Updates on International Grid Codes



Documentos relacionados
Seminario de Electrónica Industrial

PLANNING THE INTEGRATION OF DER IN THE COLOMBIAN POWER GRID

CRITICAL ELEMENTS OF THE INTEGRATION OF THE WIND POWER INTO THE ELECTRICAL

Tema 6: Convertidores de potencia aplicados a plantas fotovoltaicas

Cables monopolares media tensión aislados 90 ºC Monopolar insulated medium voltage cables 90 ºC

Seminario de Electrónica Industrial

Sistema de Luminarias Tecnológica - Verde - Eficiente

Intensidad Nominal del fusible / Fuse Rated current 10 6/ ,

MOBILITY SOLUTIONS CORNER. 19 de Noviembre, Barcelona

LV Surge Protection Devices Módulos De Protección Contra Sobretensiones De Bajo Voltage

MODELADO DE LA CARGA Y DESCARGA DEL VEHÍCULO ELÉCTRICO Y SU IMPACTO A CORTO PLAZO EN EL SISTEMA ELÉCTRICO DE OPERACIÓN

GENERADORES DE ELECTRICIDAD

FUSIBLES CILINDRICOS INDUSTRIALES am INDUSTRIAL CYLINDRICAL am FUSE-LINKS

Video Server. Quick Installation Guide. English, Español

ESTUDIO DE LA ESTABILIDAD DE UNA RED ELÉCTRICA

Schindler 7000 Planning parameters of high-rise elevators.

RTD SUPPORT TO AERONAUTICS IN SPAIN

Sistema de retención para mangueras de presión

Installing a PMU for an Underground Power Plant Santiago Mesa Jaramillo, MSc

Subdirección de Desarrollo de Proyectos. March 2012

PRESS CLIPPING 27 May

SFD-200-N-B DESPERTADOR-PROYECTOR-CON VOZ. Manual de instrucciones

LAC Modificación DIRECT ALLOCATIONS TO ISPs DISTRIBUCIONES INICIALES A ISPs

Hard Disk Drive Duplicator Dock USB 3.0 to SATA HDD Duplicator. StarTech ID: SATDOCK22RU3

SISTEMAS DE PROTECCIÓN ELÉCTRICA

ENERGY EFFICIENCY IN ELECTRIC MOTORS HIGH ENERGY EFFICIENCY SYSTEMS IN ELECTRIC MOTORS


TYPE SUITABLE FOR INPUT VOLTAGE. 1 ~ 3 leds 1W VAC 2-12 VDC 350 ma IP67 Blanco White FUSCC-4-350T TYPE POWER INPUT VOLTAGE.

Connecting Cloudino Connector to FIWARE IoT

RENEWABLE OCEAN ENERGY

FUSIBLES CILÍNDRICOS MT PARA APLICACIONES DE ALUMBRADO MV CYLINDRICAL FUSE-LINKS FOR LIGHTING PURPOSES

FCC Information : Warning: RF warning statement:

ARTICULO: Indicador entrada programable Multi input indicator

Normas IEC en el TC64 Reglas de instalación para baja tensión

Presentación de productos Product Overview

Are you interested in helping to GOVERN the Authority, DEVELOP current and future programs, and APPROVE contracts?

Centro Andaluz de Innovación y Tecnologías de la Información y las Comunicaciones - CITIC

With temperature switch Cover for protection against high surface temperatures

EN United in diversity EN A8-0204/83. Amendment

Comité de usuarios de la RES

Monitoreo de la red IDE (WMS)

ANX-PR/CL/ GUÍA DE APRENDIZAJE ASIGNATURA CURSO ACADÉMICO - SEMESTRE FECHA DE PUBLICACION

REGULADOR DE VOLTAGE AUTOMATICO (AVR) AVR2_5

LAC Modificación DIRECT ALLOCATIONS TO ISPs DISTRIBUCIONES DIRECTAS A ISPs

CONVERTIDOR 5,6-5,9 GHZ

Portable esata USB to SATA Standalone HDD Hard Drive Duplicator Dock. StarTech ID: SATDUPUEGB

Producto Marca Código Amplificador CATV troncal Trunk terrestrial amplifier. Especificaciones técnicas / Technical specifications

Tema: Study for the Analysis and the Conceptual Development of a European Port Access System. Ponente: Mario J. Moya Denia

SIHI México, S. de R.L. de C.V. Pricing Guide

Este proyecto tiene como finalidad la creación de una aplicación para la gestión y explotación de los teléfonos de los empleados de una gran compañía.

ARTICULO: L Actuador Eléctrico Reversible GE Multivoltage GE Multivoltage Reversible Electric Actuator

TRANSFORMADOR INTELIGENTE RESUMEN DEL PROYECTO. Autor: Salvador Prado, Pablo. Carnicero López, Alberto. López García, Oscar.

FUSIBLES CILÍNDRICOS 10x85 PARA INSTALACIONES FOTOVOLTAICAS CYLINDRICAL FUSE-LINKS 10x85 FOR PHOTOVOLTAIC INSTALLATIONS

Efecto de las nubes magnéticas sobre la propagación de los rayos cósmicos

Autor: Arrieta Martínez, Gonzalo. RESUMEN DEL PROYECTO

TRABAJO EN EQUIPO MOZ/BRAZIL

FICHA TÉCNICA / TECHNICAL DATA SHEET

LAP MODULADOR QAM ANEXO A / B WT-3303

PROYECTO - WLAB. SISTEMA DE CONTROL REMOTO EN TIEMPO REAL DE EQUIPOS DE LABOROTORIO AUTORA: Sara Mira Fernández. Resumen

ABB SACE Communication Capability Portfolio Low voltage Breakers

CAJAS DE TRANSMISIÓN DE SIMPLE ASPIRACIÓN Serie UPE-SA

Control predictivo no lineal: Estado del arte y nuevos resultados

AUTOMATIC TRANSFER SWITCH

GUÍA DE USUARIO USER GUIDE 2.1 Multimedia Speaker System Design Line APPSP2102

REOVIB MFS 268 IP 54 or IP 20, Frequency-control with automatic detection of the resonant frequency

- Plazo Máximo de Presentación de Solicitud del Incentivo: 31/10/ Aeropuerto de Origen: Nueva York John F. Kennedy (JFK).

GENERACIÓN SOLAR TERMOELÉCTRICA GESTE 2010

ASTROLUM TCS ASTROLUM TCS. ASTROLUM TCS es un sistema de telegestión para instalaciones de alumbrado público.

ARTICULO: 5810 Sistema de Posicionador Digital para Actuador Eléctrico Digital Positioning System for Electric Actuator

Nivel de aislamiento 100 y 133%, pantalla cinta de cobre, 5 kv a 46 kv. 100 and 133% insulation level, copper tape shield, 5 kv to 46 kv

Sensor de Proximidad Inductivo IKZ GH

PROBLEMAS PARA LA CLASE DEL 20 DE FEBRERO DEL 2008

Protistor size 72 gr 690VAC (IEC)

LECTOR PROXIMIDAD 4K AUTONOMO STANDALONE 4K PROXIMITY READER REF: HI / /14

AIP ENR CLASIFICACIÓN DEL ESPACIO AÉREO / AIRSPACE CLASSIFICATION

SUSTITUCIÓN DE TUBOS FLUORESCENTES POR TUBOS DE LEDs CHANGING FLUORESCENT TO LED TUBES

PRESENTACIÓN INTRODUCTION

Validación y Optimización de Ultracondensadores como Sistema de Almacenamiento de Energía para los Sistemas Eléctricos Aislados

ESP ENG INDEX INDICE. Intro. Models for SINGLE-PHASE 230V 50/60Hz mains

FUSIBLES DE CUCHILLA NH gg 690 V CON PERCUTOR NH KNIFE TYPE gg 690V FUSE-LINKS WITH STRIKER

Propuesta de modificación código de conexión para la incorporación del recurso eólico Orden de Consultoría UPME

EO - Energía Eólica

Lump Sum Final Check Contribution to Deferred Compensation

REQUISITOS TECNICOS PARA INSTALACIONES EOLICAS Y FOTOVOLTAICAS. TECNICAS DIGSILENT DE ENSAYO DE INSTALACIONES.

DC/DC Converter FV-H E

Specifications, Installation, and Operating Instructions GrowerSELECT 230 VAC Replacement Feed Sensor With Heating Element HS09

control transformers ct Transformadores de control CT

Soluciones Embedded para industria energética

ANÁLISIS DE LOS FACTORES DE ÉXITO DE LAS POLÍTICAS DE PROMOCIÓN DE ENERGÍAS RENOVABLES

Generator Circuit Breaker (GCB)

MANUAL DE INSTRUCCIONES INSTRUCTION MANUAL

EQUIPO COMBINADO ELEC.+ULT. (16 FO.) EL.24-ELUT EQUIPO COMBINADO ELEC.+ULT. (26 FO.) EL.25-ELUT EQUIPO COMBINADO ELEC.+ULT. +LAS. (30 FO.) EL.

SH 68 Project. Fact Sheet

Speak Up! In Spanish. Young s Language Consulting. Young's Language Consulting. Lesson 1 Meeting and Greeting People.

Protocol Amending the Convention Between the United States of America and the

MÓDULO MULTI FUNCIÓN MULTI FUNCTION MODULE

Cálculo Fraccinario en Control y Robótica. Aplicaciones en Robótica Móvil

grid scale energy storage do we need special regulatory (and thus market) frameworks for storage?

FUSIBLES DE CUCHILLA NH gg 690 V (Ind. Sup.) NH KNIFE TYPE gg 690V FUSE-LINKS (top Indic.)

Transcripción:

DIgSILENT Home Office Updates on International Grid Codes!" #$ $!%" &"!'(") *+,! (! *+,!%! '-%) *!+ ',!) *!+.! ++!!* (!% by DIgSILENT Ibérica Techwindgrid 09 20/21 April 2009, Madrid DIgSILENT Ibérica, S.L. 21.04.2009 2 DIgSILENT Group Activities,! * %. $ / 01 +,+ * -+2+,! /!%!"! (#++,! &!% 0 3,,!* %!%4!* " -%! #(5 4% -! &5 &5 %" -+ *+ -! &5 -($ 3 $6!% "! -%! /*%7 &!!%8!*! +, -!! 9! %*+++ *!!"!!,%% (4! *!!!1##* /!!!% -+ / / +0 :!%"!"! +,* -+2 /**%! '! ;, :!! &!! <6!!*,!!= >*!)!!!* &$ '= (60!" / 3/ %**) 6!" 3 6* 3 %!* & $ (?$, (! /%! /,?, +,+-+!*,!!,% #!*-!*+@ -+ <! % <" + 68%!*?% ;1!! <4 1 /! - - # /-- ;* <* @ %!*!!* 2 (6 % *+ DIgSILENT Ibérica, S.L. 21.04.2009 3 6!!*6!!A! "# -%!* $! #(6 " * # " #!3! DIgSILENT Ibérica, S.L. 21.04.2009 4 1

1000.00 800.00 600.00 400.00 200.00 0.00 2.0E+3 1.0E+3 0.0E+0-1.0E+3 10000 [s] 100 1 0.01 0.40 kv 100 1000 10000 100000 1000000 [pri.a] 10000000 20.00 kv 1.00 5.00 7.00 11.0 13.0 17.0 19.0 23.0 25.0 29.0 31.0 [-] D-3: Current, Magnitude in A D-4: Current, Magnitude in A T-BL_UW3: Current, Magnitude/HV-Side in A -2.0E+3-0.00 0.02 0.04 0.06 0.08 [s] D-3: Current in A D-4: Current in A T-BL_UW3: Current/HV-Side in A Masterpac MP M20H1/800A 10.588 s 0.687 s OC-Relay Type I>/I>> Fuse 300 A A055C300E 10 100 1000 10000 100000 Motor 1 SS-T/T-LV SS-L2/SS-T Cub_2\I>I>>_Trafo Cub_2\Motor Relay Cub_2\Fuse Cable 0.10 DIgSILENT PowerFactory DIgSILENT #$%& #/?*6!*!* %!!%" %! % 6 61 Iberian product: Testing system for wind farm and solar plants #!%!! BB B % I =1850.301 pri.a I =1821.774 pri.a I =113974.200 pri.a DIgSILENT #/%%! #@ #! DIgSILENT Ibérica, S.L. 21.04.2009 5 DIgSILENT Ibérica, S.L. 21.04.2009 6 Testing Centralized Voltage Controllers Testing Centralized Voltage Controllers PROJECT STAGE 1: Strategies definition Central Controller design Verification with simulation PROJECT STAGE 2: The same wind farm is used to test the controller implemented in c++. Interface PF-DLL Q CONTROL MODE 1 Total Total Qset Qset ( i) = number of available wind turbines Q CONTROL MODE 2 Q Total set ( i + 1) = Q ( i) Q Total set i set DIgSILENT Ibérica, S.L. 21.04.2009 7 DIgSILENT Ibérica, S.L. 21.04.2009 8 2

Testing Centralized Voltage Controllers Testing Centralized Voltage Controllers PROJECT STAGE 3: The same wind farm is used to test the controller implemented in c++ on an OPC server. Interface PF-OPC server. Wind Farm Controller: 1.075 1.050 1.025 U_SET_MAX 1.05 p.u. 1.15 1.10 1.05 1.00 U_WT_MAX 1.10 p.u. DIgSILENT 1.000 0.95 0.90 U_WT_MIN 0.90 p.u. 0.975 U_SET_MIN 0.95 p.u. 0.950 0.925 13.88 64.08 114.3 164.5 214.7 [s] 264.9 2-Winding Transformer: Tensión, Magnitud/Lado HV in p.u. 2-Winding Transformer: Tensión, Magnitud/Lado LV in p.u. 0.85 13.88 64.08 114.3 164.5 214.7 [s] 264.9 WT1: Tensión, Magnitud in p.u. WT2: Tensión, Magnitud in p.u. WT3: Tensión, Magnitud in p.u. WT4: Tensión, Magnitud in p.u. WT5: Tensión, Magnitud in p.u. WT6: Tensión, Magnitud in p.u. WT7: Tensión, Magnitud in p.u. 3.00 0.30 2.00 0.20 0.10 1.00 0.00 0.00-0.10-1.00-2.00-3.00 13.88 64.08 114.3 164.5 214.7 [s] 264.9 2-Winding Transformer: Posición Actual del Tap -0.20 13.88 64.08 114.3 164.5 214.7 [s] 264.9 DIgSILENT Ibérica, S.L. 21.04.2009 9 DIgSILENT Ibérica, S.L. 21.04.2009 10 Updates on International Grid Codes Grid Codes: Short worldwide overview DIgSILENT Ibérica, S.L. 21.04.2009 11 DIgSILENT Ibérica, S.L. 21.04.2009 12 3

MINIMOS DE DISEÑO, EQUIPAMIENTO, FUNCIONAMIENTO, PUESTA EN SERVICIO Y SEGURIDAD Current version: April 2009 SPAIN DIgSILENT Ibérica, S.L. 21.04.2009 13 Status: Under discussion Starting from: 01/01/2011 (or 2012) Applicable to: - Generation connected to HV network - Generation connected to MV network if P>10MW - Distributed generation sharing the same connection point if P grouped >10MW New features: - Power quality limits - Distinction between directly coupled Sync. Generators, WP and PV - Power and Voltage regulation requirements at PCC level - Requirements on negative sequence currents - Islanding features DIgSILENT Ibérica, S.L. 21.04.2009 14 General Power Quality Requirements: Flicker According to IEC61000-3-7 Harmonics According to IEC 61000-3-6 Unbalance Planning level Pst1.0 Plt0.8 THD: 3.00% I - /I + 1% for short duration unbalance (>10 min) I - /I + 2% for very short duration unbalance (<10min) Emission limits Pst0.8 Plt0.6 THD: 3.00% I - /I + 0.7% for short duration unbalance (>10 min) I - /I + 1% for very short duration unbalance (<10min) DIgSILENT Ibérica, S.L. 21.04.2009 15 DIgSILENT Ibérica, S.L. 21.04.2009 16 4

Low Voltage Ride Through: - Capability to stay connected in case of 3PH/1PH voltage dip 0% duration 1 second. - Capability to stay connected in case of 2PH voltage dip 0.5% duration 1 second. - Capability to stay connected in case of phase shift 30º -Reactive power support controlled by AVR Overvoltage Ride Through: -3PH/2PH/1PH figure -Occasionally, up to 125% if voltage was 110% -Reactive power support controlled by AVR DIgSILENT Ibérica, S.L. 21.04.2009 17 DIgSILENT Ibérica, S.L. 21.04.2009 18 Frequency disturbances: - Capability to stay connected unless f < 48 Hz during 3 seconds or more - Instantaneous disconnection if f < 47.5 Hz - Capability to stay connected if f reaches 51.5 Hz - Capability to stay connected during df/dt < ±2Hz/second. Frequency regulation: - Primary regulation mandatory - PSS mandatory when rated power P>50MW DIgSILENT Ibérica, S.L. 21.04.2009 19 DIgSILENT Ibérica, S.L. 21.04.2009 20 5

Islanding: - Coordination with MV islanding protections to avoid unneeded disconnection. - New thermal units are requested to stay connected on islanding mode + auxiliary services. - New hydro + pumping units are requested to provide: - self-starting - auto-energization - islanding regulation capabilities. Voltage regulation: - A Voltage deadband setpoint will be provided by the operator. - Voltage error inside the deadband. - Q regulation capability 0P rated. - Out of margins 1-V V 1+V, as allowed by P produced. DIgSILENT Ibérica, S.L. 21.04.2009 21 DIgSILENT Ibérica, S.L. 21.04.2009 22 Low voltage ride through: - 3PH faults as in the figure - 2PH faults 0.5 and 0.6 p.u. instead Phase shift ride through: -Capability to stay connected in case of phase shift 30º DIgSILENT Ibérica, S.L. 21.04.2009 23 DIgSILENT Ibérica, S.L. 21.04.2009 24 6

Overvoltage ride through: - 3PH/2PH/1PH as in the figure - Occasionally, up to 125% if voltage was 110% - Power Electronic Converters can be blocked if V>125% providing I r =0 p.u. - Reactive power support controlled by AVR Voltage regulation during disturbances: - Voltage support during distubances I max = I rated - Voltage regulation provided by an AVR during disturbances: - To maintain Vsetpoint = Vprior to the disturbance - In case of unbalance, positive seq voltage - In operation when V is out of normal operation range. - Reactive current absorption/injection as in the next slide DIgSILENT Ibérica, S.L. 21.04.2009 25 DIgSILENT Ibérica, S.L. 21.04.2009 26 Power regulation during disturbances: DIgSILENT Ibérica, S.L. 21.04.2009 27 DIgSILENT Ibérica, S.L. 21.04.2009 28 7

Requirements during the disturbances: - Limits on P, Q consumption as in P.O.12.3, during the dip and after the dip - NEGATIVE SEQUENCE CONTRIBUTION (not a requirement yet, to be discussed and fixed according to the network requirements) Frequency disturbances: - Capability to stay connected unless f < 48 Hz during 3 seconds or more - Instantaneous disconnection if f < 47.5 Hz - Capability to stay connected if f reaches 51.5 Hz - Capability to stay connected during df/dt < ±2Hz/second. - Coordination with MV islanding protections to avoid unneeded disconnection. DIgSILENT Ibérica, S.L. 21.04.2009 29 Frequency regulation: - Primary regulation mandatory P / M K = f / f base base -Time response: 1-30 sec or inertial response emulation if agreed with the TSO. -PSS damping, to be agreed with the TSO DIgSILENT Ibérica, S.L. 21.04.2009 30 Frequency regulation: - Primary regulation mandatory P / M K = f / f base base MINIMOS The WF DE DISEÑO, should guarantee EQUIPAMIENTO, FUNCIONAMIENTO, PUESTA the EN reserve SERVICIO availability Y SEGURIDAD related to wind speed Specificto requirements: be able to increase 2) Wind, Produced solar and Power other power plants without a (exception if Pproduced<20%) GERMANY -Time response: 1-30 sec or inertial response emulation if agreed with the TSO. -PSS damping, to be agreed with the TSO DIgSILENT Ibérica, S.L. 21.04.2009 31 DIgSILENT Ibérica, S.L. 21.04.2009 32 8

Germany Germany Operator: Technische Richtlinie. Erzeugungsanlagen am Mittelspannungsnetz (Richtlinie Anschluss und Parallelbetrieb von Erzeugungsanlagen Mittelspannungsnetz) Operator: Technische Richtlinie. Erzeugungsanlagen am Mittelspannungsnetz (Richtlinie Anschluss und Parallelbetrieb von Erzeugungsanlagen Mittelspannungsnetz) für am für am By: BDEW, Bundesverband der Energie- und Wasserwirtschaft e.v. By: BDEW, Bundesverband der Energie- und Wasserwirtschaft e.v. Network: Distribution level Network: Distribution level Frequency regulation as in 2007 Transmission Grid Code TYPE 2 TYPE 1 DIgSILENT Ibérica, S.L. 21.04.2009 TYPE 2 33 DIgSILENT Ibérica, S.L. 21.04.2009 34 21.04.2009 36 Germany Operator: Technische Richtlinie. Erzeugungsanlagen am Mittelspannungsnetz (Richtlinie Anschluss und Parallelbetrieb von Erzeugungsanlagen Mittelspannungsnetz) für am By: BDEW, Bundesverband der Energie- und Wasserwirtschaft e.v. Network: Distribution level DENMARK Reclosing DIgSILENT Ibérica, S.L. 21.04.2009 35 DIgSILENT Ibérica, S.L. 9

Denmark Denmark Operator: EnergyNet.dk Network: Distribution level (< 100kV) Particularity: Double Disturbance Operator: EnergyNet.dk Network: Distribution level (< 100kV) Particularity: Double Disturbance. Capacity to stand: - Two 2PH/3PH Short Circuit within a 2 min interval - Energy reserve enough to stand SIX 2PH/3PH Short Circuits within 5 min interval DIgSILENT Ibérica, S.L. 21.04.2009 37 DIgSILENT Ibérica, S.L. 21.04.2009 38 Denmark Denmark Operator: EnergyNet.dk Network: Transmission level (> 100kV) Particularity: For Wind Farms: - 3PH short circuit 100ms - 1/2PH short circuit 100 ms, followed by a new one after 300-500ms For Wind Turbine: - Two 1/2/3PH Short Circuit within 2 min interval - Energy reserve for SIX 1/2/3 PH short circuit with 5 min interval. Operator: EnergyNet.dk Network: Transmission level (> 100kV) Particularity: SIMULATIONS - Slow voltage recovery DIgSILENT Ibérica, S.L. 21.04.2009 39 DIgSILENT Ibérica, S.L. 21.04.2009 40 10

Denmark Operator: EnergyNet.dk Network: Transmission level (> 100kV) Particularity: SIMULATIONS - Unbalance and reclosure CHINA DIgSILENT Ibérica, S.L. 21.04.2009 41 DIgSILENT Ibérica, S.L. 21.04.2009 42 China China Grid Code: Technical Rule for Connecting Wind Farm into Power Network By: State Grid Corporation / China Electric Power Research Institute Network: Voltages above 100(66) kv Primary control mandatory: setpoints will be sent by the operator. Recommendations on the power ramp rate during: - Cut in / Shut down - Increasing wind speed (not mandatory during wind speed decrease) - Maximum power rate can be discussed with the operator LVRT Requirements: Grid Code: Technical Rule for Connecting Wind Farm into Power Network By: State Grid Corporation / China Electric Power Research Institute Network: Voltages above 100(66) kv The installed capacity of wind farm (MW) <30 30-150 >150 10min maximum ramp rate (MW) 20 installed capacity /1.5 100 1min maximum ramp rate (MW) 6 installed capacity /5 30 -Emergency control: capability of reducing power when f>50.5hz, even disconnect. DIgSILENT Ibérica, S.L. 21.04.2009 43 DIgSILENT Ibérica, S.L. 21.04.2009 44 11

China China Frequency limits: Grid Code: Technical Rule for Connecting Wind Farm into Power Network By: State Grid Corporation / China Electric Power Research Institute Network: Voltages above 100(66) kv Range of frequency Below 48Hz 48Hz 49.5Hz 49.5Hz 50.5Hz 50.5Hz 51Hz Above 51Hz Requirements According to the permissible lowest operation frequency of the wind turbine. Maintaining continues operation for 10 min at least when frequency is lower than 49.5Hz Operating continuously. Maintaining continues operation for at least 2 minutes whenever frequency is above 50.5Hz, and no more shutting wind turbine cutting-in. Limit the output power with the order of the dispatching department. Grid Code: Technical Rule for Connecting Wind Farm into Power Network By: State Grid Corporation / China Electric Power Research Institute Network: Voltages above 100(66) kv Power Quality issues: Voltage deviations: V<10%Vrated. In general -3%Vrated<V<7%Vrated Voltage variations: The number of voltage variations per unit time R h d -1 10 r 100 100 r 1000 Flicker: It should meet the requirements stated in GB 12326-2000. Plt and Pst will be allocated depending on the short circuit power of the network. Harmonics: It should meet the requirements stated in GB / T 14549-1993. Harmonic emission levels should be allocated depending on the short circuit harmonic power of the network. R 1 1 r 10 3 2.5 1.5 1 DIgSILENT Ibérica, S.L. 21.04.2009 45 DIgSILENT Ibérica, S.L. 21.04.2009 46 China Conclusions Grid Code: Technical Rule for Connecting Wind Farm into Power Network By: State Grid Corporation / China Electric Power Research Institute Network: Voltages above 100(66) kv Simulations: -Wind Farm developers will provide models (PowerFactory DIgSILENT) which include: - parameters of wind turbines. - wind farm layout - wind turbine/wind farm control system - Maintenance/Update of models should be guaranteed by the Wind Farm Developer. More and more restrictive requirements are arising in many countries. Trend Simulation procedures to test/verify at wind farm level Towards harmonization?? DIgSILENT Ibérica, S.L. 21.04.2009 47 DIgSILENT Ibérica, S.L. 21.04.2009 48 12

Conclusion DIgSILENT Ibérica, S.L.: Contacto DIgSILENT Ibérica S.L. C\ Honduras, 8 - Bajo 3 28016 Madrid Phone: +34 911273723/24 Email: a.morales@digsilent.com x.robe@digsilent.com Website: www.digsilent.com DIgSILENT Ibérica, S.L. 21.04.2009 49 DIgSILENT Ibérica, S.L. 21.04.2009 50 13