del Sistema Eléctrico Peninsular Español en el año 2016 Dirección de Desarrollo del Sistema Dpto. Fiabilidad del Sistema

Más detalles

El precio medio de la vivienda en Alquiler en España Octubre 2014

El precio medio de la vivienda en Alquiler en España Octubre 2014 El precio medio de la vivienda en Alquiler en España Octubre TABLA 1.- Comunidades Autónomas (CC. AA.) Precio medio de la vivienda en alquiler ( /m 2 al mes) y variaciones mensual, trimestral e interanual

Más detalles

Fecha, hora y lugares de celebración de la 1ª evaluación

Fecha, hora y lugares de celebración de la 1ª evaluación Fecha, hora y lugares de celebración de la 1ª evaluación DÍA: Jueves, 9 de abril, a las 16:30 horas (15:30 horas en la Comunidad Canaria). LUGARES: (Para aclarar cualquier duda sobre el lugar, deben dirigirse

Más detalles

3. Evolución del valor tasado de las viviendas libres.

3. Evolución del valor tasado de las viviendas libres. 3. Evolución del valor tasado de las viviendas s. EUROPA III Trimestre 2015 II Trimestre 2015 ESPAÑA 1.476,0 1.741,9 1.465,9 1.476,8 1.732,9 1.467,5 ANDALUCÍA 1.218,7 1.367,5 1.215,9 1.213,0 1.360,4 1.210,2

Más detalles

COLEGIOS DE ABOGADOS QUE PERMITEN LA SOLICITUD TELEMÁTICAMENTE:

COLEGIOS DE ABOGADOS QUE PERMITEN LA SOLICITUD TELEMÁTICAMENTE: PETICIÓN DE CITA EN APLICACIÓN DEL PROTOCOLO DE CONFORMIDADES PARA ABOGADOS PERTENECIENTES AL COLEGIO DE MADRID EN COLEGIOS DE ABOGADOS DISTINTOS DEL ICAM Todos los abogados del Colegio de Madrid que deseéis

Más detalles

Variación mensual *(%)

Variación mensual *(%) TABLA 1.- Comunidades Autónomas (CC. AA.) CC.AA. OCT. NOV. DIC. mensual *(%) trimestral **(%) interanual ***(%) Andalucía 1.940 1.814 1.801 1.799 1.799 0,0% -0,9% -7,3% Aragón 2.300 2.153 2.117 2.108 2.092-0,8%

Más detalles

TENDENCIAS EN GENERACION EOLICA

TENDENCIAS EN GENERACION EOLICA TENDENCIAS EN GENERACION EOLICA Alberto Ceña Director Técnico RED TEMATICA DE INTEGRACION DE LA EOLICA EN EL SISTEMA ELECTRICO 25 OCTUBRE 2006 1 INDICE SITUACIÓN DE LA ENERGÍA EÓLICA EN ESPAÑA BENEFICIOS

Más detalles

El importe medio de las hipotecas constituidas en enero aumenta un 9,6% en tasa interanual y alcanza los 124.190 euros

El importe medio de las hipotecas constituidas en enero aumenta un 9,6% en tasa interanual y alcanza los 124.190 euros 27 de abril de 2005 Estadística de hipotecas (constituciones). Base 2003 Enero 2005. Datos provisionales El importe medio de las hipotecas constituidas en enero aumenta un 9,6% en tasa interanual y alcanza

Más detalles

Pensiones de la Seguridad Social. Septiembre 2018

Pensiones de la Seguridad Social. Septiembre 2018 Pensiones de la Seguridad Social Septiembre 2018 Índice Pág. 3-8 Pensiones a 1 septiembre Pág. 9-14 Evolución Pág. 15-20 Datos CCAA y provincias Pág. 3-8 Pensiones a 1 de septiembre Número 9.646.404 1

Más detalles

Pensiones de la Seguridad Social. Junio 2018

Pensiones de la Seguridad Social. Junio 2018 Pensiones de la Seguridad Social Junio 2018 Índice Pág. 3 8 Pensiones a 1 junio Pág. 9 14 Evolución Pág. 15 20 Datos CCAA y provincias 2 Pág. 3 8 Pensiones a 1 de junio Número 9.613.641 3 1 junio 2018

Más detalles

SISTEMA PENINSULAR Intercambios internacionales

SISTEMA PENINSULAR Intercambios internacionales SISTEMA PENINSULAR Intercambios internacionales 8 Gráficos y cuadros 76 Evolución de las importaciones en los intercambios internacionales físicos 76 Evolución de las exportaciones en los intercambios

Más detalles

Pensiones de la Seguridad Social. Agosto 2018

Pensiones de la Seguridad Social. Agosto 2018 Pensiones de la Seguridad Social Agosto 2018 Índice Pág. 3 8 Pensiones a 1 agosto Pág. 9 14 Evolución Pág. 15 20 Datos CCAA y provincias Pág. 3 8 Pensiones a 1 de agosto Número 9.638.029 1 agosto 2018

Más detalles

Precio medio de la vivienda en Venta en España ABRIL 2013

Precio medio de la vivienda en Venta en España ABRIL 2013 Precio medio de la vivienda en Venta en España ABRIL TABLA 1.- Comunidades Autónomas (CC. AA.) Precio medio de la vivienda en venta ( /m 2 ) y variaciones mensual, trimestral e interanual (%) TABLA 2.-

Más detalles

Régimen ordinario. sistema peninsular

Régimen ordinario. sistema peninsular 03 Régimen ordinario sistema peninsular Gráficos y cuadros /// Sistema eléctrico español 2011 35 36 37 38 39 40 41 42 43 Variaciones de potencia en el equipo generador Producción hidroeléctrica por cuencas

Más detalles

El importe medio de las hipotecas constituidas en febrero aumenta un 11,2% en tasa interanual y alcanza los 135.711 euros

El importe medio de las hipotecas constituidas en febrero aumenta un 11,2% en tasa interanual y alcanza los 135.711 euros 27 de mayo de 2005 Estadística de hipotecas (constituciones). Base 2003 Febrero 2005. Datos provisionales El importe medio de las hipotecas constituidas en febrero aumenta un 11,2% en tasa interanual y

Más detalles

ÍNDICE. 2. Tasa de natalidad, tasa de mortalidad y crecimiento natural en 2010 por comunidades autónomas.

ÍNDICE. 2. Tasa de natalidad, tasa de mortalidad y crecimiento natural en 2010 por comunidades autónomas. ÍNDICE POBLACIÓN 1. Superficie (en km 2 ), población total y densidad de población en 2011 por comunidades autónomas. 2. Tasa de natalidad, tasa de mortalidad y crecimiento natural en 2010 por comunidades

Más detalles

Todas las viviendas analizadas para este informe han sido publicadas en enalquiler.com tanto por particulares como por agencias inmobiliarias.

Todas las viviendas analizadas para este informe han sido publicadas en enalquiler.com tanto por particulares como por agencias inmobiliarias. Informe del precio medio del alquiler de viviendas en España Noviembre 2014 Índice Noviembre 2014 - Evolución del Precio Medio del Alquiler de viviendas en España - Información por Comunidades Autónomas

Más detalles

Pensiones de la Seguridad Social. Noviembre 2018

Pensiones de la Seguridad Social. Noviembre 2018 Pensiones de la Seguridad Social Noviembre 2018 Índice Pág. 3-8 Pensiones a 1 noviembre Pág. 9-14 Evolución Pág. 15-20 Datos CCAA y provincias Pág. 3-8 Pensiones a 1 de noviembre Número 9.675.138 1 noviembre

Más detalles

INSCRIPCIONES VOLUNTARIOS. Registro Oficial de Licitadores y Empresas Clasificadas del Estado DESDE OTROS REGISTROS

INSCRIPCIONES VOLUNTARIOS. Registro Oficial de Licitadores y Empresas Clasificadas del Estado DESDE OTROS REGISTROS Dirección General de Patrimonio del Estado Registro Oficial de Licitadores y Empresas Clasificadas del Estado INSCRIPCIONES DESDE OTROS REGISTROS VOLUNTARIOS Madrid, junio 2010 El objetivo de este documento

Más detalles

Pensiones de la Seguridad Social. Agosto 2017

Pensiones de la Seguridad Social. Agosto 2017 Pensiones de la Seguridad Social Agosto 2017 Índice Pág. 3 8 Pensiones a 1 agosto Pág. 9 13 Evolución Pág. 14 19 Datos CCAA y provincias 2 Pág. 3 8 Pensiones a 1 agosto Numero 9.532.495 3 Agosto 2017 Número

Más detalles

Pensiones de la Seguridad Social. Noviembre 2017

Pensiones de la Seguridad Social. Noviembre 2017 Pensiones de la Seguridad Social Noviembre 2017 Índice Pág. 3 8 Pensiones a 1 noviembre Pág. 9 13 Evolución Pág. 14 19 Datos CCAA y provincias Pág. 3 8 Pensiones a 1 noviembre Numero 9.567.387 3 Noviembre

Más detalles

Pensiones de la Seguridad Social. Julio 2017

Pensiones de la Seguridad Social. Julio 2017 Pensiones de la Seguridad Social Julio 2017 Índice Pág. 3 8 Pensiones a 1 julio Pág. 9 13 Evolución Pág. 14 19 Datos CCAA y provincias 2 Pág. 3 8 Pensiones a 1 julio Numero 9.521.991 3 Julio 2017 Número

Más detalles

Pensiones de la Seguridad Social. Mayo 2017

Pensiones de la Seguridad Social. Mayo 2017 Pensiones de la Seguridad Social Mayo 2017 Índice Pág. 3 8 Pensiones a 1 mayo Pág. 9 13 Evolución Pág. 14 19 Datos CCAA y provincias Pág. 3 8 Pensiones a 1 mayo 9.485.660 Mayo 2017 Número de pensiones

Más detalles

Todas las viviendas analizadas para este informe han sido publicadas en enalquiler.com tanto por particulares como por agencias inmobiliarias.

Todas las viviendas analizadas para este informe han sido publicadas en enalquiler.com tanto por particulares como por agencias inmobiliarias. Informe del precio medio del alquiler de viviendas en España Enero 2016 Índice Enero 2016 - Evolución del Precio Medio del Alquiler de viviendas en España - Información por Comunidades Autónomas - Información

Más detalles

MINISTERIO DE HACIENDA Y SUBSECRETARÍA ADMINISTRACIONES PÚBLICAS DEPARTAMENTO DE SERVICIOS Y COORDINACIÓN OFICIALÍA MAYOR

MINISTERIO DE HACIENDA Y SUBSECRETARÍA ADMINISTRACIONES PÚBLICAS DEPARTAMENTO DE SERVICIOS Y COORDINACIÓN OFICIALÍA MAYOR Provincia Localidad Órgano Registro general al que se addscribe Dirección Código Postal Horario Teléfono A Coruña A Coruña Gerencia Regional del Catastro A Coruña A Coruña Delegación Especial en Galicia

Más detalles

MINISTERIO DE HACIENDA Y SUBSECRETARÍA ADMINISTRACIONES PÚBLICAS DEPARTAMENTO DE SERVICIOS Y COORDINACIÓN OFICIALÍA MAYOR

MINISTERIO DE HACIENDA Y SUBSECRETARÍA ADMINISTRACIONES PÚBLICAS DEPARTAMENTO DE SERVICIOS Y COORDINACIÓN OFICIALÍA MAYOR REGISTROS DE LAS DELEGACIONES DEL GOBIERNO, SUBDELEGACIONES DEL GOBIERNO Y SERVICIOS INTEGRADOS Provincia Localidad Órgano Tipo de Registro Dirección postal Código postal Horario A Coruña A Coruña Delegación

Más detalles

Country fact sheet. Noise in Europe overview of policy-related data. Spain

Country fact sheet. Noise in Europe overview of policy-related data. Spain Country fact sheet Noise in Europe 2015 overview of policy-related data Spain April 2016 The Environmental Noise Directive (END) requires EU Member States to assess exposure to noise from key transport

Más detalles

Miscelánea geográfica y regional REGIONES DE ESPAÑA

Miscelánea geográfica y regional REGIONES DE ESPAÑA Miscelánea geográfica y regional REGIONES DE ESPAÑA Comunidades Autónomas Francia Asturias Cantabria Euskadi Navarra Andorra Porto Galicia Castilla-León La Rioja Aragón Cataluña Portugal Lisboa Extremadura

Más detalles

VIVIENDAS ADSCRITAS AL FONDO SOCIAL POR COMUNIDAD AUTONOMA, PROVINCIA Y LOCALIDAD

VIVIENDAS ADSCRITAS AL FONDO SOCIAL POR COMUNIDAD AUTONOMA, PROVINCIA Y LOCALIDAD VIVIENDAS ADSCRITAS AL FONDO SOCIAL POR COMUNIDAD AUTONOMA, PROVINCIA Y LOCALIDAD ANDALUCÍA ALMERÍA Localidad EL EJIDO 4700 73,81 ROQUETAS DE MAR 4740 55 ROQUETAS DE MAR 4740 99,65 ROQUETAS DE MAR 4740

Más detalles

Colección Estudios Económicos. Anuario Económico: Selección de indicadores

Colección Estudios Económicos. Anuario Económico: Selección de indicadores Colección Estudios Económicos 2005 Anuario Económico: Selección de indicadores ÍNDICE 1. EQUIPAMIENTO MEDIO DE LOS MUNICIPIOS... 2 2. VARIACIÓN DE LA... 3 3. TASA DE PARO ( PARO REGISTRADO SOBRE TOTAL

Más detalles

Flexibilidad ante lo NO-Convencional El caso de éxito de España

Flexibilidad ante lo NO-Convencional El caso de éxito de España Flexibilidad ante lo NO-Convencional El caso de éxito de España Andrés Seco. Barcelona. Julio 2015 La leyenda de Toggún & Osochi Knowledge Sharing 2 3 THE POWER OF INTERCONNECTING: Flexibility Integrated

Más detalles

Santa Cruz de Tenerife Santa Cruz de Tenerife

Santa Cruz de Tenerife Santa Cruz de Tenerife POBLACION REFERIDA AL 01/01/2006 POR CAPITALES POR PROVINCIAS DE PROVINCIA ORDEN Provincias Población Capitales Población Total nacional 44.708.964 Total nacional 14.695.472 1 Álava 301.926 Vitoria-Gasteiz

Más detalles

Boletín Hidrológico Semanal

Boletín Hidrológico Semanal Boletín Hidrológico Semanal Información pluviométrica desde el 05 de marzo de 2018 hasta el 12 de marzo de 2018 Los datos de pluviometría son provisionales y facilitados por la Agencia Estatal de Meteorología.

Más detalles

PRESS CLIPPING 27 May 2015 www.mecasolar.com

PRESS CLIPPING 27 May 2015 www.mecasolar.com PRESS CLIPPING 27 May 2015 www.mecasolar.com MECASOLAR supplies 1MW in 2-Axis trackers to solar PV plant in Romania Mecasolar has supplied 97 dual axis solar trackers in Romania. The 1MW installation,

Más detalles