1 2013 Operation Statistics Central Interconnected System Load Economic Dispatch Center

2

3 Contents Letter from the Chairman of the Board of Directors Letter from the Directors of Operations (I) and Tolls (I) Introduction Page 2 Page 4 Page 9 CHAPTER CHAPTER CHAPTER Page 23 Page 31 Page 47 History Background of Member Companies Owners of Generation, Transmission and Free Clients Facilities System s Operation of Term CHAPTER CHAPTER CHAPTER Page 83 Page 89 Page 119 Significant Aspects of the System s Operation During 2013 Transfers Among CDEC-SIC s Members Economic Background

4 Letter from the Chairman of the Board of Directors Juan Carlos Olmedo H. Chairman November, 2012/ November, 2013 Juan Cembrano P. Chairman November, 2013/ April, 2014 CDEC-SIC Operation Statistics Since its beginning, the Economic Load Dispatch Center of the Central Interconnected System, CDEC-SIC, has made available to the general public its Operational Statistics, a document showing the evolution of the main indicators in the electric market managed by it. On this opportunity, and on behalf of the Board of Directors of the CDEC-SIC, we are pleased to present you with the year 2013 version. Within this context, we report to you some of the main milestones occurred during last year which are related to the organization s progress and evolution. In the regulatory context, the publication of Supreme Decree N 115 from the Ministry of Energy should be highlighted, which amended Supreme Decree N 291 of the Ministry of Economy, and regulates the structure, operations, and financing of the CDECs. Among other issues, it changed the selection process of the members of the Board of Directors, whom shall be elected for a segment of member companies from a list of three candidates presented by a specialized external company. It must be also pointed out that such candidates shall neither be employees of the member companies nor be their independent advisor, which reaffirms the decision making autonomy inside the organization. Also, the number of Directors was decreased to five with their corresponding alternates, thus leveling the number of representatives for each segment of member companies. At the same time, a new mechanism was established for the search and selection of the CDEC-SIC s Technical Directors and a new Planning and Development Office was created, with significant tasks regarding analysis and studies related to the transmission systems. The multiple tasks undertaken by the organization inspired the decision of incorporating 16 new professionals during 2013, with the intention to incorporate a similar number during 2014 mainly as a result of structuring the new Direction of Planning and Development, and of the need to strengthen the already existing different areas. Considering the above, the Board of Directors decided to create a Human Resources Area, which was established during the last quarter of 2013 and which is responsible of strengthening, among other, aspects related to management of soft skills, development of human resources policies and performance management, aimed to keep the talent and to improve the capabilities of our staff. We trust that these decisions will allow us facing in a better manner the requirements of the regulatory framework ruling us. Concurrently, the implementation of the new

5 CDEC-SIC facilities was terminated, where the new staff of professionals will be located. In order to strictly comply with the CDEC-SIC s tasks, at the beginning of the month of May the Regulatory and Technical Comptrollership Direction was created, with the main task of providing cross support to the Technical Offices in the regulatory and methodological aspects. In this area, it is worth mentioning its contribution to the implementation and function of the Technical Offices procedures, and to the supervision in the audit of the coordinated companies. exceedance probability of 91% (that is, 91% of the years in the statistical data used by CDEC- SIC are wetter than the indicated water year). The electric system management shows favorable results, without any blackout situation during the term, with the energy not suplied from contingency events amounting to 24.9 GWh, which represents less than 0.05% of the SIC s total energy production. Nevertheless, it should be taken into account that a great part of such energy not supplied was originated by the strong earthquake that affected Copiapó area at the end of January, Regarding other issues of interest, during the last year the Board of Directors made progresses in the implementation of the autonomous function management of the CDEC-SIC organization. A preliminary study was requested and analyzed, oriented to materialize a new facility for the CDEC-SIC; progresses were made towards the creation of new Internal Regulations that include all the changes and adaptations experienced by the sector regulatory framework. The above tasks must be concluded during the current management. In the operational area, 2013 ended with indicators showing an expansion of the electric system in terms of either offer and demand offer and demand, reflected in: - 4.1% increase of the installed capacity % increase of energy production, totalizing 50,939 GWh % increase of energy sales in the system, totalizing 47,777 GWh (representing 70.1% of sales to regulated price clients, equivalent to 33,511 GWh) % increase in the annual maximum demand value, which reached a peak of 7,282 MW (recorded in December) % increase in the hourly maximum demand value, which reached a peak of 6,794 MW (recorded in June). Such growth was achieved under unfavorable hydrological conditions, resulting from the fourth consecutive year of dry characteristics. This has been reflected in the low hydric contribution to demand supply, which showed a 38.4% on average during the year. In line with the above, water year ends with a 2014 will be accompanied by significant challenges for us, among other the new requirements of the CDEC Regulations and the updated version of the Service Quality and Safety Technical Standard; the start-up of the CDEC-SIC s new SCADA at the CDEC- SIC; everything related to Ancillary Services, as well as the bidding processes to be carried out because of new necessary works in the Trunk Transmission System. We have prepared ourselves to live up to the new challenges. We end these words with a commitment to a maximum effort by the Board of Directors, to continue delivering a responsible, transparent and reliable work in order to continue giving the guarantee of independence to all agents in the sector. For this purpose, we have the most important asset: our people, highly qualified and suitable professionals that are part of this CDEC-SIC. Board of Directors Letter from the Chairman of the Board of Directors 3

6 Letter from the Directors of Operations (I) and Tolls (I) Rodrigo Barbagelata S. Ernesto Huber J. CDEC-SIC Operation Statistics As the (Interim) Directors of the CDEC-SIC Technical Offices we are pleased to report some of the tasks and activities carried out by these offices during Regarding regulatory aspects, the procedures referred to in Supreme Decree 130/2011 on Ancillary Services were prepared and submitted to the companies s consideration. In the area of the Operations Direction (DO), such procedures are referred to Quantification, resources availability and need to install and/ or implement equipment for SSCC rendering, Equipment costs statement for SSCC rendering, SSCC Operations Instructions and Verification and Follow-up of effective compliance by Ancillary Services ; while the Tolls Direction (DP) was in charge of preparing the procedure on SSCC Remuneration. As stipulated in theregulatory framework in force, disagreement on these issues by any company member of CDEC-SIC allows them to request a pronouncement of the Experts Panel on the matter that is the matter of discrepancy. Within this context, the DO procedure Equipment costs statement for SSCC rendering and the DP procedure SSCC Remuneration were presented to the Panel. Once discrepancies were solved, the SSCC procedures were presented for a favorable report those to the National Energy Commission (CNE). Also, the DP procedure Calculation and Determining Energy Economic Transfers and the DO procedure Development of Technical Audits on the CDEC-SIC were prepared and submitted for consideration to the companies. The DO Procedure on Audits was presented for a favorable report to the CNE in April, while the indicated DP Procedure was the subject of two discrepancies during the year. Regarding the first one the Experts Panel determined that the Procedure s preparation should be restarted, consequently the DP submitted a new version in October, with the purpose of submitting it as established in Article 10 of Supreme Decree 291/2007. The second discrepancy was presented in December, and the Panel s Decision remained pending until the beginning of In addition, by the end of the year the DP Procedure on Economic Transfers Measurement Systems had been submitted to the companies for comments. The aforementioned Procedure is part of the Invoicing Measures centralization project in progress at the DP, which purpose is to allow direct access to the information available in the measurement equipment installed in the system. For this reason, progress was made

7 In the meters homologation and in the preparation of the technical specifications of the economic transfer s measurement reception platform, a document that will be a part of the Bidding Terms to award the design and development of such platform. On the issues related to the Technical Standard or Grid Code and according with it, during 2013 the following studies were prepared and published: - Friday, May 17, final report Frequency Control Study and Reserves Determination. - Thursday, May 30, annual report on compliance level with the aspects indicated In Art Wednesday, July 17, final report Transmission System Constraints Study. - Thursday, August 29, final report Voltage Control and reactive power requirements study. - Tuesday, September 17, comments by DO and DP are submitted to the CNE, as well as by the coordinated companies to the new draft proposal version of the NT of SyCS, corresponding to its four-year review. - Tuesday, October 29, final version of EDAC Sub-frequency study. - Monday, November 11, publication of review on Defense Plan against Extreme Contingencies 2013 version. - Friday, November 29, final report Specific Study on the Service voltages. - Monday, December 16, publication of the studies calendar indicated in Article 1-9 of the NT of SyCS. - Monday, December 30, publication of final reports on Protection Coordination Verification Study and Continuation Study. Regarding new construction at the SIC s generation-transmission system, during 2013 the following incorporations were made, on the following dates. New generation works: - On Thursday, January 3, the Ucuquer eolic PMGD owned by Energías Ucuquer S.A. was incorporated, with a 7.2 MW capacity. - On Thursday, January 10, the Estancilla thermal PMGD owned by Generadora Estancilla was incorporated, with a 3.0 MW capacity. - On Monday, March 11, the Tamm thermal PMGD owned by Genera Austral S.A. was incorporated, with a 0.2 MW capacity. - On Friday, March 15 the Campiche coalfired thermal power plant owned by Empresa Eléctrica Campiche S.A. was delivered for exploitation, with a MW capacity - On Thursday, March 28, the Providencia hydro power plant owned by Hidroeléctrica Providencia was delivered for exploitation, with a 14.2 MW capacity - On Saturday, April 13, the last units of Talinay eolic farm owned by Parque Talinay Oriente S.A. were delivered for exploitation, with a total 90.0 MW capacity. - On Wednesday, April 24, the Roblería hydro PMGD, owned by Generadora Eléctrica Roblería was incorporated, with a 4.0 MW capacity. - On Thursday, April 25, Don Walterio hydro PMGD, owned by Generadora Eléctrica Rhom was incorporated, with a 3.0 MW capacity. - On Wednesday, May 1, the Laja CMPC biomass thermal power plant, owned by Bioenergías Forestales S.A. was delivered for exploitation, with a 25.0 MW capacity. - On Monday, May 6, the Ancali 1 thermal PMGD owned by Agrícola Ancali Ltda. was incorporated, with a 1.6 MW capacity - On Wednesday, May 22, El Arrayán hydro PMGD owned by Energías Renovables El Arrayán Ltda. was incorporated, with a 0.2 MW capacity. - On Thursday, May 23, Ensenada hydro PMGD owned by Hidroeléctrica Ensenada S.A. was incorporated, with a 1.2 MW capacity. - On Wednesday, May 29, MC1 and MC2 hydro PMGDs owned by HidroBonito S.A. were incorporated, with 9.0 and 3.2 MW capacity respectively. - On Monday, June 10, Hornitos solar PMGD owned by SubSole was incorporated, with a 0.3 MW capacity. - On Friday, June 28, Contra hydro PMGD owned by Contra S.A. was incorporated, with a 0.3 MW capacity. - On Monday, July 1, Viñales biomass thermal power plant owned by Arauco Bioenergía S.A. was delivered for exploitation, contributing with a total 22.0 MW surplus to the system. - On Saturday, July 27, Los Álamos thermal PMGD owned by SGA was incorporated, with a 0.8 MW capacity. - On Thursday, August 8, SDGx01solar PMG owned by SolaireDirect Chile S.A. was incorporated, with a 1.3 MW de capacity. - On Tuesday, September 3, Renaico hydro PMG owned by Mainco S.A. was incorporated, with a 6.3 MW capacity, as well as Santa Irene thermal PMGD owned by Genera Austral S.A., with a 0.4 MW capacity. - On Wednesday, October 9, Río Huasco hydro power plant owned by Hidroeléctrica Río Huasco S.A. was delivered for exploitation, with a 5.1 MW capacity. - On Thursday, November 14, Santa Cecilia solar PMGD owned by RERI Chile was incorporated, with a 3.0 MW capacity. - On Tuesday, December 10, Maisán hydro PMGD owned by Maisán S.A. was incorporated, with a 0.6 MW capacity. - On Friday, December 20, Salvador solar PMGD owned by RTS Energy was incorporated, with a 1.4 MW capacity. - On Monday, December 23, El Llano and Las Vertientes hydro PMGDs owned by E.E. Puntilla S.A. were incorporated, with 2.0 MW and 1.7 MW capacity respectively. With such incorporations plus the capacity increase at Coya (U5), Licantén, Los Colorados 2, Laja and Termopacífico power plant, at the end of 2013 the installed capacity at the SIC reached the amount of 14,147 MW. At the end of 2013, there were also generating power plant under commissioning process for a total around 300 MW, it is expected that their commercial operation start up will be complete during the first semester of The new transmission facilities were as follows: - On Friday, May 3, the SVC Plus at Diego de Almagro Sub-station owned by Transelec S.A.was delivered for exploitation, with +140/-100 MVAR. - On Sunday, July 7, the EDAGxCE acting on Guacolda power plant units was implemented and delivered for exploitation to control the transfers through Pan de Azúcar Punta Colorada Maitencillo 2x220 kv lines, in the event of contingencies in some of their circuits. - On Saturday, August 10, circuits 3 and 4 of Jahuel Chena 220 kv line owned by Transelec S.A. was delivered for exploitation. - On Tuesday, August 27, Mulchén Substation and circuit 1 of the 220 kv line Charrúa Mulchén and Mulchén Cautín were delivered for exploitation. Circuit 2 was delivered for exploitation on Monday, September 2. - On Sunday, September 1, ATR-8 of 500/220 kv, 750 MVA at Charrúa Sub- Station, owned by Transelec S.A. was Letter from the Directors of Operations (I) and Tolls (I) 5

8 CDEC-SIC Operation Statistics The implementation of the new SCADA continued during the year, with the connection of Coordinates to the Main Data Center almost ended with the performance of the connectivity and point-to-point tests delivered for exploitation. - On Sunday, September 29, Rahue Sub- Station of 220 kv, owned by Transelec S.A. was delivered for exploitation. - On Sunday, December 1, the 220 kv system to Isla de Chiloé, Melipulli-Chiloé transformer 220/110 kv and Chiloé Sub-Station 220 kv to Isla de Chiloé (transmission line) was delivered for exploitation. - On Friday, December 13, the CER equipment at Cardones Sub-Station +100/- 160 MVAR, owned by Transelec S.A. was delivered for exploitation. Regarding supervision and monitoring of the electric operation system, the implementation of the new SCADA continued during the year, with the connection of Coordinates to the Main Data Center almost ended with the performance of the connectivity and pointto-point tests, and starting the activities to incorporate Coordinates to the Back-up Data Center. During May and June, FAT tests of the project s Phase 2 were carried out (EMS-OTS Applications and other special developments) in Houston, USA, and progress was made to unify SCADA data bases and applications of the Network Manager version. During October the back-up systems (CCC) were transferred to Chile, as well as those of operators training (OTS) and development (PDS), with their installation and configuration process ending in December. At the end of the year the localization of the alternate CDC was defined, and preparation works started by contractor, including equipment and communication ways; these works should be finalized during Regarding the system security issues, during 2013 progress was made in the project to implement the Defense Plan against Extreme Contingencies, designed in its Phase 1 and 3 to deal with the failure and disengagement from the double circuit line Quillota Polpaico 220 kv, as well as the failure and disengagement from the San Luis Quillota 220 kv line respectively; and in its Phase 2, to face the failure and loss from the link Charrúa Ancoa 500 kv which also considers EDAC implementation as per frequency gradient at the facilities of coordinate companies. During the year were signed the contract with the awarded companies, starting up the implementation process. On the other hand, an Operation Study of the SIC s Northern Zone was carried out, with a span from 2014 to 2017, which proposes and automatic squeme to increase transfers from North to South, incorporating the eolic and solar ERNC projects intended to be connected to the SIC during With this it is expected to support better the ERNC s incorporation ERNC s and its characteristics, as well as the operation of a transmission system under congestions. On the other hand, improvements were made to the planning model for the mid and long term operation currently in use at the CDEC- SIC. Such improvements are oriented to the stability, parallel processing and convergence of PLP model, to the modelling of demand blocks and the representation of irrigation agreements with the corresponding reservoir management. Within the DP scope of action, at the beginning of the year the implementation of the SIC s Technical Information Data Base was finalized, and companies were supported in the process that allows them to directly complete the technical information required by the NTSyCS in such platform. In addition, as from April 1st the use of the new platform will be announced to Coordinates with the purpose of determining real marginal costs of the system thus making its calculation more efficient, with the possibility of questioning it by interested parties through our web page. In July, within the framework of the review process for the Trunk Transmission System expansion and the proposals to be issued by the DP, the National Energy Commission requested to incorporate in such proposal information on the improvements to be made at the sub-stations with the greater impact on the system. Accordingly, in August the selected company was instructed to proceed with the SIC SS/EE analysis and improvement study, where Alto Jahuel, Chena, Diego de Almagro and Charrúa SS/EEs were included. In October preliminary reports had been received corresponding to stage B of the study for each sub-station, and in November supplementary information was received. In December reports associated to the project s C stage were in progress, and finalization of the project is expected during the first quarter of Regarding the annual review of the Trunk Transmission System expansion plan corresponding to 2013, it was submitted in 6

9 October to the CNE, recommending among other works: Line 2x500 kv Pichirropulli Puerto Montt, energized with 220 kv; laying of the second circuit of Cardones - Diego de Almagro 2x220 kv line; Ibis conductor change with Grosbeak at the Loncoche - Valdivia 1x220 kv section; complete sectioning at Rahue Substation, Maitencillo Cardones 1x220 kv line amendment and capacity increase at Lo Aguirre Cerro Navia 2x220 kv section. On the other hand, regarding international biddings to be conducted by the DP for the new works of the Trunk Transmission System, during 2013 the works included in Decrees 82/2012 were granted: Ancoa Second Transformer 500/220 kv to Transelec S.A. and the New Lines 1x220 kv A. Melipilla - Rapel and 2x220 kv Lo Aguirre A. Melipilla, with the laying of one circuit, to Consorcio Saesa- Chilquinta. During this process no bids were received for the project 2x220 kv New Line Lo Aguirre Cerro Navia, consequently this process was declared null and void. In addition, during 2013 the process to grant the works contained in Decree 310/2013 was started: Autotransformers Sub-Stations Bank Nueva Cardones, Nueva Maitencillo and Nueva Pan de Azúcar, each of 500/220 kv, 750 MVA, and Third Autotransformers Bank 500/220 kv, of 750 MVA, at Alto Jahuel Sub-station, and the New Line 2x220 kv Lo Aguirre - Cerro Navia, of the Decree 82/2012 process which was declared null and void. All these works shall be granted during As per Sub-transmission Tolls, payment calculations were implemented in April as established in Decree Nº 14/2012 for Sub-transmission. In this process new methodologies were applied, such as to determine the corresponding Income Distribution Factors (FDI), distribution of rates and real losses, and the assignment of rates income. Given the complexity of such calculations, during this term calculation exercises were carried out which were submitted for comments to coordinated companies and meetings were carried out with the purpose of answering inquiries regarding their application. Towards the end of the year, the first payment calculation was published in November, corresponding to September 2013, consequently as of that date calculations are being issued so that companies can make corresponding payments. In the permanent search to facilitate the relationship and communication with stakeholders, in September we participated in an energy emergency simulation exercise developed by the Ministry of Energy and, at the end of the year, in October, conferences were developed related to application criteria for the Service Recovery Plans (PRS) by the head of CDC, together with the Operations Director (I). Such conferences were performed at Osorno, Concepción, Santiago and La Serena. Finally, on December 9 and 10 the Operations and Tolls Directions carried out the first technical seminar addressed to people responsible for communication between the companies and the Technical Offices of DO and DP from the member companies of this CDEC. On such occasion subjects related to Annual Review of the Trunk Transmission, Operational Studies at the CDEC-SIC, Operation Planning at the CDEC SIC and SSCC and its Procedures Regulation were introduced. As it may be noticed, our work has been intense. Contributing to the CDEC-SIC s management during 2013, with the support of its Board of Directors and the entire staff that professionally works at this company, it is a great satisfaction and at the same time an incentive to contribute with our effort so this CDEC is permanently a responsible, independent and successful organization in compliance of its duties. Regarding the Technical Audits to be carried out by the DP for the follow-up of the new trunk works, this year the ones corresponding to projects: New Line 2x220 Ciruelos- Pichirropulli: 1st circuit laying, New Line Cardones-Diego de Almagro: 1st circuit laying, CER installation at Cardones Substation and Lo Aguirre Sectioning Sub- Station were granted to ABSG Consulting. With this granting, a total 9 Technical Audits are currently in progress. Rodrigo Barbagelata S. Ernesto Huber J. Tolls Director (I) Operations Director (I) Letter from the Directors of Operations (I) and Tolls (I) 7

10 CDEC-SIC Operation Statistics

11 INTRODUCTION The Central Interconnected System of the Republic of Chile consists of transmission systems and power plants that operate interconnected from the Rada de Paposo in the North (Second Region), to the Isla Grande de Chiloé in the South (Tenth Region) This system is the largest in the four systems that provide electrical energy to the Chilean territory, with an installed capacity as of December 31, 2013 of 14,147.0 MW, and a supply coverage that reaches about 92.2 percent of the population. The Interconnected System of the Big North Region (SING) also functions along with the SIC in Chile as well as the Electrical System of Aysen and Magallanes for which the following summary statistics and most relevant aspects are shown. Introducción Introduction 9

12 National Statistics Systems (CONTINENTAL CHILE) Annual statistical table on energy production and peak demand, per system. System Gross Power 2013 Maximum Thermal Hydraulic Wind Solar Total Demand (GWh) (GWh) (GWh) (GWh) (GWh) (MW) SING 14, , ,226.0 SIC 30, , , ,281.8 AYSÉN MAGALLANES * Total 45, , ,466.4 Annual statistics table for an installation power system, according to the fuel type, at December 31, System Coal (MW) Oil (MW) Thermal Installed power according to the type of fuel Gas (MW) Others (MW) Hydraulic Run of the rivers (MW) SING 2, , SIC 2, , , , , AYSÉN MAGALLANES * Total 4, , , , , Dam (MW) Wind (MW) Solar (MW) System Thermal (MW) Total Installed Power Hydraulic (MW) SING 4, ,607.2 SIC 7, , ,147.0 AYSÉN MAGALLANES * Total 12, , ,900.2 Wins (MW) Solar (MW) System (MW) Annual statistical Electric System table of sales and coverage, at December 31, System Regulated (GWh) Customer Sales Population Coverage Industrials Total Sales (GWh) (GWh) Population % SING 1, , , ,054, % SIC 33, , , ,424, % AYSÉN , % MAGALLANES * , % Total 35, , , ,738, % * Represents the consolidate information of the three subsystems that make up the Magallanes System (Punta Arenas, Puerto Natales and Puerto Porvenir Subsystems). CDEC-SIC Operation Statistics

13 The following national map summarizes the most relevant statistics of each electric system. SING Northern Interconnected System Installed Power: 4,607 MW Annual Production: 14,101 GWh Highest Value of Demand: 2,226 MW Sales: 15,414 GWh Population: 6.30% SIC Central Interconnected System Installed Power: 14,147 MW Annual Production: 50,939 GWh Highest Value of Demand: 7,282 MW Sales: 47,777 GWh Population: 92.15% Aysén System Aysén System Installed Power: 44 MW Annual Production: 137 GWh Highest Value of Demand: 22 MW Sales: 118 GWh Population: 0.59% Magallanes System Magallanes System Installed Power: 102 MW Annual Production: 291 GWh Highest Value of Demand: 51 MW Sales: 266 GWh Population: 0.96% Introduction 11

14 This publication aims at summarizing the statistical information related to the operation of the Central Interconnected System, ordered by the Center for Economic Load Dispatch Central Interconnected System, CDEC-SIC and covers the last ten years of statistics, i.e., from 2004 to 2013, inclusive. The information presented includes the most relevant statistics of the operation as well as public values such as inflation rate, parity exchange rate, fuel price and other variables that affect, among other things, the decisions of operation in the Central Interconnected System. For a better analysis the information has been divided into six chapters, i.e. FIRST CHAPTER Shows the background to the founding of the CDEC-SIC, the corresponding legal framework and the functions assigned to it. SECOND CHAPTER Includes information on the facilities of the various Power plants and transmitters, such as power and voltages, years of service and length of lines. THIRD CHAPTER It refers to the operation of the system during the term It shows the changing demands and gross sales of the SIC and how they were supplied by different companies and plants involved. It shows the courses of the reservoirs of the Central Interconnected System resulting from the decisions of operation to minimize costs of supply, taking into account the hydrological conditions prevailing in each opportunity. Also included is the annual consumption of fuels per power plant. FOURTH CHAPTER It is dedicated to describe in particular the relevant aspects of the operation of the Central Interconnected System during We discuss criteria for planning the operation, the hydrological conditions of operation and the decisions made. FIFTH CHAPTER It summarizes the transfers between companies and includes an annual review of energy and power. It also shows the use of transmission system by calculating the payment of tolls and of the Unique Expected Annual Charges for end users. SIXTH CHAPTER It is about economic background used by the CDEC-SIC. It includes a history of inflation, parity exchange rate, fuel prices and monthly marginal average costs of SIC. CDEC-SIC Operation Statistics

15 CDEC-SIC STRUCTURE On May 31, 1999 the CDEC-SIC limited partnership was created, and structured according to the guidelines of Supreme Decree D.S. 327/97, with a Board of Directors formed by representatives from each of the 12 companies that were at the time members of the CDEC-SIC, an Operations Direction and a Tolls Direction. Following the publication in 2007 of DS 291/2007 of the Ministry of Economy, Development and Reconstruction which establishes the Structure, Function and Financing of CDECs, enacted in October 2009, a Administration and Budget Direction was created and the Board of Directors composition was amended to consist solely of 10 representatives corresponding to the 5 member segments as defined by said decree. Afterwards, in August 2013, Decree 115/2012 was enacted which introduced amendments to DS 291/2007, incorporating to the CDEC a Planning and Development Direction, and amending as of 2014 the Board of Directors composition by decreasing the number of Directors to 5 members and 5 alternates, each segment electing its representative from three selected candidates proposed for a specialized company retained for this purpose. The selected candidates for Director and Alternate of each segment must comply with the compatibility conditions as established in such Decree. Consequently, as of December 31, 2013, the CDEC-SIC structure was as follows: BOARD OF DIRECTORS CDEC-SIC Secretariat Communications Area Regulation & Technical Comptrollership Area Operations Direction Tolls Direction Planning & Development Direction Administration & Budget Direction Dispatch & Control Center Tolls Department Administration Department Operations Department Studies Department Information Technology Department Operations Planning Department Transfers Department Human Resources Electric Systems Studies Department Introduction 13

16 As of December 31, The Board of the CDEC-SIC is integrated by the following members: Segment Regular Director Alternate Director First Segment Juán Carlos Olmedo H. (19) Jean Descazeaux A. (13) First Segment Luis Núñez H. (16) Soledad Salas M. (12) Second Segment Leonardo Bastidas A. (15) Juan Salinas U. (14) Second Segment Carlos Aguirre P. (11) Juán Pablo Cárdenas P. (6) Second Segment Humberto Espejo P. (2) Osvaldo Muñoz D. (17) Third Segment Rodrigo López V. (18) Jaime Cancino C. (3) Third Segment Raúl Valpuesta A. (1) Belisario Maldonado M. Fourth Segment Carlos Ducasse R. (10) Marcelo Bobadilla M. (9) Fourth Segment Mauricio Dinamarca C. (5) Mauricio Camposano I. (4) Fifth Segment Juán Cembrano P. (7) Andy García C. (8) First Segment: Correspond to the Power Plants owners whose total installed capacity is below 300 MW. Second Segment: Correspond to the owners of the power plants whose total installed capacity is equal to or grater than 300 MW. Third Segment: Correspond to the owners of the transmission trunk installations. Fourth Segment: Correspond to the owners of the subtransmissions installations. Fifth Segment: Correspond to the customers that receive supply directly from a transmission system CDEC-SIC Operation Statistics

17 The Board of Directors of the CDEC-SIC is joined by: CDEC-SIC Ltda. Executive Director (A) Ernesto Huber J. Director of Operations (I) Ernesto Huber J. Tolls Director (I) Rodrigo Barbagelata S. Administration and Budget Director (I) Ignacio Hidalgo P. Operations Assistant Director Ernesto Huber J. Tolls and Transfers Assistant Director Rodrigo Barbagelata S. Regulation and Technical Comptrollership Deputy Manager Jaime Misraji C. Dispatch and Control Center Manager Ricardo Pacheco M. Operations Department Manager Sergio Díaz C. Operations Planning Department Manager Juán Marco Donoso N. Electric Systems Studies Department Manager José Miguel Castellanos I. Tolls Department Manager Aníbal Ramos R. Studies Department Manager Deninson Fuentes D. Administration Department Manager Ignacio Hidalgo P. Information Technologies Department Manager Álvaro Navarro M. Human Resources Manager Sebastián Benavente N. Introduction 15

18 Corporate Definitions Corporate definitions are meant to be a model to increase management, ethical and transparence standards during the internal decision making process of the CDEC-SIC, taking into account the compliance with the objectives established for the organization by the Electric Services General Law. CDEC-SIC Operation Statistics Vision Our efforts are oriented towards becoming a model of excellence; independent, impartial, transparent and proactive for the safe and efficient management of the SIC, applying the industry s best practices at a global level and making a contribution to the integral development of its coordinates. Mission Our mission is based on operating the SIC in a safe manner and at the lower possible cost, guaranteeing open access to the transmission system, contributing to the country s development through the efficient fulfillment of the role assigned by the legislation in force. Values Values that are the pillars of our function are based on aspects related to: Integrity: We are honest, ethical and reliable in the internal interaction and with our stakeholders, reflecting the highest professional standards of our organization. Respect: Beyond compliance with the standards and the functions derived from them towards our professionals, member companies, authorities and the community in general, we take into account their points of view, their needs and opinions. Service: We offer unbiased collaboration when complying with our mission from the smallest details to the solution of important contingencies, showing our high sense of collaboration to make life easier to the fellow citizens. Our right intention and the awareness of our role will always be the basis to live according to this value. Equity: Understood as the fair and balanced treatment in the compliance with our functions and with respect to our professionals and the entire community.

19 2013 Management In addition to comply with all the aspects required by the Regulations and standards, the Technical Offices of the CDEC-SIC carried out several activities during 2013 aimed to reinforce aspects allowing for a better action within the electric market and all its participants. REGULATORY AREA - Preparation of the procedures on Supplementary Services as required in DS 130/ Preparation of the procedures on Development of Technical Audits, Calculation and Determination of Energy Economic Transfers and Measurement Systems for Economic Transfers. - Participation in discrepancies submitted to the consideration of the Experts Panel by the member companies, referred to in the procedures Statement of equipment costs for rendering SSCC, SSCC Remuneration and Calculation and Determination of Energy Economic Transfers. - Issue of the studies required by the Technical Standard, together with the report on comments and remarks to the draft proposed by the CNE for the new version of the NTSyCS. OPERATIONAL AREA - Progress in the implementation of the new SCADA for the CDEC-SIC, which contemplated carrying out connectivity and point-to-point tests with coordinates; enabling the back-up Data Center; signature of FAT tests for Phase 2 in the USA; installation and configuration of back-up systems (CCC), operators training (OTS) and development (PDS), developing training courses for users of the new system. - Start-up of implementation works for CDC alternate facilities, their equipment and communications. - Start-up of implementation process for the Defense Plan against Extreme Contingencies, designed in its Phase 1 and 3 to service the failure and disengagement of Quillota Polpaico 220 kv double-circuit line, as well as the failure and disengagement of San Luis Quillota 220 kv line respectively; and in its Phase 2, to face the failure and loss of the link Charrúa Ancoa 500 kv (failure in both circuits or in 220/500 kv transformations) which also consider the implementation of EDAC as per frequency slope at the facilities of coordinate companies. - Start-up of improvements implementation to the operation planning model in the mid and long term currently in use at the CDEC-SIC (PLP model). Such improvements are oriented to figures stability and parallel processing, together with the modelling of demand blocks and representation of risk agreements with the management of the corresponding dams. - Development of Operation Study for the SIC s Northern Zone (years 2014 to 2017), with an automation proposal to increase transfers from North to South, incorporating ERNC eolic and solar projects which connection to the SIC is estimated in INVOICING AND TOLLS AREA - Start-up of the Invoicing Measurement centralization project, in order to gain direct access to the information available in the measurement equipment installed in the system. - Granting of the works contained in Decree 82/2012, and start-up of the granting process of the works contained in Decree 310/2013 (international biddings). - Development of the new Sub-transmission Tolls calculation methodologies, according to Decree N 14/ Within the framework of the review process of the Trunk Transmission System expansion, the DP carried out the SIC s Sub-stations analysis and improvements study. - Assigning new Technical Audits for trunk works in progress, amounting as of December 2013 to a total 9 audit processes in progress. Introduction 17

20 Public Relations Activities VISIT TO ENERGY COMMISSION OF THE SENATE The CDEC-SIC Operations and Tolls Interim Directors attended a meeting with the Senate s Mining and Energy Commission at the end of last year in order to express their opinion on the SIC and SING Interconnection Law project. On that opportunity, they explained that if included in the trunk expansion plan, an eventual interconnection should go through an assessment process of its technical and economic convenience. CDEC-SIC PARTICIPATED AT IMPORTANT ENERGY EVENTS Integration Commission (CIER), was attended by the Operations Director (I) and by an engineer from the Regulation and Technical Comptrollership s Office. CDEC-SIC Operation Statistics Participation at events related to the energy area, both in Chile and abroad was an outstanding characteristic of the CDEC-SIC s public agenda during On July 2 and 3, for example, Concepción city, the capital of Bío- Bío Region witnessed the first version of the Electricity Forum of the South (FOROSIC 2013), an event sponsored by the CDEC-SIC, as well as a conference by the Operations Director (I). Later, and with the attendance of the top executives from the main electric system operators of Latin America, on September 23 to 25 the International Congress on Energy Systems and Markets Operation was held at Medellín, Colombia, which main subject was: Current and Future Challenges in the SEPs Operation. This gathering, organized by the Regional Energy On October 29, the seminar Challenges of the Modern Electric Systems organized by CONECTA company was held, where the CDEC-SIC s Interim Operations Director participated with the conference: Challenges of Chile s Central Interconnected System operation coordination. It is worth noting that Dr. Vahid Madani, currently Director of the Smart Grid Initiative of Pacific, Gas and Electric (PG&E), nominated IEEE Fellow in acknowledgment of his innovation and leadership in technologies to protect power electric systems and control technologies for wide spectrum monitoring systems participated at this seminar. Continuing with this process of corporate promotion, on November 11 the Operations Director (I) participated at one of the panels of the Sixth version of the International Biennial Congress Cost Variability in the Electric supply, carried out by the CIGRE s Chilean Committee, where the electricity high costs in the local market issue and its causes, consequences in the productive sectors and possible solutions were discussed. The year ended with the attendance to the 2nd International Exhibition and the IX Round of Business for Atacama Region ATEXPO 2013 (from November 12 to 15), opportunity where the regional energy scenario was approached. On this occasion, our DO (I) made a presentation on the Challenges of the SIC s Operation Coordination.

Subdirección de Desarrollo de Proyectos. March 2012

Subdirección de Desarrollo de Proyectos. March 2012 S March 2012 CFE is Comisión Federal de Electricidad (CFE) is a public & decentralized agency, with legal personality and properties, created in 1937 due to a Presidential decree. CFE generates, transmits,

Más detalles

ACTIVITIES 2014 CHILEAN MINING COMMISSION

ACTIVITIES 2014 CHILEAN MINING COMMISSION ACTIVITIES 2014 CHILEAN MINING COMMISSION Santiago, June 2014 Overview Introduction Organizations Main Events - year 2014 Some Details Constitution of the Board The current Board is constituted, composed

Más detalles

Juan José Barrera Cerezal Managing Director on Social Economy, Self- Employment and CSR

Juan José Barrera Cerezal Managing Director on Social Economy, Self- Employment and CSR Juan José Barrera Cerezal Managing Director on Social Economy, Self- Employment and CSR 1 SUSTAINABLE ECONOMY LAW Articles 1 and 2 of the Law The importance of the Law for promoting CSR in Spain Purpose

Más detalles

SAFETY ROAD SHOW 2015 Paul Teboul Co Chairman HST México

SAFETY ROAD SHOW 2015 Paul Teboul Co Chairman HST México SAFETY ROAD SHOW 2015 Paul Teboul Co Chairman HST México How did started the Safety Road Show? Airbus Helicopters and others manufacturers did invest since a long time in improving Aviation Safety. In

Más detalles

Comité de usuarios de la RES

Comité de usuarios de la RES Comité de usuarios de la RES Jordi Torra CURES Comité de usuarios de la RES (CURES) - Las grandes infraestructuras nacionales e internacionales tienen Comité de Usuarios - Es una obligación para las ICTS

Más detalles

PROGRAMA. Operaciones de Banca y Bolsa SYLLABUS BANKING AND STOCK MARKET OPERATIONS

PROGRAMA. Operaciones de Banca y Bolsa SYLLABUS BANKING AND STOCK MARKET OPERATIONS PROGRAMA 4º Curso. Grado en Administración y Dirección SYLLABUS BANKING AND STOCK MARKET OPERATIONS 4 rd year. Pág. 1 / 8 Colegio Universitario de Estudios Financieros Leonardo Prieto Castro, 2 Tel. +34

Más detalles

Chapter Six. Sanitary and Phytosanitary Measures

Chapter Six. Sanitary and Phytosanitary Measures Chapter Six Sanitary and Phytosanitary Measures Objectives The objectives of this Chapter are to protect human, animal, or plant life or health in the Parties territories, enhance the Parties implementation

Más detalles

Managment Voucher EPI 2010-2015

Managment Voucher EPI 2010-2015 Managment Voucher EPI 2010-2015 Management voucher: What for? It is one of the ini,a,ves gathered in the innova&on axis of the EPI 2010-2015 (Axis 2 Line 2.3) To innovate is something else than launching

Más detalles

LAC-2009-09 Modificación 2.3.3.3. DIRECT ALLOCATIONS TO ISPs DISTRIBUCIONES INICIALES A ISPs

LAC-2009-09 Modificación 2.3.3.3. DIRECT ALLOCATIONS TO ISPs DISTRIBUCIONES INICIALES A ISPs LAC-2009-09 Modificación 2.3.3.3 DIRECT ALLOCATIONS TO ISPs DISTRIBUCIONES INICIALES A ISPs Current Policy 2.3.3.3. Direct Allocations to Internet Service Providers LACNIC may grant this type of allocation

Más detalles

Annex 8 referred to in Chapter 7 Activities Reserved to the State. Schedule of Mexico. Section 1 Activities Reserved to the Mexican State

Annex 8 referred to in Chapter 7 Activities Reserved to the State. Schedule of Mexico. Section 1 Activities Reserved to the Mexican State Annex 8 referred to in Chapter 7 Activities Reserved to the State Schedule of Mexico Section 1 Activities Reserved to the Mexican State Mexico reserves the right to perform exclusively, and to refuse to

Más detalles

ESCUELA POLITECNICA NACIONAL INSTITUTO GEOFISICO

ESCUELA POLITECNICA NACIONAL INSTITUTO GEOFISICO IG-35 Quito, September 2, 25 Dr. Domenico Giardini FDSN Chair This letter is to express our official interest in joining the Federation of Digital Seismograph Networks (FDSN) and to present a brief description

Más detalles

OSH: Integrated from school to work.

OSH: Integrated from school to work. SST: Integrada desde la escuela hasta el empleo. OSH: Integrated from school to work. ESPAÑA - SPAIN Mª Mercedes Tejedor Aibar José Luis Castellá López Instituto Nacional de Seguridad e Higiene en el Trabajo

Más detalles

ARIS Solution for Governance, Risk & Compliance Management. Ensure Business Compliance

ARIS Solution for Governance, Risk & Compliance Management. Ensure Business Compliance ARIS Solution for Governance, Risk & Compliance Management Ensure Business Compliance El exito en la implementacion de GRC consiste en mantener el balance correcto 7 June 2012 Software AG - Get There Faster

Más detalles

ANNUAL PERFORMANCE EVALUATION OF PROJECT RLA/09/801. (Presented by the Secretariat) EXECUTIVE SUMMARY

ANNUAL PERFORMANCE EVALUATION OF PROJECT RLA/09/801. (Presented by the Secretariat) EXECUTIVE SUMMARY 06/05/15 Fourteenth Directors of Civil Aviation of the Central Caribbean Meeting (C/CAR/DCA/14) Kingston, Jamaica, 11 to 13 May 2015 Agenda Item 5 Fourth Steering Committee Meeting of the RLA/09/801 Technical

Más detalles

Este proyecto tiene como finalidad la creación de una aplicación para la gestión y explotación de los teléfonos de los empleados de una gran compañía.

Este proyecto tiene como finalidad la creación de una aplicación para la gestión y explotación de los teléfonos de los empleados de una gran compañía. SISTEMA DE GESTIÓN DE MÓVILES Autor: Holgado Oca, Luis Miguel. Director: Mañueco, MªLuisa. Entidad Colaboradora: Eli & Lilly Company. RESUMEN DEL PROYECTO Este proyecto tiene como finalidad la creación

Más detalles

RED IT4ALL PLAN DE ACTIVIDADES PARA 2009-2010 IT4ALL NETWORK PLAN OF ACTIVITIES FOR 2009-2010

RED IT4ALL PLAN DE ACTIVIDADES PARA 2009-2010 IT4ALL NETWORK PLAN OF ACTIVITIES FOR 2009-2010 RED IT4ALL PLAN DE ACTIVIDADES PARA 2009-2010 IT4ALL NETWORK PLAN OF ACTIVITIES FOR 2009-2010 SEPTEMBER- 2008 1. PLAN DE ACTIVIDADES 2009-2010 A continuación se desglosan el plan de actividades que la

Más detalles

TRABAJO EN EQUIPO MOZ/BRAZIL

TRABAJO EN EQUIPO MOZ/BRAZIL TALLER LATINOAMERICANO DE EVALUACIÓN DE IMPACTO TRABAJO EN EQUIPO MOZ/BRAZIL Team: Magalhães Miguel David Rocha Elias Machava Support: Christian Borja Matt Freeman Equipo 3 WASIS II 20 de Marzo de 2015

Más detalles

Annex III Schedule of Mexico

Annex III Schedule of Mexico Annex III Schedule of Mexico Section A. Activities Reserved to the Mexican State Mexico reserves the right to perform exclusively, and to refuse to permit the establishment of investments in, the following

Más detalles

CETaqua, a model of collaborative R&D, an example of corporate innovation evolution

CETaqua, a model of collaborative R&D, an example of corporate innovation evolution CETaqua, a model of collaborative R&D, an example of corporate innovation evolution CETaqua: manage projects, create value Tomas Michel General Manager, CETaqua September 2011 1. AGBAR: R&D indicators

Más detalles

Seminario de Electrónica Industrial

Seminario de Electrónica Industrial Elena Villanueva Méndez Parques eólicos y conexión a la red. Valparaíso, Junio de 2010 Parques eólicos Altas demandas dinámicas: Control de frecuencia y voltaje Control de potencia activa y reactiva Respuesta

Más detalles

Descripción de contenidos del E-FORM Capítulo Proyectos de cooperación europea

Descripción de contenidos del E-FORM Capítulo Proyectos de cooperación europea Descripción de contenidos del E-FORM Capítulo Proyectos de cooperación europea DOCUMENTO NO VÁLIDO PARA PRESENTAR LA SOLICITUD* *Documento-resumen del formulario online (eform) de la 2ª convocatoria de

Más detalles

LAC-2009-09 Modificación 2.3.3.3. DIRECT ALLOCATIONS TO ISPs DISTRIBUCIONES DIRECTAS A ISPs

LAC-2009-09 Modificación 2.3.3.3. DIRECT ALLOCATIONS TO ISPs DISTRIBUCIONES DIRECTAS A ISPs LAC-2009-09 Modificación 2.3.3.3 DIRECT ALLOCATIONS TO ISPs DISTRIBUCIONES DIRECTAS A ISPs Current Policy Política Actual 2.3.3.3. Direct Allocations to Internet Service Providers LACNIC may grant this

Más detalles

Centro Andaluz de Innovación y Tecnologías de la Información y las Comunicaciones - CITIC

Centro Andaluz de Innovación y Tecnologías de la Información y las Comunicaciones - CITIC Centro Andaluz de Innovación y Tecnologías de la Información y las Comunicaciones - CITIC (Andalusian Centre of Innovation and Information and Communication technologies- CITIC) FP7-ENERGY: Oportunidades

Más detalles

http://mvision.madrid.org

http://mvision.madrid.org Apoyando el desarrollo de carrera de investigadores en imagen biomédica Supporting career development of researchers in biomedical imaging QUÉ ES M+VISION? WHAT IS M+VISION? M+VISION es un programa creado

Más detalles

RTD SUPPORT TO AERONAUTICS IN SPAIN

RTD SUPPORT TO AERONAUTICS IN SPAIN RTD SUPPORT TO AERONAUTICS IN SPAIN Juan Francisco Reyes Sánchez International Programmes Bonn, 11 st December 2013 Index 1. CDTI 2. RTDI funding 3. CDTI support to aeronautics R&D 1. CDTI Center for Industrial

Más detalles

FCC Information : Warning: RF warning statement:

FCC Information : Warning: RF warning statement: FCC Information : This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) This device must

Más detalles

Servicio al Cliente Customer Service

Servicio al Cliente Customer Service Servicio al Cliente Customer Service La Gerencia de Servicios al Cliente es la encargada de velar por la atención directa que el BMI brinda a los usuarios finales. Dentro de dicha Gerencia se gestiona

Más detalles

Final Project (academic investigation)

Final Project (academic investigation) Final Project (academic investigation) MÁSTER UNIVERSITARIO EN BANCA Y FINANZAS (Finance & Banking) Universidad de Alcalá Curso Académico 2015/16 GUÍA DOCENTE Nombre de la asignatura: Final Project (academic

Más detalles

LA FIRMA THE FIRM QUIENES SOMOS ABOUT US

LA FIRMA THE FIRM QUIENES SOMOS ABOUT US LA FIRMA THE FIRM QUIENES SOMOS Somos una firma de abogados especialistas en derecho laboral, comercial y administrativo que entrega a sus clientes su conocimiento y experiencia de manera eficiente, oportuna

Más detalles

UNIVERSIDAD INCA GARCILASO DE LA VEGA

UNIVERSIDAD INCA GARCILASO DE LA VEGA UNIVERSIDAD INCA GARCILASO DE LA VEGA ESCUELA DE POSGRADO MAESTRIA EN GESTION Y CONTROL GUBERNAMENTAL TRABAJO DE INVESTIGACION LA GESTION DEL TALENTO HUMANO Y EL DESEMPEÑO DE LOS TRABAJADORES DE LAS MEDIANAS

Más detalles

EQUIPAMIENTO ELECTROMECANICO DE UNA CENTRAL MINI-HIDROELÉCTRICA

EQUIPAMIENTO ELECTROMECANICO DE UNA CENTRAL MINI-HIDROELÉCTRICA Resumen I EQUIPAMIENTO ELECTROMECANICO DE UNA CENTRAL MINI-HIDROELÉCTRICA Autor: Ágreda Chinea, Isabel Director: Madera Sánchez, Alfonso. Entidad Colaboradora: ICAI - Universidad Pontificia Comillas. El

Más detalles

COMPANY PROFILE. February / 2008. Iquique N 112 Fracc. Las Américas Naucalpan de Juárez. C.P. 53040 Edo. de México Tel. 5363-19-73

COMPANY PROFILE. February / 2008. Iquique N 112 Fracc. Las Américas Naucalpan de Juárez. C.P. 53040 Edo. de México Tel. 5363-19-73 COMPANY PROFILE Ubicación de Rios y Zonas de Inundación February / 2008 About us isp is a leading provider of geographic information system services in México. We serve a broad range of customers including

Más detalles

Are you interested in helping to GOVERN the Authority, DEVELOP current and future programs, and APPROVE contracts?

Are you interested in helping to GOVERN the Authority, DEVELOP current and future programs, and APPROVE contracts? Albany Housing Authority RESIDENT COMMISSIONER ELECTION Are you interested in helping to GOVERN the Authority, DEVELOP current and future programs, and APPROVE contracts? RUN FOR RESIDENT COMMISSIONER

Más detalles

PEMEX E&P South Region OMC 2015

PEMEX E&P South Region OMC 2015 PEMEX E&P South Region OMC 2015 Austin, TX. USA Por: Mario Alejandro Mosqueda Thompson (PEMEX) Juan D. Osorio Monsalve (OVS GROUP MEXICO) The system is based on integrating databases and capture of different

Más detalles

MAIN BACKGROUND OF THE EARLY WARNING SYSTEM ON NEW PSYCHOACTIVE SUBSTANCES - CHILE

MAIN BACKGROUND OF THE EARLY WARNING SYSTEM ON NEW PSYCHOACTIVE SUBSTANCES - CHILE MAIN BACKGROUND OF THE EARLY WARNING SYSTEM ON NEW PSYCHOACTIVE SUBSTANCES - CHILE November 2017 Early warning system on new psychoactive substances Background prior to the creation of the EWS New substances

Más detalles

International Civil Aviation Organization UPDATE TO THE NOTAM CONTINGENCY PLAN. (Presented by the Secretariat) SUMMARY

International Civil Aviation Organization UPDATE TO THE NOTAM CONTINGENCY PLAN. (Presented by the Secretariat) SUMMARY International Civil Aviation Organization SAM/AIM/5-WP/06 South American Regional Office 10/07/13 Fifth Multilateral Meeting of the SAM Region for the Transition of AIS to AIM (SAM/AIM/5) (Lima, Peru,

Más detalles

Certificado de Asistente de Oficina

Certificado de Asistente de Oficina Certificado de Asistente de Oficina Los estudiantes interesados en obtener este Certificado deben cumplir con los siguientes requisitos: Ser estudiante activo en la Facultad de Administración de Empresas,

Más detalles

Facilities and manufacturing

Facilities and manufacturing Facilities and manufacturing diseño y producción design and production Roomdimensions Ibérica,s.l (RDI) es una empresa experta en la fabricación de mobiliario técnico, diseño integral de soluciones arquitectónicas

Más detalles

UNIVERSIDAD NACIONAL MAYOR DE SAN MARCOS UNIDAD DE POSTGRADO DE INGENIERÍA DE SISTEMAS E INFORMATICA

UNIVERSIDAD NACIONAL MAYOR DE SAN MARCOS UNIDAD DE POSTGRADO DE INGENIERÍA DE SISTEMAS E INFORMATICA UNIVERSIDAD NACIONAL MAYOR DE SAN MARCOS UNIDAD DE POSTGRADO DE INGENIERÍA DE SISTEMAS E INFORMATICA DISEÑO E IMPLEMENTACIÓN DE UNA OFICINA DE GESTION DE PROYECTOS PARA LA POSITIVA SEGUROS Informe Profesional

Más detalles

ENVIRONMENTAL COOPERATION. Border Area TREATIES AND OTHER INTERNATIONAL ACTS SERIES 12-1128. Agreement Between the UNITED STATES OF AMERICA and MEXICO

ENVIRONMENTAL COOPERATION. Border Area TREATIES AND OTHER INTERNATIONAL ACTS SERIES 12-1128. Agreement Between the UNITED STATES OF AMERICA and MEXICO TREATIES AND OTHER INTERNATIONAL ACTS SERIES 12-1128 ENVIRONMENTAL COOPERATION Border Area Agreement Between the UNITED STATES OF AMERICA and MEXICO Amending the Agreement of August 14, 1983 Effected by

Más detalles

RDA in BNE. Mar Hernández Agustí Technical Process Department Manager Biblioteca Nacional de España

RDA in BNE. Mar Hernández Agustí Technical Process Department Manager Biblioteca Nacional de España RDA in BNE Mar Hernández Agustí Technical Process Department Manager Biblioteca Nacional de España RDA at the National Library of Spain: BNE preparation for new Cataloguing Rules Since 2007 BNE has been

Más detalles

PUESTA EN MARCHA PROYECTO SERVICIOS DE VISACIÓN ELECTRÓNICA [SVEl

PUESTA EN MARCHA PROYECTO SERVICIOS DE VISACIÓN ELECTRÓNICA [SVEl 010 GERENCIA DE OPERACIONES CIRCULAR N 8 Z ^, 05 de noviembre de 2010 DE : GERENTE DE OPERACIONES DE ZONA FRANCA DE S.A. A REF : SEÑORES USUARIOS ZONA FRANCA DE PUESTA EN MARCHA PROYECTO SERVICIOS DE VISACIÓN

Más detalles

Postgrados Gestión Cultural

Postgrados Gestión Cultural Postgrados Gestión Cultural Facultad de Humanidades Postgrado en Gestión Cultural Presentación: El gestor cultural es un profesional con un perfil polivalente y multidisciplinar cuyo trabajo se halla en

Más detalles

Agustiniano Ciudad Salitre School Computer Science Support Guide - 2015 Second grade First term

Agustiniano Ciudad Salitre School Computer Science Support Guide - 2015 Second grade First term Agustiniano Ciudad Salitre School Computer Science Support Guide - 2015 Second grade First term UNIDAD TEMATICA: INTERFAZ DE WINDOWS LOGRO: Reconoce la interfaz de Windows para ubicar y acceder a los programas,

Más detalles

Facultad de Ingeniería y Computación Escuela Profesional de Ingeniería Industrial

Facultad de Ingeniería y Computación Escuela Profesional de Ingeniería Industrial Facultad de Ingeniería y Computación Escuela Profesional de Ingeniería Industrial Propuesta de implementación de un sistema de gestión de seguridad y salud en el trabajo a una planta de reactivos para

Más detalles

Contents. Introduction. Aims. Software architecture. Tools. Example

Contents. Introduction. Aims. Software architecture. Tools. Example ED@CON Control Results Management Software Control with Remote Sensing Contents Introduction Aims Software architecture Tools Example Introduction Control results management software (Ed@con) is a computer

Más detalles

The date of this call is April 23, 2013. Before we start, let me remind you that this call is property of Wal-Mart de México S.A.B. de C.V.

The date of this call is April 23, 2013. Before we start, let me remind you that this call is property of Wal-Mart de México S.A.B. de C.V. The date of this call is April 23, 2013. Before we start, let me remind you that this call is property of Wal-Mart de México S.A.B. de C.V. and is intended for the use of the company s shareholders and

Más detalles

EN United in diversity EN A8-0204/83. Amendment

EN United in diversity EN A8-0204/83. Amendment 27.6.2018 A8-0204/83 83 Recital 2 (2) So far, and unless otherwise provided for in national law, the rules on access to the occupation of road transport operator do not apply to undertakings engaged in

Más detalles

PROBLEMAS PARA LA CLASE DEL 20 DE FEBRERO DEL 2008

PROBLEMAS PARA LA CLASE DEL 20 DE FEBRERO DEL 2008 PROBLEMAS PARA LA CLASE DEL 20 DE FEBRERO DEL 2008 Problema 1 Marketing estimates that a new instrument for the analysis of soil samples will be very successful, moderately successful, or unsuccessful,

Más detalles

PRESS CLIPPING 20 May 2015 www.proinso.net

PRESS CLIPPING 20 May 2015 www.proinso.net PRESS CLIPPING 20 May 2015 www.proinso.net PROINSO Supplies 3 MW for the Largest Rooftop Solar Installation in Latin America Leading Global PV integrator PROINSO has supplied 3 MW of SMA Sunny Tri Powers

Más detalles

R.B.S. RISK-BASED SUPERVISION SOME REFLECTIONS. Joaquín Melgarejo

R.B.S. RISK-BASED SUPERVISION SOME REFLECTIONS. Joaquín Melgarejo RISK-BASED SUPERVISION R.B.S. SOME REFLECTIONS Joaquín Melgarejo 1 INDEX 1. SUPERVISION ACTIVITY : GOALS 2. CURRENT SITUATION 3. NEW FRAMEWORK. 4. PENSION FUND RISKS: SOME REFLECTIONS 5. RISK BASED SUPERVISION

Más detalles

Regional Action Plan for the Conservation of Mangroves in the Southeast Pacific

Regional Action Plan for the Conservation of Mangroves in the Southeast Pacific Regional Action Plan for the Conservation of Mangroves in the Southeast Pacific Fernando Félix Comisión Permanente del Pacífico Sur CPPS www.cpps-int.org Permanent Commission for the South Pacific - CPPS

Más detalles

PROPIEDAD INDUSTRIAL INDUSTRIAL PROPERTY

PROPIEDAD INDUSTRIAL INDUSTRIAL PROPERTY PROPIEDAD INDUSTRIAL INDUSTRIAL PROPERTY DATOS DE CONTACTO CONTACT DETAILS MADRID Ruth Sanz Almagro, 9 28010 Madrid Tel. 34 915 247 301 Fax 34 915 247 124 ruth.sanz@cuatrecasas.com Enrique Sánchez-Quiñones

Más detalles

Section 6621 of the Internal Revenue Code establishes the interest rates on

Section 6621 of the Internal Revenue Code establishes the interest rates on Part 1 Section 6621.--Determination of Rate of Interest 26 CFR 301.6621-1: Interest rate. Rev. Rul. 2014-29 Section 6621 of the Internal Revenue Code establishes the interest rates on overpayments and

Más detalles

Desarrollo financiero Fondo de Desarrollo Económico Financial development Economic Development Fund

Desarrollo financiero Fondo de Desarrollo Económico Financial development Economic Development Fund Desarrollo financiero Fondo de Desarrollo Económico Financial development Economic Development Fund ESTRUCTURA DE ACTIVOS La estructura de activos del FDE ha presentado cambios en su composición, principalmente

Más detalles

DESARROLLO DE UN SISTEMA INTEGRADO DE GESTIÓN DE PROYECTOS: PLANIFICACIÓN OPERATIVA, PLANIFICACIÓN ECONÓMICA Y PLANIFICACIÓN DE LA EJECUCIÓN.

DESARROLLO DE UN SISTEMA INTEGRADO DE GESTIÓN DE PROYECTOS: PLANIFICACIÓN OPERATIVA, PLANIFICACIÓN ECONÓMICA Y PLANIFICACIÓN DE LA EJECUCIÓN. DESARROLLO DE UN SISTEMA INTEGRADO DE GESTIÓN DE PROYECTOS: PLANIFICACIÓN OPERATIVA, PLANIFICACIÓN ECONÓMICA Y PLANIFICACIÓN DE LA EJECUCIÓN. Autor: Ramírez Vargas, Gema. Director: Muñoz García, Manuel.

Más detalles

REPORT ON THE RESERVE FUND OF THE REGIONAL CONFERENCE ON MIGRATION FOR THE ASSISTED VOLUNTARY RETURN OF HIGHLY VULNERABLE INTRA-REGIONAL MIGRANTS

REPORT ON THE RESERVE FUND OF THE REGIONAL CONFERENCE ON MIGRATION FOR THE ASSISTED VOLUNTARY RETURN OF HIGHLY VULNERABLE INTRA-REGIONAL MIGRANTS REPORT ON THE RESERVE FUND OF THE REGIONAL CONFERENCE ON MIGRATION FOR THE ASSISTED VOLUNTARY RETURN OF HIGHLY VULNERABLE INTRA-REGIONAL MIGRANTS International Organization for Migration Salvador Gutiérrez

Más detalles

SIASAR Information System for Rural Water and Sanitation. WASH Sustainability Forum Amsterdam, June 30, 2014. http://siasar.org

SIASAR Information System for Rural Water and Sanitation. WASH Sustainability Forum Amsterdam, June 30, 2014. http://siasar.org SIASAR Information System for Rural Water and Sanitation WASH Sustainability Forum Amsterdam, June 30, 2014 http://siasar.org SIASAR.org A regional initiative to monitor and improve the sustainability

Más detalles

COBIT y la Administración de los Datos

COBIT y la Administración de los Datos CONFERENCIA ANUAL 2012 DE ISACA MONTERREY COBIT y la Administración de los Datos Facilitador: José Ángel Peña Ibarra, CGEIT, CRISC Agenda White Paper: Data Leak Prevention de ISACA COBIT y la Administración

Más detalles

Los cambios del borrador ISO 14001:2015

Los cambios del borrador ISO 14001:2015 Los cambios del borrador ISO 14001:2015 Se incluye a continuación un avance del contenido, en fase de discusión como anteriormente se ha comentado, de los apartados que va a incluir la nueva versión de

Más detalles

Tax exemption on primary agricultural, forestry, livestock, poultry, fishing and aquaculture activities

Tax exemption on primary agricultural, forestry, livestock, poultry, fishing and aquaculture activities Legal Update April 12, 2016 Tax exemption on primary agricultural, forestry, livestock, poultry, fishing and aquaculture activities Decree N 2287 was published in Official Gazette Nº 42.873 dated March

Más detalles

Operation Statistics. Central Interconnected Electric System Load Economic Dispatch Center

Operation Statistics. Central Interconnected Electric System Load Economic Dispatch Center Operation Statistics Central Interconnected Electric System Load Economic Dispatch Center GENERATION FACILITY OWNERS The Central Interconnected System (SIC) consists of the interconnection of power plants

Más detalles

GENERAL INFORMATION Project Description

GENERAL INFORMATION Project Description RESULTADOS! GENERAL INFORMATION Project Description The campaign "Adopt a car " had as its main objective to position Autoplaza, the main automotive selling point of Chile, as a new car sales location

Más detalles

INSTITUTO POLITÉCNICO NACIONAL

INSTITUTO POLITÉCNICO NACIONAL INSTITUTO POLITÉCNICO NACIONAL ESCUELA SUPERIOR DE TURISMO SECCIÓN DE ESTUDIOS DE POSGRADO E INVESTIGACIÓN MAESTRÍA EN ADMINISTRACIÓN E INNOVACIÓN DEL TURISMO ANÁLISIS DEL PROCESO DE GESTIÓN DEL TALENTO

Más detalles

Sistemas de impresión y tamaños mínimos Printing Systems and minimum sizes

Sistemas de impresión y tamaños mínimos Printing Systems and minimum sizes Sistemas de impresión y tamaños mínimos Printing Systems and minimum sizes Para la reproducción del Logotipo, deberán seguirse los lineamientos que se presentan a continuación y que servirán como guía

Más detalles

ESCUELA POLITÉCNICA DEL EJÉRCITO

ESCUELA POLITÉCNICA DEL EJÉRCITO ESCUELA POLITÉCNICA DEL EJÉRCITO DEPARTAMENTO DE CIENCIAS ECONÓMICAS, ADMINISTRATIVAS Y DE COMERCIO TESIS DE GRADO PREVIA A LA OBTENCIÓN DEL TÍTULO DE: INGENIERA EN FINANZAS, CONTADORA PÚBLICA - AUDITORA

Más detalles

ANÁLISIS ECONÓMICO Y FINANCIERO DEL SISTEMA ELÉCTRICO ESPAÑOL. BÚSQUEDA DE SOLUCIONES Y VIABILIDAD DE CADA UNA DE ELLAS

ANÁLISIS ECONÓMICO Y FINANCIERO DEL SISTEMA ELÉCTRICO ESPAÑOL. BÚSQUEDA DE SOLUCIONES Y VIABILIDAD DE CADA UNA DE ELLAS ANÁLISIS ECONÓMICO Y FINANCIERO DEL SISTEMA ELÉCTRICO ESPAÑOL. BÚSQUEDA DE SOLUCIONES Y VIABILIDAD DE CADA UNA DE ELLAS Autor: Moyano de Llano, José Alejandro Director: Fernández-Daza, Francisco Resumen

Más detalles

GENERAL DIRECTION OF CIVIL AERONAUTICS REPUBLIC OF BOLIVIA IMPLEMENTATION PLAN FOR THE COMPLYING OF THE PROFICIENCY LANGUAGE REQUIREMENTS

GENERAL DIRECTION OF CIVIL AERONAUTICS REPUBLIC OF BOLIVIA IMPLEMENTATION PLAN FOR THE COMPLYING OF THE PROFICIENCY LANGUAGE REQUIREMENTS IMPLEMENTATION PLAN FOR THE COMPLYING OF THE PROFICIENCY 2008 Page 2 de 12 INDEX 1. BACKGROUND.3 2. SCOPE...3 3. CONTENT OF THE REGULATORY FRAMEWORK...4 4. ESTIMATE OF NATIONAL LEVEL OF IMPLEMENTATION.

Más detalles

FINAL TERMS DATED 30 APRIL 2015 BNP

FINAL TERMS DATED 30 APRIL 2015 BNP FINAL TERMS DATED 30 APRIL 2015 BNP Paribas Arbitrage Issuance B.V. (incorporated in The Netherlands) (as Issuer) BNP Paribas (incorporated in France) (as Guarantor) (Note, Warrant and Certificate Programme)

Más detalles

SÉPTIMA REUNIÓN DELGRUPO DE EXPERTOS EN ASUNTOS POLÍTICOS, ECONÓMICOS Y JURÍDICOS DEL TRANSPORTE AÉREO (GEPEJTA/7)

SÉPTIMA REUNIÓN DELGRUPO DE EXPERTOS EN ASUNTOS POLÍTICOS, ECONÓMICOS Y JURÍDICOS DEL TRANSPORTE AÉREO (GEPEJTA/7) CLAC/GEPEJTA/7-NE/19 16/03/01 SÉPTIMA REUNIÓN DELGRUPO DE EXPERTOS EN ASUNTOS POLÍTICOS, ECONÓMICOS Y JURÍDICOS DEL TRANSPORTE AÉREO (GEPEJTA/7) (La Habana, Cuba, 28 al 30 de marzo de 2001) Cuestión 7

Más detalles

Presentación de Entidades y Propuestas para su participación en el 7º Programa Marco

Presentación de Entidades y Propuestas para su participación en el 7º Programa Marco Presentación de Entidades y Propuestas para su participación en el 7º Programa Marco Madrid, 22 de junio de 2010 JORNADA DE OPORTUNIDADES DEL SECTOR 1. Presentación de la empresa Plan Estratégico de Irradia

Más detalles

Servicio Extenda Oportunidades de Proyectos y Licitaciones Internacionales y Multilaterales

Servicio Extenda Oportunidades de Proyectos y Licitaciones Internacionales y Multilaterales Servicio Extenda Oportunidades de Proyectos y Licitaciones Internacionales y Multilaterales VIETNAM Hospital Waste Management Support Project Procurement of Solid Waste Treatment System of Hospitals NOTICE:

Más detalles

Success Case. SENA - Colombia

Success Case. SENA - Colombia Success Case SENA - Colombia Índice 01. Project characteristics 02. Activities 03. Benefits obtained 04. Awards 2 Project Characteristics 01 3 SENA Success Case - Colombia 01. Projct Characteristics Project

Más detalles

Reporte de Prensa: elaborado el 4 de junio, 12:00 (GMT+2) www.euroclima.org. -Reporte de Prensa-

Reporte de Prensa: elaborado el 4 de junio, 12:00 (GMT+2) www.euroclima.org. -Reporte de Prensa- Este reporte recoge algunas de las notas de los medios de comunicación y de varias instituciones de América Latina y de la Unión Europea sobre la visita a la Comisión Europea del Director Ejecutivo del

Más detalles

- Plazo Máximo de Presentación de Solicitud del Incentivo: 31/10/2014. - Aeropuerto de Origen: Nueva York John F. Kennedy (JFK).

- Plazo Máximo de Presentación de Solicitud del Incentivo: 31/10/2014. - Aeropuerto de Origen: Nueva York John F. Kennedy (JFK). ANUNCIO DE CONVOCATORIA PARA EL OTORGAMIENTO DEL INCENTIVO DEL PROGRAMA DE DESARROLLO DE VUELOS (FDV) PARA LA PUESTA EN MARCHA DE UNA NUEVA RUTA ENTRE EL AEROPUERTO DE TENERIFE SUR (TFS) Y EL AEROPUERTO

Más detalles

Lump Sum Final Check Contribution to Deferred Compensation

Lump Sum Final Check Contribution to Deferred Compensation Memo To: ERF Members The Employees Retirement Fund has been asked by Deferred Compensation to provide everyone that has signed up to retire with the attached information. Please read the information from

Más detalles

IE12_ CONSOLIDACIÓN Y DESARROLLO DE NUEVAS TÉCNICAS DE EVALUACIÓN INTENSIVAS ON-LINE YA IMPLEMENTADAS POR EL GIE E4

IE12_ CONSOLIDACIÓN Y DESARROLLO DE NUEVAS TÉCNICAS DE EVALUACIÓN INTENSIVAS ON-LINE YA IMPLEMENTADAS POR EL GIE E4 IE12_13-03001 - CONSOLIDACIÓN Y DESARROLLO DE NUEVAS TÉCNICAS DE EVALUACIÓN Departamento de Estructuras de la Edificación Escuela Técnica Superior de Arquitectura de Madrid Universidad Politécnica de Madrid

Más detalles

INFORME ANUAL 07 / ANNUAL REPORT 07

INFORME ANUAL 07 / ANNUAL REPORT 07 66 67 Uralita en Bolsa Uralita on the Stock Market 68 La acción de Uralita experimentó en el ejercicio 2007 una revalorización del 20,2% con respecto al año anterior, evolución más positiva que la del

Más detalles

Karina Ocaña Izquierdo

Karina Ocaña Izquierdo Estudié Ingeniería en Sistemas Computacionales (1997) y una Maestría en Ingeniería de Cómputo con especialidad en Sistemas Digitales (2000), ambas en el Instituto Politécnico Nacional (México). En el 2003,

Más detalles

Oficina de Convenciones y Visitantes de Hidalgo A.C. PLAN DE MARKETING

Oficina de Convenciones y Visitantes de Hidalgo A.C. PLAN DE MARKETING INSTITUTO POLITÉCNICO NACIONAL ESCUELA SUPERIOR DE TURISMO SECCIÓN DE ESTUDIOS DE POSGRADO E INVESTIGACIÓN Oficina de Convenciones y Visitantes de Hidalgo A.C. PLAN DE MARKETING TESIS PARA OBTENER EL GRADO

Más detalles

BOLETÍN DE PRENSA. No. OMH-0042 JUNIO 2015. Convocatoria IME-Becas

BOLETÍN DE PRENSA. No. OMH-0042 JUNIO 2015. Convocatoria IME-Becas BOLETÍN DE PRENSA No. OMH-0042 JUNIO 2015 Convocatoria IME-Becas Omaha, Nebraska a 17 de Junio de 2015 El Consulado de México se complace en lanzar por segunda vez consecutiva en Omaha, Nebraska, el programa

Más detalles

Registro de Semilla y Material de Plantación

Registro de Semilla y Material de Plantación Registro de Semilla y Material de Plantación Este registro es para documentar la semilla y material de plantación que usa, y su estatus. Mantenga las facturas y otra documentación pertinente con sus registros.

Más detalles

SIHI México, S. de R.L. de C.V. Pricing Guide

SIHI México, S. de R.L. de C.V. Pricing Guide Pricing Guide Rates effective as of: October 1, 2016 Note: Rates are subject to change without prior notice. Rates are stated in Mexican Pesos unless otherwise specified. page 1 of 5 Table Of Contents

Más detalles

PROYECTO INFORMÁTICO PARA LA CREACIÓN DE UN GESTOR DOCUMENTAL PARA LA ONG ENTRECULTURAS

PROYECTO INFORMÁTICO PARA LA CREACIÓN DE UN GESTOR DOCUMENTAL PARA LA ONG ENTRECULTURAS PROYECTO INFORMÁTICO PARA LA CREACIÓN DE UN GESTOR DOCUMENTAL PARA LA ONG ENTRECULTURAS Autor: García Lodares, Victor. Director: Castejón Silvo, Pedro. Entidad Colaboradora: Entreculturas. Resumen del

Más detalles

Business Technology and Banking.

Business Technology and Banking. Business Technology and Banking. Innovate, streamline, adapt. Iván Menéndez Business Development Manager Iberia HP SOFTWARE 2006 Hewlett-Packard Development Company, L.P. The information contained herein

Más detalles

RESUMEN EJECUTIVO. empresa Areasurvey S.A. manejar adecuadamente el excedente de efectivo generado por

RESUMEN EJECUTIVO. empresa Areasurvey S.A. manejar adecuadamente el excedente de efectivo generado por RESUMEN EJECUTIVO El presente trabajo fue realizado con el objeto de proponer un modelo para la diversificación y gestión de un portafolio de inversiones, herramienta que permitirá a la empresa Areasurvey

Más detalles

SCO OFFER OF ANTIMONY (Sb2S3) (VALIDITY 15 BUSINESS DAYS) Origin: HONDURAS

SCO OFFER OF ANTIMONY (Sb2S3) (VALIDITY 15 BUSINESS DAYS) Origin: HONDURAS SCO OFFER OF ANTIMONY (Sb2S3) (VALIDITY 15 BUSINESS DAYS) Origin: HONDURAS ANTIMONY (Sb2S3), GRANULOMETRY: Stone size reduced, - 1200 TONS TO NEGOTIATE INITIAL SPOT, - AFTER CONTRACT FROM 1500 TM MONTHLY

Más detalles

IMPLANTACIÓN DE UNA SOLUCIÓN PLM QUE GARANTICE LAS CLAVES Y PRINCIPIOS RECOGIDOS POR EL SISTEMA DE GESTIÓN DE LA CALIDAD SIX SIGMA

IMPLANTACIÓN DE UNA SOLUCIÓN PLM QUE GARANTICE LAS CLAVES Y PRINCIPIOS RECOGIDOS POR EL SISTEMA DE GESTIÓN DE LA CALIDAD SIX SIGMA IMPLANTACIÓN DE UNA SOLUCIÓN PLM QUE GARANTICE LAS CLAVES Y PRINCIPIOS RECOGIDOS POR EL SISTEMA DE GESTIÓN DE LA CALIDAD SIX SIGMA Autor: Prats Sánchez, Juan. Director: Díaz Carrillo, Gerardo. Entidad

Más detalles

Dr. Ricardo Hernández Mogollón Facultad de Estudios Empresariales y Turismo Universidad de Extremadura. ricardohernandezmogollon@gmail.

Dr. Ricardo Hernández Mogollón Facultad de Estudios Empresariales y Turismo Universidad de Extremadura. ricardohernandezmogollon@gmail. What is the NEEx Program and what is it designed to do Introduction (NEEX New Companies in Extremadura) Environment: Extremadura is a developing region of Spain, and has the highest level of unemployment.

Más detalles

Agenda de Acción / Action Agenda

Agenda de Acción / Action Agenda Agenda de Acción / Action Agenda Youth Inclusion/Inclusión Juvenil Sugerencias Difusión de los documentos a discutir en los 6 idiomas oficiales de la ONU Si los documentos enviados para toma de decisiones

Más detalles

CORPORACIÓN NACIONAL DEL COBRE DE CHILE GERENCIA DE ABASTECIMIENTO LICITACIÓN Nº GAB-LIC-11/3137 SUMINISTRO DE MATERIAL REFRACTARIO RESUMEN EJECUTIVO

CORPORACIÓN NACIONAL DEL COBRE DE CHILE GERENCIA DE ABASTECIMIENTO LICITACIÓN Nº GAB-LIC-11/3137 SUMINISTRO DE MATERIAL REFRACTARIO RESUMEN EJECUTIVO CORPORACIÓN NACIONAL DEL COBRE DE CHILE GERENCIA DE ABASTECIMIENTO LICITACIÓN Nº GAB-LIC-11/3137 SUMINISTRO DE MATERIAL REFRACTARIO RESUMEN EJECUTIVO La Corporación Nacional del Cobre, CODELCO, por intermedio

Más detalles

MODELADO DE LA CARGA Y DESCARGA DEL VEHÍCULO ELÉCTRICO Y SU IMPACTO A CORTO PLAZO EN EL SISTEMA ELÉCTRICO DE OPERACIÓN

MODELADO DE LA CARGA Y DESCARGA DEL VEHÍCULO ELÉCTRICO Y SU IMPACTO A CORTO PLAZO EN EL SISTEMA ELÉCTRICO DE OPERACIÓN MODELADO DE LA CARGA Y DESCARGA DEL VEHÍCULO ELÉCTRICO Y SU IMPACTO A CORTO PLAZO EN EL SISTEMA ELÉCTRICO DE OPERACIÓN Autor: Hernández Rodríguez-Mancheño, Ángel. Director: Ramos Galán, Andrés. Entidad

Más detalles

United States Spain Treaties in Force

United States Spain Treaties in Force Alien Amateur Radio Operators Agreement effected by exchange of notes Signed at Madrid December 11 and 20, 1979; Entered into force December 20, 1979. TIAS 9721 STATUS: Agreement effected by exchange of

Más detalles

SOFTWARE PARA LA GESTIÓN INFORMÁTICA DE UNA CLÍNICA DENTAL

SOFTWARE PARA LA GESTIÓN INFORMÁTICA DE UNA CLÍNICA DENTAL SOFTWARE PARA LA GESTIÓN INFORMÁTICA DE UNA CLÍNICA DENTAL Autora: Laura Martín García Director: Alberto Ciudad Sánchez RESUMEN El objetivo de este proyecto es realizar el análisis, diseño y desarrollo

Más detalles

Investigación, Ciencia y Tecnología en Medio Ambiente y Cambio Climático. Environmental and Climate Change related Research and Technology Programme

Investigación, Ciencia y Tecnología en Medio Ambiente y Cambio Climático. Environmental and Climate Change related Research and Technology Programme Programa de: Investigación, Ciencia y Tecnología en Medio Ambiente y Cambio Climático MECANISMO FINANCIERO DEL ESPACIO ECONÓMICO EUROPEO PARA ESPAÑA Programme on: Environmental and Climate Change related

Más detalles

Exchanges Regionalization and Corporate Governance - Central America

Exchanges Regionalization and Corporate Governance - Central America Exchanges Regionalization and Corporate Governance - Central America Latin American CG Roundtable México 2008 Bolsa Nacional de Valores Costa Rica Mercados centroamericanos El Salvador BVES Costa Rica

Más detalles

FAMILY INDEPENDENCE ADMINISTRATION Seth W. Diamond, Executive Deputy Commissioner

FAMILY INDEPENDENCE ADMINISTRATION Seth W. Diamond, Executive Deputy Commissioner FAMILY INDEPENDENCE ADMINISTRATION Seth W. Diamond, Executive Deputy Commissioner James K. Whelan, Deputy Commissioner Policy, Procedures, and Training Lisa C. Fitzpatrick, Assistant Deputy Commissioner

Más detalles

SCO OFFER OF TANTALITE (Nb2O5 - Ta2O5) (VALIDITY 15 BUSINESS DAYS) Origin: HONDURAS

SCO OFFER OF TANTALITE (Nb2O5 - Ta2O5) (VALIDITY 15 BUSINESS DAYS) Origin: HONDURAS SCO OFFER OF TANTALITE (Nb2O5 - Ta2O5) (VALIDITY 15 BUSINESS DAYS) Origin: HONDURAS TANTALITE (Ta2O5 = 52,4%; Nb2O5 = 20,9%), GRANULOMETRY: upper 14 MESH, - 500 TONS TO NEGOTIATE INITIAL SPOT, - AFTER

Más detalles