INSTALLATION INSTRUCTION SHEET. Transmission Oil Cooler Installation Instructions. INSTRUCTION SHEET Installation Instructions Transmission Oil Cooler

Documentos relacionados
GMT900 Pick-Up Instrument Panel DIC Switch

Heavy Duty Production Bench Optional Light Fixture

GMC Yukon / Yukon XL Grille Inserts

Bead Lock Capable Wheel

π S ASSEMBLY INSTRUCTIONS uline.com COMPONENTS S GALLON F-STYLE JUG SHIPPER

INSTALLATION INSTRUCTIONS ECLIPSE FUEL DOOR PART # MZ313512

Under Seat Storage FIGURE 3 COMPLETE CREW CAB ASSEMBLY FIGURE 4 COMPLETE EXTENDED CAB ASSEMBLY FIGURE 1 INSTALLATION PROCEDURE FIGURE 5 FIGURE 2

QUICK ADJUST WIRE SHELVING

Blair Storage Bed / Lit avec Rangement / Cama con Almacenamiento - Queen, King

Installation Guide B. Showerheads

ProMaster B-Pillar Grab Handle

600w Radiator Fan. Accessory Kit Part Numbers:

K CONTENTS (4) Slimline Weathershield (1) Instruction sheet (4) Alcohol wipe

H-3900 PRODUCE BAG STAND STANDARD

GMT610 Assist Step Kit Installation Instructions PASSENGER VAN

Camaro Grille Replacement - Front Upper

2.4L ENGINE BLOCK HEATER CHRYSLER 200 / DODGE AVENGER CALL OUT DESCRIPTION QUANTITY 1 Engine Block Heater 1 2 Cord 1 3 Tie Straps 2

π S ASSEMBLY INSTRUCTIONS uline.com

AT07. Board for Arduino UNO with terminal block placa para Arduino UNO con bornes Plaque pour ARDUINO UNO avec borniers pour CI

Installation Guide BD. Sink Strainer

Installation Guide F. Shower Arms

π S QUART PAINT CAN SHIPPER ASSEMBLY INSTRUCTIONS uline.com COMPONENTS

Thank you for purchasing the General Motors Cargo Shade for your vehicle. Your package should contain one Cargo Shade and this instruction sheet.

BOHANDL30 Handle Installation Instructions

1 INSTALLATION INSTRUCTIONS Fullsize Utility Chrome Oval Tubular Assist Steps. Fullsize Utility Chrome Oval Tubular Assist Steps FIGURE 1 DETAIL B

2 2. Support RH side of fuel tank with jack stand. TO FRONT OF VEHICLE 3. Remove (1) and (3) support bolts from around fuel tank.

TL003 ITEM: DESCRIPTION:

PORTABLE BENCH WITH BACK

π S GALLON PAINT CAN SHIPPER ASSEMBLY INSTRUCTIONS uline.com COMPONENTS

INSTALLATION GUIDE BACKSPLASH TABLE OF CONTENTS. List of Materials...1 Installation...2-3

M2.6 screws ( for mounting the bracket )

INSTRUCTIONS INSTRUCCIONES CONSIGNES

Fullsize Truck Round Tubular Assist Steps Read entire instructions thoroughly before starting.

π S GALLON PLASTIC PAIL SHIPPER ASSEMBLY INSTRUCTIONS uline.com COMPONENTS

π H-4039 SPILL CONTAINMENT WORKSTATION CONNECTORS ASSEMBLY uline.com TOOL NEEDED

Para Español, vea páginas 4-6. Pour le français, consulter les pages 7-9. π H uline.com SANITAIRE BACKPACK VACUUM MOTOR AND BASE

DODGE RAM SRT 10 Hood and Scoop Bezel

Industrial Pedestal Fan

π S-7335, S QUART PAINT CAN FOAM SHIPPER KIT ASSEMBLY INSTRUCTIONS uline.com COMPONENTS

DODGE RAM of 8 K

HPFD12XCP, HPFD12XHP

Deluxe Industrial Pedestal Fan

π S QUART PAINT CAN SHIPPER ASSEMBLY INSTRUCTIONS uline.com COMPONENTS

π S ASSEMBLY INSTRUCTIONS uline.com COMPONENTS S GALLON F-STYLE JUG SHIPPER

Continental Bed Rails Assembly Instructions. Instructions d'assemblage pour traverses de lit Continental

OWNER S GUIDE REGISTER YOUR GRILL CHARCOAL GRILL

Double Door Enclosed Corkboard

Front Brake Ducts Install Instructions

π S GALLON STEEL PAIL SHIPPER ASSEMBLY INSTRUCTIONS uline.com COMPONENTS

F-SERIES STYLESIDE 2004 LINCOLN MARK LT 2005

Installation Instructions I- Sheet Number THX04

elements enviro Owner s Manual Manuel du propriétaire Manual del usuario ecofriendly solutions organizing

Rear Compartment Floor Stowage Compartment Package Installation

INSTRUCTIONS INSTRUCCIONES CONSIGNES

DELUXE SHOP DESKS PARTS uline.com TOOLS NEEDED H-6865, H-6866, H-6867 H-6868, H-6870

P/N INSTALLING HD3000 SERIES HANDLE SET : INSTALL LATCH / DEADBOLT STRIKERS:

Assembly instructions Instructions d assemblage Instrucciones de Ensamblaje /18

π S ASSEMBLY INSTRUCTIONS uline.com COMPONENTS S GALLON INDUSTRIAL JUG SHIPPER

CASTER INSTALLATION HARDWARE INCLUDED:

π H-6697 SHOWER EYEWASH STATION ASSEMBLY uline.com 1. Connect eyewash basin connection pipes (2) to base support unit (1).

DODGE RAM Front and Rear Wheel Flares

Service Kit Instructions

L/LV9000-Series OR O OU Q A

Chrome Fuel Door FIGURE 1A FIGURE 2A. Chrome Fuel Door REV 15AP08. INSTALLATION INSTRUCTIONS Fuel Door

Installation Guide B. Drains

2011 Honda CR-Z

Assembly instructions Instructions d assemblage Instrucciones de Ensamblaje /14

MODEL: F / MODELO: F END TABLE WITH MEDIA STAND & MAGAZINE HOLDER MESA RINCONERA CON ESTANTE & REVISTERO

METAL FACEPLATES FOR 2, 4, AND 6 GANG FLOOR BOXES

T87 Range Stops INSTALLATION APPLICATION INSTALLATION INSTRUCTIONS EFS

Assembly Instructions Instrucciones de Armado Instructions d'ssemblage

TOOLS REQUIRED - OUTILS NÉCESSAIRES - HERRAMIENTAS NECESARIAS

French Kitchen Large Island / Grande Îlot de Cuisine / Gran Isla de la Cocina

JL CHMSL Relocation Kit

Installation Guide C. Countertop

π S ASSEMBLY INSTRUCTIONS uline.com COMPONENTS S GALLON F-STYLE CAN SHIPPER

π H-1200, H-2862 MAIL CART PARTS uline.com TOOLS NEEDED

MOBILE STEEL ASSEMBLY TABLE

Contents Qty Part No. Description 1 P Leaf Guard Kit 1 A Duct, Air 1 E Grid, Blower Screw

Toyota Avalon 2011-up

π S ASSEMBLY INSTRUCTIONS uline.com COMPONENTS S GALLON F-STYLE CAN SHIPPER

Installation Guide. Showerheads

Scion IQ 2012-up

π S x 12 x 12" LITHIUM BATTERY SHIPPER ASSEMBLY INSTRUCTIONS uline.com COMPONENTS

Package Contents. Hardware Package. Tools Needed

π H-7011 GAS CYLINDER LOCKER PARTS uline.com TOOL NEEDED Para Español, vea páginas 4-6. Pour le français, consulter les pages 7-9.

USA/Canada: KOHLER México: kohler.com 2009 Kohler Co.

LISEZ CECI AVANT DE COMMENCER

One Drawer Nightstand Table de chevet de tiroir Mesilla de noche con 1 cajone

π H x 6' DRY ERASE BOARD/PARTITION PARTS uline.com TOOL INCLUDED

π H-4286 RUBBERMAID parts uline.com tools needed 1. Tip convertible utility cart on its side with cart slightly open.

FIRE ACCESS BOX MODEL FBSL3000 FOR SL U & SL U GATE OPERATORS

INSTRUCTION, DUAL STEP INSTALLATION KIT

Clapboard. Not included Non Inclus No Incuido

Mini Clubman Installation

Toyota Highlander 2014-up B

Transcripción:

INSTALLATION Transmission Oil Cooler Installation Instructions FIGURE 1 Kit Contents: Quantity Description 1 Transmission Oil Cooler 1 Pipe 1 Hose 1 Clip 2 Bolts 1 Instruction Sheet Note: Review instructions and contents before beginning. UPPER PIPE ASSEMBLY C B LOWER PIPE ASSEMBLY 1) Remove the upper pipe assembly (Figure 1) from the radiator (Figure 2) and transmission (Figure 3). Remove the upper pipe assembly from the 3 clips in Figure 6. 2) Install auxiliary hose assembly to radiator (Figure 2 & 4). See Figure 5 for quick connect installation procedure. 3) Install pipe assembly (Figure 4) to transmission (Figure 3) use Figure 5 for quick connect installation. 4) Install cooler assembly with 2 bolts in the top. Torque to 9 Nm. (Figure 7) 5) Install pipe assembly to transmission oil cooler. Install auxiliary hose assembly to transmission oil cooler for step 5. Use Figure 5 for quick connect installation. See Figure 8 for placement. 6) Install pipe assembly & auxiliary hose assembly to the provided clip. Install clip to radiator support. (Figure 9) FIGURE 2 UPPER PIPE ASSEMBLY (REMOVE) AUXILIARY HOSE ASSEMBLY (ADD) E D RADIATOR PIPE (OUTLET) 463504 1 22AP98 30JN99 23JN09 Initial release per Revised graphics Revised - Beth Lemke Installation Instructions Transmission Oil Cooler 463504 1

INSTALLATION FIGURE 3 TRANSMISSION UPPER PIPE ASSEMBLY (REMOVE) FIGURE 5 YELLOW IDENTIFICATION BAND PLASTIC CAP RETAINER (CLIP) PIPE ASSEMBLY (ADD) PIPE QUICK CONNECTOR ASSEMBLY "O" RING PIPE (OUTLET) FIGURE 4 CORRECT INSTALLATION PIPE ASSEMBLY AUXILIARY HOSE ASSEMBLY F GAP YELLOW IDENTIFICATION BAND A E D C B PIPE ASSEMBLY (OUTLET) INCORRECT INSTALLATION EOC/TOC Quick Connect Installation Procedure 1. Insert pipe into connector until a "click" is either heard or felt. CAUTION: Do not use plastic cap to insert pipe into connector. 2. Ensure yellow identification band on the pipe end is hidden within quick connector assembly. (This indicates proper joint seating.) 3. Pull back sharply on pipe to assure the pipe is fastened into connector. 4. Snap plastic cap onto quick connector assembly. Do not manually depress retainer (clip) during this operation. Plastic cap has to be fully seated against quick connector hex. 5. Ensure the pipe is not bent in the process. 463504 2 Installation Instructions Transmission Oil Cooler 463504 2

INSTALLATION FIGURE 6 ENGINE BATTERY POSITIVE CABLE PIPE (INLET) PIPE (INLET) PIPE (OUTLET) CLIP ENGINE HARNESS PIPE (OUTLET) CLIP CLIP VIEW D &LM7/LQ4/LR4 SHOWN PIPE (INLET) VIEW D FOR 4.3L ENGINES PIPE (INLET) PIPE (OUTLET) PIPE (OUTLET) CLIP VIEW C VIEW E 463504 3 Installation Instructions Transmission Oil Cooler 463504 3

INSTALLATION FIGURE 7 FIGURE 8 TRANSMISSION OIL COOLER PIPE ASSEMBLY (FROM TRANSMISSION) AUXILIARY HOSE ASSEMBLY (TO RADIATOR) FIGURE 9 AUXILIARY HOSE ASSEMBLY BOLTS (2) PIPE ASSEMBLY CLIP RADIATOR SUPPORT 463504 4 Installation Instructions Transmission Oil Cooler 463504 4

NOTICE D INSTALLATION Français Instructions d installation de radiateur d huile de boîte de vitesses Contenu du nécessaire : Quantité Description FIGURE 1 SUPÉRIEUR 1 Radiateur d huile de boîte de vitesses 1 Conduit 1 Flexible B 1 Attache 2 Boulons 1 Notice d instructions C INFÉRIEUR Remarque : Examiner les instructions et le contenu avant de commencer. D 1) Retirer le conduit supérieur (Figure 1) du radiateur (Figure 2) et de la boîte de vitesses (Figure 3). Retirer le conduit supérieur des 3 attaches de la Figure 6. 2) Installer le flexible auxiliaire sur le radiateur (Figures 2 et 4). Voir Figure 5 pour la procédure d installation du raccord rapide. 3) Installer le conduit (Figure 4) sur la boîte de vitesses (Figure 3) en utilisant Figure 5 pour l installation du raccord rapide. 4) Installer le radiateur d huile avec 2 boulons en haut. Serrer à un couple de 9 N.m. (Figure 7) 5) Installer le conduit sur le radiateur d huile de boîte de vitesses. Installer le flexible auxiliaire sur le radiateur d huile de boîte de vitesses pour l étape 5. Voir Figure 5 pour l installation du raccord rapide. Voir Figure 8 pour la position. 6) Installer le conduit et le flexible auxiliaire sur l attache fournie. Installer l attache sur le support de radiateur. (Figure 9) FIGURE 2 SUPÉRIEUR (À RETIRER) FLEXIBLE AUXILIAIRE (À AJOUTER) E RADIATEUR (SORTIE) PIÈCE N 463504 5 FEUILLE DE 463504 5

NOTICE D INSTALLATION Français FIGURE 3 BOÎTE DE VITESSES SUPÉRIEUR (À RETIRER) FIGURE 5 BOUCHON EN PLASTIQUE RUBAN D IDENTIFICATION JAUNE RETENUE (ATTACHE) (À AJOUTER) RACCORD RAPIDE JOINT TORIQUE (SORTIE) FIGURE 4 ENSEMBLE FLEXIBLE AUXILIAIRE F INSTALLATION CORRECTE JEU RUBAN D IDENTIFICATION JAUNE INSTALLATION INCORRECTE A E D C B ENSEMBLE (SORTIE) Procédure d installation de raccord rapide RHM/RHB 1. Insérer le conduit dans le connecteur jusqu à entendre ou sentir un «déclic». ATTENTION : Ne pas utiliser de bouchon en plastique pour insérer le conduit dans le connecteur. 2. S assurer que le ruban d identification jaune sur l extrémité du conduit est caché dans le raccord rapide. (Ceci indique une bonne mise en place du joint.) 3. Tirer vivement en arrière sur le conduit pour s assurer que le conduit est fixé dans le connecteur. 4. Emboîter le bouchon en plastique sur le raccord rapide. Ne pas appuyer à la main sur l attache de retenue pendant cette opération. Le bouchon en plastique doit être complètement enfoncé contre le six pans du raccord rapide. 5. S assurer que le conduit n est pas plié pendant la procédure. PIÈCE N 463504 6 FEUILLE DE 463504 6

NOTICE D INSTALLATION FIGURE 6 Français MOTEUR CÂBLE POSITIF DE LA BATTERIE (ADMISSION) (ADMISSION) (SORTIE) ATTACHE FAISCEAU DU MOTEUR (SORTIE) ATTACHE ATTACHE VUE D &LM7/LQ4/LR4 ILLUSTRÉ (ADMISSION) VUE D POUR MOTEURS DE 4,3 L (ADMISSION) (SORTIE) (SORTIE) ATTACHE VUE C VUE E PIÈCE N 463504 7 FEUILLE DE 463504 7

NOTICE D INSTALLATION Français FIGURE 7 FIGURE 8 RADIATEUR D HUILE DE BOÎTE DE VITESSES (DE LA BOÎTE DE VITESSES) FLEXIBLE AUXILIAIRE (VERS LE RADIATEUR) FIGURE 9 FLEXIBLE AUXILIAIRE ENSEMBLE BOULONS (2) ATTACHE SUPPORT DE RADIATEUR PIÈCE N 463504 8 FEUILLE DE 463504 8

HOJA DE INSTRUCCIONES DE INSTALACIÓN Español Instrucciones de instalación para el enfriador de aceite de la transmisión Contenido del juego: Cantidad Descripción 1 Enfriador de aceite de la transmisión 1 Tubo 1 Manguera 1 Grapa 2 Pernos 1 Hoja de instrucciones Nota: Revise las instrucciones y el contenido antes de empezar. 1) Retire el conjunto de tubos superior (Figure 1) del radiador (Figura 2) y transmisión (Figura 3). Retire el conjunto de tubos superior de las tres 3 grapas en la Figura 6. 2) Instale el conjunto de manguera auxiliar al radiador (Figuras 2 y 4). Vea la Figura 5 para un procedimiento de instalación y conexión rápido. 3) Instale el conjunto de tubos (Figura 4) a la transmisión (Figure 3) use la Figura 5 para un procedimiento de instalación y conexión rápido. 4) Instale el conjunto del enfriador con dos pernos arriba. Apriete a una torsión de 9 Nm. (Figura 7) 5) Instale el conjunto de tubos al enfriador de aceite de la transmisión. Instale el conjunto de manguera auxiliar al enfriador de aceite de la transmisión para el paso 5. Use la figura 5 para un procedimiento de instalación y conexión rápido. Vea la Figura 8 para la ubicación. 6) Instale el conjunto de tubos y mangueras auxiliares en la grapa suministrada. Instale la grapa en el soporte del radiador. (Figura 9) FIGURA 1 FIGURA 2 CONJUNTO SUPERIOR DE S (QUITAR) CONJUNTO DE MANGUERA AUXILIAR (AGREGAR) E CONJUNTO SUPERIOR DE S D C RADIADOR B CONJUNTO INFERIOR DE S (SALIDA) 463504 9 PARTE NO. HOJA DE 9 463504 9

HOJA DE INSTRUCCIONES DE INSTALACIÓN Español FIGURA 3 TRANSMISIÓN CONJUNTO SUPERIOR DE S (QUITAR) FIGURA 5 TAPÓN DE PLÁSTICO BANDA AMARILLA DE IDENTIFICACIÓN RETENEDOR (GRAPA) CONJUNTO DE S (AGREGAR) CONJUNTO DE CONECTOR RÁPIDO ANILLO (SALIDA) FIGURA 4 CONJUNTO MANGUERA AUXILIAR CONJUNTO INSTALACIÓN CORRECTA CLARO BANDA AMARILLA DE IDENTIFICACIÓN F INSTALACIÓN INCORRECTA A E D C B CONJUNTO DE (SALIDA) Procedimiento de instalación de conexión rápida EOC/TOC 1. Inserte el tubo en el conector hasta que escuche o se sienta un chasquido. PRUCIÓN: No use un tapón plástico para insertar el tubo en el conector. 2. Asegure que la banda de identificación amarilla en el tubo esté escondida dentro del conjunto de conexión rápida. (Esto indica un asentamiento correcto de la unión.) 3. Tire fuertemente al tubo para asegurar que está bien sujeto al conector. 4. Abroche el tapón de plástico al conjunto del conector rápido. No presione manualmente el retenedor (grapa) durante esta operación. El tapón de plástico debe quedar bien asentado contra la hexagonal del conector rápido. 5. Asegure que el tubo no se dobló en el proceso. 463504 10 PARTE NO. HOJA DE 10 463504 10

HOJA DE INSTRUCCIONES DE INSTALACIÓN FIGURA 6 Español MOTOR EL CABLE POSITIVO DE LA BATERÍA (ENTRADA) (ENTRADA) (SALIDA) ENGANCHE MAZO DEL MOTOR (SALIDA) GRAPA GRAPA VISTA D &LM7/LQ4/LR4 SE MUESTRA (ENTRADA) (ENTRADA) (SALIDA) VISTA D PARA MOTORES 4.3L (SALIDA) GRAPA VISTA C VISTA E 463504 11 PARTE NO. HOJA DE 11 463504 11

HOJA DE INSTRUCCIONES DE INSTALACIÓN Español FIGURA 7 FIGURA 8 ENFRIADOR DE ACEITE DE LA TRANSMISIÓN CONJUNTO DE S (DE LA TRANSMISIÓN) CONJUNTO DE MANGUERA AUXILIAR (ALRADIADOR) FIGURA 9 CONJUNTO DE MANGUERA AUXILIAR CONJUNTO PERNOS (2) GRAPA SOPORTE DEL RADIADOR 463504 PARTE NO. HOJA DE 463504