Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROCUREMENT PLAN PERU INTEGRATED WATER RESOURCES MANAGEMENT IN TEN BASINS PROJECT P151851 I. General 1. Bank s approval Date of the procurement Plan: Original, February 23, 2017 2. Date of General Procurement Notice: February 23, 2017 3. Period covered by this procurement plan: all the procurement process planned II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 2 million All 2. NCB (Goods) Below US$ 2 million None 3. ICB (Works) Above US$ 10 million All 4. NCB (Works) Below US$ 10 million None 2. Project Operational/Procurement Manual: Procurement implementation details activities will be outlined in the Project Operational Manual (POM) 3. Any Other Special Procurement Arrangements: None 4. Summary of the Procurement Packages planned during the first 18 months after project effectiveness 1 2 3 4 5 6 Description Estimated Package Domestic Review Comments Cost US$ million s Preferenc e (yes/no) by Bank (Prior / Post) Summary of the ICB (Goods) 25.2 5 No Prior Summary of the NCB (Works) 9.28 5 No Post Summary of the NCB (Goods) 3.16 4 No Post III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 350,000 All 2. Single Source (Firms) All 3. Individual Key personnel All 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$ 350,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.
3. Any Other Special Selection Arrangements: None 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 Description of Assignment Estimated Packages Review Comments Cost US$ million by Bank (Prior / Post) Summary of number of 15.95 10 Prior contracts that will be let under QCBS > US$ 350 mil Summary of number of contracts that will be let under QCBS < US$ 350 mil 1.20 5 Post
Page 1 PROCUREMENT Peru : Integrated Water Resources Management in Ten Basins PLAN General Information Country: Peru Bank s Approval Date of the Original Procurement Plan: 2018-03-16 Revised Plan Date(s): (comma delineated, leave blank if non 2018-10-12 Project ID: P151851 GPN Date: Project Name: Integrated Water Resources Management in Ten Basins Loan / Credit No: Executing Agency(ies):National Water Authority of the Ministry of Agriculture - Autoridad Nacional del Agua (ANA) WORKS Activity Reference No. / Description Loan / Credit No. Component Review Type Method Market Approach Procurement Prequalification Actual Amount (Y/N) (US$) Status Draft Pre-qualification Documents Prequalification Evaluation Report Draft Bidding Document / Justification Specific Procurement Notice / Invitation Bidding Documents as Issued Proposal Submission / Opening / Minutes Bid Evaluation Report and Recommendation for Award Signed Contract Contract Completion Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LPN 003 2018 ANA PGIRH BM / PERFORACIÓN E INSTALACIÓN DE 58 PIEZÓMETROS EN LOS 0.00 En ejecución 2018-07-26 2018-07-29 2018-08-28 2018-09-07 2018-09-26 2019-01-23 ACUÍFEROS DE ICA Y TACNA: LOTE 01 ICA Y LOTE 02 TACNA LPN 007-2018-ANA-PGIRH- BM / PERFORACION E INSTALACION DE 58 PIEZOMETROS EN LOS ACUIFEROS DE ICA Y TACNA lote 1 ICA 28 perfotaciones metodo 2018-10-04 2018-10-07 2018-11-06 2018-11-16 2018-12-05 2019-04-03 diamantina, lote 2 TACNA 8 perforaciones metodo diamantina, lote 3 TACNA 22 perforaciones metodo RC LPN 008 2018 ANA PGIRH / Contratación para la Construcción - Obras Civiles para la Implementación de la Infraestructura del Centro de Datos, Laboratorio de 2018-10-19 2018-10-21 2018-11-20 2018-11-25 2018-12-12 2019-06-10 Instrumentación, Centro de Monitoreo Y Modelamiento de Recursos Hídricos de la Autoridad Nacional del Agua CP 001 2018 ANA PGIRH BM / OBRAS PRELIMINARES Y DE CIERRE PARA LA EJECUCIÒN DE PERFORACIÒN E 2018-10-21 2018-11-15 2018-12-30 INSTALACION DE 28 PIEZOMETROS EN LOS ACUIFEROS DE ICA CP 002 2018 ANA PGIRH BM / OBRAS PRELIMINARES Y DE CIERRE PARA LA EJECUCION DE PERFORACION E 2018-10-21 2018-11-15 2018-12-30 INSTALACION DE 30 PIEZOMETROS EN LOS ACUIFEROS DE TACNA
Page 2 CP 003 2018 ANA PGIRH BM / CONSTRUCCION DE CASETAS DE PROTECCION DE 30 PIEZOMETROS EN 2018-12-23 2019-01-17 2019-03-03 LOS ACUIFEROS DE TACNA GOODS Activity Reference No. / Description Loan / Credit No. Component Review Type Method Market Approach Procurement Prequalification Actual Amount (Y/N) (US$) Status Draft Pre-qualification Documents Prequalification Evaluation Report Draft Bidding Document / Justification Specific Procurement Notice / Invitation Bidding Documents as Issued Proposal Submission / Opening / Minutes Bid Evaluation Report and Recommendation for Award Signed Contract Contract Completion Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LPI 002 ANA PGIRH / SUMINISTRO INSTALACION PUESTA EN FUNCIONAMIENTO Y CAPACITACION DE 110 2018-07-31 2018-08-14 2018-10-15 2018-10-31 2018-11-15 2020-05-16 SISTEMA MECANIZADOS DE AFOROS LPI 003 2018 ANA PGIRH / SUMINISTRO, FUNCIONAMIENTO Y CAPACITACIÓN DEL EQUIPAMIENTO PARA EL 2018-07-06 2018-07-11 2018-09-13 2018-09-23 2018-10-25 2019-01-03 SISTEMA DE SEGURIDAD Y RESPALDO DE LA INFORMACIÓN LPI 004 2018 ANA PGIRH / SUMINISTRO, FUNCIONAMIENTO Y CAPACITACIÓN DE LOS SUBSISTEMAS PARA EL 0.00 Cancelado 2018-07-09 2018-07-14 2018-09-16 2018-09-26 2018-10-28 2019-01-11 SISTEMA DE SEGURIDAD Y RESPALDO DE LA INFORMACIÓN LPN 001 2018 ANA PGIRH / SUMINISTRO, INSTALACIÓN PUESTA EN FUNCIONAMIENTO Y CAPACITACIÓN DE EQUIPAMIENTO PARA LA PLATAFORMA TECNOLÓGICA PARA LA ADQUISICIÓN, 0.00 En ejecución 2018-07-09 2018-07-14 2018-09-16 2018-09-26 2022-08-25 2022-10-24 DECODIFICACIÓN, INTEGRACIÓN Y DISTRIBUCIÓN DE DATOS DE LAS ESTACIONES AUTOMATICAS CON TELEMETRIA LPI 001 ANA PGIRH / SUMINISTRO, FUNCIONAMIENTO Y CAPACITACIÓN DE 153 2018-06-20 2018-06-29 2018-08-31 2018-09-21 2018-11-15 2019-11-15 ESTACIONES HIDROLÓGICAS CON 33 EHCA
Page 3 LPN 005 2018 ANA PGIRH BM / SUMINISTRO, INSTALACIÓN, PUESTA EN FUNCIONAMIENTO Y CAPACITACIÓN DE LOS SUBSISTEMAS PARA EL 2018-07-19 2018-07-20 2018-08-20 2018-08-31 2018-09-20 2018-11-19 SISTEMA DE SEGURIDAD Y RESPALDO DE LA INFORMACIÓN LPN 002 2018 ANA PGIRH BM / ADQUISICIÓN DE CATORCE (14) VEHÍCULOS PARA LA SUPERVISIÓN, SEDE 0.00 En ejecución 2018-07-26 2018-07-31 2018-08-31 2018-09-05 2018-09-20 2018-10-20 CENTRAL Y ADMINISTRACIÓN DE LAS CUENCAS DEL PGIRH LPN 004 2018 ANA PGIRH BM / SUMINISTRO, FUNCIONAMIENTO Y CAPACITACIÓN DE 141 SENSORES CON SISTEMA 2018-07-31 2018-08-06 2018-09-05 2018-09-17 2018-10-04 2019-01-02 DE TELEMETRÍA PARA PIEZÓMETROS EN ICA Y TACNA LPI 005 2018 ANA PGIRH BM / SUMINISTRO, FUNCIONAMIENTO Y CAPACITACIÓN DE 0.00 En ejecución 2018-07-26 2018-07-31 2018-09-14 2018-09-19 2018-10-04 2018-12-28 INSTRUMENTACIÓN DE PRESAS LPI 006 2018 ANA PGIRH BM / ADQUISICIÓN, INSTALACIÓN, CAPACITACIÓN Y PUESTA EN MARCHA DE EQUIPOS DE MEDICIÓN DE AGUA Y TRANSMISIÓN DE 0.00 En ejecución 2018-09-10 2018-09-15 2018-10-15 2018-10-25 2018-11-19 2020-08-10 DATOS EN LAS CAPTACIONES Y BLOQUES DE RIEGO SELECCIONADOS EN LA COSTA DEL PERU LPN 006 2018 ANA PGIRH BM / SUMINISTRO, FUNCIONAMIENTO Y CAPACITACIÓN DE 2018-09-13 2018-09-18 2018-10-18 2018-10-21 2018-11-13 2019-02-11 INSTRUMENTACIÓN DE PIEZOMETROS LPN 009 2018 ANA PGIRH / ADQUISICION E INSTALACION DE EQUIPOS DE TELEMETRIA PARA ESTRUCTURAS DE MEDICION DE AGUA CON SENSORES PARA LAS 2018-10-17 2018-10-21 2018-11-20 2018-11-25 2018-12-13 2019-01-12 ADMINISTRACIONES DE LOCAL DE AGUA DE TUMBES, PIURA, LAMBAYEQUE, AREQUIPA
Page 4 CP 010 2018 ANA PGIRH BM / ADQUISICION DE EQUIPOS INFORMATICOS Y ACCESORIOS PERIFERICOS PARA LAS 2018-10-21 2018-11-06 2018-12-21 COORDINACIONES TECNICAS DE CUENCA CP 011 2018 ANA PGIRH BM / ADQUISICION DE LAP TOP PARA LA SEDE 2018-10-21 2018-11-06 2018-12-21 CENTRAL NON CONSULTING SERVICES Activity Reference No. / Description Loan / Credit No. Component Review Type Method Market Approach Procurement Prequalification Actual Amount (Y/N) (US$) Status Draft Pre-qualification Documents Prequalification Evaluation Report Draft Bidding Document / Justification Specific Procurement Notice / Invitation Bidding Documents as Issued Proposal Submission / Opening / Minutes Bid Evaluation Report and Recommendation for Award Signed Contract Contract Completion Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CP 004 2018 ANA PGIRH BM / SERVICIO DE NIVELACION Y 2018-12-23 2019-01-17 2019-03-03 MONUMENTACION ICA CP 005 2018 ANA PGIRH BM / SERVICIO DE NIVELACION Y 2018-12-22 2019-01-16 2019-03-02 MONUMENTACION TACNA CP 006 2018 ANA PGIRH BM / SERVICIO DE NIVELACION Y MONUMENTACION ICA (POZOS RED CONTROL 2018-10-21 2018-11-15 2018-12-30 GLOBAL ALA, AAA, DCERH) CP 007 2018 ANA PGIRH BM / SERVICIO DE NIVELACION Y MONUMENTACION TACNA (POZOS RED CONTROL 2018-10-21 2018-11-15 2018-12-30 GLOBAL ALA, AAA, DCERH) CP 008 2018 ANA PGIRH BM / ADQUISICION DE DOS CAUDALIMETROS 2018-10-21 2018-11-06 2018-12-21 ULTRASONICOS CP 009 2018 ANA PGIRH BM / ADQUISICION DE UNA CAMARA DE 2018-10-21 2018-11-06 2018-12-21 INSPECCION DE POZOS CP 012 2018 ANA PGIRH BM / CONTRATACION DE AGENCIA PARA PUBLICACION DE AVISOS 2018-10-24 2018-11-07 2018-12-31 EN DIARIOS
Page 5 CP 014 2018 ANA PGIRH DE ALGARROBO - VALLE 2018-10-28 2018-11-20 2018-12-14 HERMOSO - HUALTACO I - II - IV - SOMATE ALTO - SOMATE BAJO - VALLE LOS INCAS - CHIPILLICO BAJO -M - MALINGAS CP 015 2018 ANA PGIRH 2018-10-28 2018-11-20 2018-12-13 DE QUIROZ PAMPAS-SAN ISIDRO I-II-TEJEDORES-TG- MALINGAS-YUSCAY- TABLAZO ALTO CP 016 2018 ANA PGIRH 2018-11-02 2018-11-25 2018-12-07 DE PRAXADES-SANTA MARCELA CP 017 2018 ANA PGIRH 2018-11-02 2018-11-25 2018-12-18 CASCAJAL-ANITAS-ILLIMO CP 018 2018 ANA PGIRH 2018-10-28 2018-11-20 2018-12-10 MARGEN DERECHA CP 019 2018 ANA PGIRH 2018-10-28 2018-11-20 2018-12-08 MIGUEL CHECA CP 020 2018 ANA PGIRH 2018-10-28 2018-11-20 2018-12-10 CASARANA CP 021 2018 ANA PGIRH 2018-10-28 2018-11-20 2018-12-03 SAN ANDRES
Page 6 CP 022 2018 ANA PGIRH 2018-11-02 2018-11-25 2018-12-28 DE CAPOTE-LA RAMADA- CHONGOYAOPE-PITIPO CP 023 2018 ANA PGIRH 2018-11-02 2018-11-25 2018-12-18 DE PUCALA TUMAN- POMALCA CP 024 2018 ANA PGIRH 2018-11-02 2018-11-25 2018-12-10 LAMBAYEQUE CP 025 2018 ANA PGIRH 2018-11-02 2018-11-25 2018-12-19 TALAMBO CP 013 2018 ANA PGIRH 2018-10-28 2018-11-20 2018-12-20 RIEGO DEL VALLE CP 026 2018 ANA PGIRH 2018-11-02 2018-11-25 2018-12-28 SAN PEDRO CP 027 2018 ANA PGIRH 2018-11-02 2018-11-25 2018-12-19 SAN JOSÉ CP 028 2018 ANA PGIRH 2018-11-02 2018-11-25 2018-12-07 SAN MIGUEL CP 029 2018 ANA PGIRH 2018-11-02 2018-11-25 2018-12-10 SAYAN
Page 7 CP 030 2018 ANA PGIRH 2018-11-02 2018-11-25 2018-12-18 LLAMACHUPAN CP 031 2018 ANA PGIRH 2018-11-02 2018-11-25 2018-12-15 HUARICANGA CP 032 2018 ANA PGIRH 2018-11-02 2018-11-25 2018-12-13 NARANJAL CP 033 2018 ANA PGIRH 2018-11-02 2018-12-05 2018-12-28 DE MACASH-POCOS CP 034 2018 ANA PGIRH 2018-11-02 2018-11-25 2018-12-04 RINCONADA CP 035 2018 ANA PGIRH 2018-11-02 2018-11-25 2018-12-08 DE LATERAL 4, 5 Y 6 CP 036 2018 ANA PGIRH 2018-11-02 2018-11-25 2018-12-19 EL CHOLOQUE CP 037 2018 ANA PGIRH 2018-11-02 2018-11-25 2018-12-08 DE MORO-VICHANZAO CP 038 2018 ANA PGIRH 2018-10-28 2018-11-20 2018-12-08 DE MALA MUERTE- CHICAMITA
Page 8 CONSULTING FIRMS Activity Reference No. / Description Loan / Credit No. Component Review Type Method Market Approach Contract Type Actual Amount (US$) Status Terms of Reference Expression of Interest Short List and Draft Request for Proposals Opening of Technical Notice Request for Proposals as Issued Proposals / Minutes Evaluation of Technical Proposal Combined Evaluation Report and Draft Negotiated Contract Signed Contract Contract Completion Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SBCC 002 ANA MGRH / CONSULTORIA PARA LA ELABORACIÓN DE UN PAQUETE DE EXPEDIENTES TECNICOS PARA CONSTRUCCION DE 200 ESTRUCTURAS DE CONTROL Y MEDICION DE AGUA EN BLOQUES DE RIEGO EN DIECIOCHO SECTORES HIDRAULICO DE LA ZONA CENTRO DE LA COSTA DEL PERU Selección basada en calidad y costo 0.00 En ejecución 2018-06-01 2018-06-08 2018-06-23 2018-07-08 2018-07-11 2018-07-13 2018-07-31 2018-10-14 SBCC 003 2018 ANA PGIRH / CONSULTORÍA PARA LA ELABORACIÓN DE UN PAQUETE DE EXPEDIENTES TÉCNICOS PARA CONSTRUCCIÓN DE 274 ESTRUCTURAS DE MEDICIÓN DE AGUA EN BLOQUES DE RIEGO EN DOCE (12) SECTORES HIDRÁULICOS DE LA ZONA NORTE DE LA COSTA DEL PERÚ Selección basada en calidad y costo 0.00 Bajo Revision 2018-06-15 2018-06-20 2018-07-23 2018-08-07 2018-08-16 2018-10-29 2018-11-16 2019-02-14 SBCC 001 ANA PGIRH / FORMULACIÓN DE LOS PLANES DE GESTIÓN DE RECURSOS HDRICOS EN Selección basada en calidad y costo 0.00 Cancelado 2018-06-01 2018-06-06 2018-07-11 2018-10-08 2018-10-19 2018-10-26 2018-11-27 2020-11-26 CUATRO CUENCAS SBCC 004 2018 ANA PGIRH / CONSULTORIA PARA LA ELABORACIÓN DE UN PAQUETE DE EXPEDIENTES TÉCNICOS PARA CONSTRUCCIÓN DE 337 ESTRUCTURAS DE MEDICIÓN DE AGUA EN BLOQUES DE RIEGO EN TREINTA (30) SECTORES HIDRÁULICOS DE LA ZONA SUR DE LA COSTA DEL PERÚ Selección basada en calidad y costo 0.00 En ejecución 2018-07-05 2018-07-11 2018-08-15 2018-09-12 2018-09-19 2018-09-27 2018-10-05 2019-01-03 SBC 001 2018 ANA PGIRH BM / ESTUDIO DE LÍNEA BASE DEL PIP 302961 GESTIÓN INTEGRADA DE Selección basada en calidad 0.00 En ejecución 2018-07-23 2018-07-25 2018-08-12 2018-09-11 2018-09-14 2018-09-17 2018-09-28 2018-12-27 LOS RECURSOS HÍDRICOS EN DIEZ CUENCAS SBCC 005 2018 ANA PGIRH BM / FORMULACIÓN DE LOS PLANES DE GESTIÓN DE RECURSOS HÍ DRICOS EN DOS CUENCAS PILOTO DE Selección basada en calidad y costo 0.00 En ejecución 2018-08-22 2018-09-06 2018-09-16 2018-10-16 2018-10-21 2018-10-24 2018-11-13 2020-11-02 LA VERTIENTE DEL ATLÁNTICO: MAYO Y MANTARO
Page 9 SBCC 006 2018 ANA PGIRH BM / FORMULACIÓN DE LOS PLANES DE GESTIÓN DE RECURSOS HIDRICOS EN DOS CUENCAS PILOTO DE Selección basada en calidad y costo 0.00 En ejecución 2018-08-22 2018-09-06 2018-09-16 2018-10-16 2018-10-21 2018-10-24 2018-11-13 2020-05-06 LA VERTIENTE DEL ATLÁNTICO: PAMPAS- APURIMAC Y URUBAMBA- VILCANOTA SBCC 007 2018 ANA PGIRH BM / SUPERVISIÓN DE LA PERFORACIÓN E INSTALACIÓN DE 58 PIEZOMETROS EN LOS Selección basada en calidad y costo 0.00 En ejecución 2018-09-07 2018-09-08 2018-09-25 2018-10-23 2018-10-26 2018-10-30 2018-11-15 2019-03-14 ACUIFEROS DE ICA Y TACNA: LOTE 01 ICA Y LOTE 02 TACNA INDIVIDUAL CONSULTANTS