1 Florida Department of TRANSPORTATION State Road (SR) 968/SW 1 Street from 24 Avenue to 17 Avenue Identification Number: Public Information Meeting Latin Chamber of Commerce (CAMACOL) Tuesday, July 26, p.m. 8 p.m.

2 Project Overview Project Location: SW 1 Street from 24 Avenue to 17 Avenue in the City of Miami Project Schedule: Project begins the week of August 15, 2016 Estimated completion is Spring 2018 o Please note that this schedule could change due to bad weather or other unexpected conditions. Estimated construction cost is $8.78 million

3 Project Limits N Legend Project Area Project Area

4 Project Benefits Along SW 1 Street Reconstructing roadway to improve riding surface Exclusive bicycle lane to increase mobility New sidewalks and pedestrian signals to improve safety Improved storm water drainage to address flooding Improving signalization throughout corridor to update to current standards New roadway lighting to meet current standards

5 Maintenance of Traffic Along SW 1 Street Pedestrian and business access will be maintained at all times Work will be performed in phases to minimize impacts to traffic To do this work safely, traffic shifts will be performed to establish permanent work zones and reduce the number of travel lanes A minimum of one lane of traffic will be maintained during weekday daytime hours

6 Now and The Future Flagler Street & SW 1 Street Projects This is the third of four projects along Flagler Street and SW 1 Street from 27 Avenue to 2 Avenue Current Projects: Flagler Street from 27 Avenue to 14 Avenue Flagler Street from 14 Avenue to 2 Avenue Future Projects: Fall 2016: SW 1 Street from SW 17 Avenue to SW 6 Avenue

7 Project Update Flagler Street from 27 Avenue to 14 Avenue This project started March 28, 2016 The current work zone is on the north side of Flagler Street between 14 Avenue and 29 Avenue Drainage and water main work is ongoing Water main work between 17 Avenue and 22 Avenue is approaching completion Specialized pedestrian barricades have been installed along the north side of the corridor to safely separate the sidewalk from the work zone

8 Project Update Flagler Street from 14 Avenue to 2 Avenue This project started June 6, 2016 The current work zone is on the north side of Flagler Street between 10 Avenue and 14 Avenue Water main is being installed at 14 Avenue and heading east A work zone will be established on the south side of Flagler Street between 6 Avenue and 9 Avenue Specialized pedestrian barricades have been installed along the north side of the corridor to safely separate the sidewalk from the work zone

9 Project Update Flagler Street from 27 Avenue to 14 Avenue

10 Project Update Flagler Street from 14 Avenue to 2 Avenue

11 Potential Impacts Dust, noise and vibration Traffic impacts Traffic shifts Minimizing the number of travel lanes within work zone and setting up detours Temporarily eliminating on-street parking during construction Pedestrian Impacts Sidewalk closures and pedestrian detours while maintaining access to businesses Heavy equipment and construction crews in and around area

12 Mitigation Efforts Clearly marked detours to assist the traveling public through alternate routes Traffic signal timing coordination with Miami-Dade County Provide access for pedestrians at all times Coordination with Miami-Dade Transit and City of Miami Trolley to maintain bus service Vibration monitoring Frequent watering and sweeping Certified flagmen as needed

13 Outreach Plan Dedicated Public Information Specialist Continuous coordination with businesses Access coordination Flyer and door hanger distribution Meetings Public Information Meeting and updates Coordination meetings One-on-one meetings available Electronic project updates Construction website Project information Lane closure and detour information Submitting questions/feedback

14 Contact Information Public Information Specialist Sergies Duarte at (305) cell phone (305) office phone or via at Senior Project Engineer Arturo Perez, P.E. at (786) cell phone For more information on lane closures and other project details, please visit:

15 Project Team Claudio Diaferia, P.E. FDOT South Miami-Dade & Monroe Resident Engineer Andres Berisiartu, P.E. FDOT Project Manager Arturo Perez, P.E. CCEI Senior Project Engineer Doug Schumann, P.E. CCEI Project Engineer JVA Engineering Contractor, Inc. Contractor Sergies Duarte Public Information Specialist

16 Florida Department of TRANSPORTATION Carretera Estatal 968/Calle 1 del suroeste desde la Avenida 24 del suroeste hasta la Avenida 17 del suroeste Número de Identificación: Reunión Pública CAMACOL martes, 26 de julio del p.m. 8 p.m.

17 Descripción del Proyecto Area del trabajo: Calle 1 del suroeste desde la Avenida 24 hasta la Avenida 17 en la ciudad de Miami Itinerario del proyecto: Empieza la semana del 15 de agosto del 2016 Finalización del proyecto estimado para la primavera del 2018 o Estas fechas pueden cambiar según las condiciones del tiempo y otras condiciones imprevistas. o Costo estimado del proyecto es $8.78 millones

18 Área del Proyecto N Clave Project Area Área del Proyecto

19 Beneficios del Proyecto a lo largo de la Calle 1 del suroeste Reconstrucción de la carretera para mejorar la superficie Carril exclusivo de bicicleta para aumentar la movilidad Nuevas aceras y señales para peatones para mejorar la seguridad Nuevo sistema de drenaje para resolver las inundaciones Nuevos señales de tráfico para cumplir con las normas actuales Iluminación nueva en la carretera para cumplir con las normas actuales

20 Mantenimiento del Tráfico a lo largo de la Calle 1 del suroeste Acceso peatonal y de negocios se mantendrán a todos tiempos El trabajo se realizará en fases para minimizar los impactos al tráfico Para completar este trabajo sin peligro, será necesario realizar cambios de tráfico para establecer zonas de trabajo permanentes y reducir el número de carriles de viaje Un mínimo de un carril de tráfico se mantendrá durante las horas del día de lunes a viernes

21 El Presente y El Futuro Proyectos a lo largo de la Calle Flagler y Calle 1 del suroeste Este es el tercero de cuatro proyectos que se realizarán a lo largo de la Calle Flagler y Calle 1 del suroeste desde la Avenida 27 hasta la Avenida 2 Proyectos Presentemente en Construcción: Calle Flagler desde la Avenida 27 hasta la Avenida 14 Calle Flagler desde la Avenida 14 hasta la Avenida 2 Proyectos en el Futuro: El otoño del 2016: Calle 1 del suroeste desde la Avenida 17 del suroeste hasta la Avenida 6 del suroeste

22 Actualizaciones de los Proyectos Calle Flagler desde la Avenida 27 hasta la Avenida 14 Este proyecto empezó el 28 de marzo del 2016 La zona de trabajo esta concentrado a lo largo de la Calle Flagler en el lado norte de la carretera entre la Avenida 14 y Avenida 29 Trabajo del sistema de drenaje y tubería de agua continua El acceso a los negocios se ha mantenido en todos momentos Barricadas para peatones han sido instalado al lado norte de la carretera para separar la acera y la zona de trabajo con seguridad

23 Actualizaciónes de los Proyectos Calle Flagler desde la Avenida 14 hasta la Avenida 2 Este proyecto empezó el 6 de junio del 2016 La zona de trabajo esta concentrado a lo largo de la Calle Flagler en el lado norte de la carretera entre la Avenida 10 y Avenida 14 Installación de la nueva tubería de agua ha comenzado en la Avenida 14 y continuará para el este Se establecerá una zona de trabajo en el lado sur de la Calle Flagler desde la Avenida 6 y Avenida 9 Barricadas para peatones han sido instalado al lado norte de la carretera para separar la acera y la zona de trabajo con seguridad

24 Actualizaciones de los Proyectos Calle Flagler desde la Avenida 27 hasta la Avenida 14

25 Actualizaciones de los Proyectos Calle Flagler desde la Avenida 14 hasta la Avenida 2

26 Impactos Potenciales Polvo, ruido y vibración Impactos al tráfico Cambios de tráfico Reduciendo el número de carriles de viaje dentro de la zona de trabajo y el establecimiento de desvíos Eliminando temporalmente el estacionamiento en la calle durante la construcción Impactos a los peatones Cierres de la acera, desvíos para peatones y siempre manteniendo el acceso a los negocios Obreros y maquinaria de construcción desplazándose en el área

27 Los Esfuerzos de Mitigación Desvíos claramente marcados para ayudar al público a través de rutas alternativas Coordinación para la sincronización de la señales de tráfico con el condado de Miami-Dade Siempre manteniendo el aceso para peatones Coordinación con la agencia de Transito Miami-Dade para mantener el servicio de autobuses El monitoreo de vibración El riego de agua y barrido frecuentemente Obreros certificados para dirigir tráfico

28 La Difusión de Información Especialista de Información Pública dedicado al proyecto Coordinación continua con los negocios Coordinación de acceso Distribución de volantes/folletos Reuniones Reuniones de información pública y actualizaciones Reuniones para coordinación Reuniones uno-a-uno disponibles Actualizaciones electrónicas del proyecto Página web de la construcción Información del proyecto Información de cierres de carril y desvíos Enviar preguntas/comentarios

29 Comuníquese Con Nosotros Especialista de Información Pública Sergies Duarte al (305) número celular (305) número de la oficina o por correo electrónico: Sergies.Duarte@dot.state.fl.us Ingeniero del Proyecto Arturo Perez, P.E. al (786) número celular Para obtener más información sobre el cierre de carriles y otros detalles del proyecto, por favor visite:

State Road (SR) 968/SW 1 Street from SW 17 Avenue to SW 6 Avenue

State Road (SR) 968/SW 1 Street from SW 17 Avenue to SW 6 Avenue Florida Department of TRANSPORTATION State Road (SR) 968/SW 1 Street from SW 17 Avenue to SW 6 Avenue Identification Number: 418312-2-52-01 Public Information Meeting Latin Chamber of Commerce (CAMACOL)

Más detalles

State Road (SR) 985/SW 107 Avenue from SW 1100 Block to north of West Flagler Street

State Road (SR) 985/SW 107 Avenue from SW 1100 Block to north of West Flagler Street Florida Department of TRANSPORTATION State Road (SR) 985/SW 107 Avenue from SW 1100 Block to north of West Flagler Street Identification Numbers: 412479-2/3-52-01 Public Information Meeting City of Sweetwater

Más detalles

Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update November 25, 2016

Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update November 25, 2016 Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update November 25, 2016 The following will be in effect, weather and conditions permitting, and weekend work will be scheduled as necessary.

Más detalles

Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update December 9, 2016

Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update December 9, 2016 Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update December 9, 2016 The following will be in effect, weather and conditions permitting, and weekend work will be scheduled as necessary.

Más detalles

Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update October 28, 2016

Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update October 28, 2016 Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update October 28, 2016 The following will be in effect, weather and conditions permitting, and weekend work will be scheduled as necessary.

Más detalles

Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update February 10, 2017

Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update February 10, 2017 Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update February 10, 2017 The following will be in effect, weather and conditions permitting, and weekend work will be scheduled as necessary.

Más detalles

Alum Rock/Santa Clara Bus Rapid Transit Project

Alum Rock/Santa Clara Bus Rapid Transit Project Alum Rock/Santa Clara Bus Rapid Transit Project March Community Meetings Join us for two community meetings! Learn about new project schedules, and planned work to complete the Alum Rock/Santa Clara BRT

Más detalles

Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update April 3, 2017

Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update April 3, 2017 Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update April 3, 2017 The following will be in effect, weather and conditions permitting, and weekend work will be scheduled as necessary. *Serious

Más detalles

Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update October 14, 2016

Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update October 14, 2016 Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update October 14, 2016 The following will be in effect, weather and conditions permitting, and weekend work will be scheduled as necessary.

Más detalles

Next stop: the missing link.

Next stop: the missing link. metro.net/regionalconnector Next stop: the missing link. Próxima parada: la conexión faltante. regional connector transit project Flower St Weekend Detours: 5th St to Wilshire Bl Desvíos de fin de semana

Más detalles

Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update April 18, 2016

Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update April 18, 2016 Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update April 18, 2016 The following will be in effect, weather and conditions permitting, and weekend work will be scheduled as necessary. Alum

Más detalles

Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update May 2, 2016

Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update May 2, 2016 Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update May 2, 2016 The following will be in effect, weather and conditions permitting, and weekend work will be scheduled as necessary. Alum

Más detalles

Florida Department of Transportation 3100 Overseas Highway Marathon, Florida 33050

Florida Department of Transportation 3100 Overseas Highway Marathon, Florida 33050 RICK SCOTT GOVERNOR Florida Department of Transportation 3100 Overseas Highway Marathon, Florida 33050 April 7, 2014 ANANTH PRASAD, P.E. SECRETARY Reference: Roadway Project Notification SR/US-1/Overseas

Más detalles

Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update June 10, 2016

Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update June 10, 2016 Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update June 10, 2016 The following will be in effect, weather and conditions permitting, and weekend work will be scheduled as necessary. Alum

Más detalles

Federal Boulevard (5th Avenue to Howard Place) Planning Environmental Linkage Study. Project Area. Route

Federal Boulevard (5th Avenue to Howard Place) Planning Environmental Linkage Study. Project Area. Route Project Area Route 1b What is a Planning Environmental Linkage (PEL) study? The Federal Highway Administration (FHWA) defines Planning Environmental Linkage (PEL) as a voluntary approach to transportation

Más detalles

Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update September 30, 2016

Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update September 30, 2016 Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update September 30, 2016 The following will be in effect, weather and conditions permitting, and weekend work will be scheduled as necessary.

Más detalles

WILMINGTON AVENUE SAFE STREETS PEDESTRIAN/BICYCLE PATH IMPROVEMENT PROJECT CIP# 15-01

WILMINGTON AVENUE SAFE STREETS PEDESTRIAN/BICYCLE PATH IMPROVEMENT PROJECT CIP# 15-01 WILMINGTON AVENUE SAFE STREETS PEDESTRIAN/BICYCLE PATH IMPROVEMENT PROJECT CIP# 15-01 The City of Compton will be performing another Public Works street improvement project. The Wilmington Avenue Safe

Más detalles

Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update August 26, 2016

Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update August 26, 2016 Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update August 26, 2016 The following will be in effect, weather and conditions permitting, and weekend work will be scheduled as necessary.

Más detalles

Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update July 25, 2016

Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update July 25, 2016 Alum Rock/Santa Clara Bus Rapid Transit Project Construction Update July 25, 2016 The following will be in effect, weather and conditions permitting, and weekend work will be scheduled as necessary. Alum

Más detalles

Preliminarily Identified Preferred Alternative

Preliminarily Identified Preferred Alternative Preliminarily Identified Preferred Alternative The Partial Cover Lowered Alternative with Managed Lanes Option has been preliminarily identified as the I-70 East project s Preferred Alternative. The Partial

Más detalles

EMX. EmX is Eugene-Springfield s Bus Rapid Transit (BRT) system. Map Key

EMX. EmX is Eugene-Springfield s Bus Rapid Transit (BRT) system. Map Key EmX is - s Bus Rapid Transit (BRT) system. EMX The Emerald Express (EmX), named after the region s Emerald Valley, serves the - metropolitan area and is one of the first BRT systems to operate in the U.S.

Más detalles

EMX EMERALD EXPRESS (EMX) EmX is Eugene-Springfield s Bus Rapid Transit (BRT) system. Map Key What s new? Map Key

EMX EMERALD EXPRESS (EMX) EmX is Eugene-Springfield s Bus Rapid Transit (BRT) system. Map Key What s new? Map Key EmX is - s Bus Rapid Transit (BRT) system. EMERALD EXPRESS (EMX) EMX The Emerald Express (EmX), named after the region s Emerald Valley, serves the - metropolitan area and is one of the first BRT systems

Más detalles

APPENDIX B: PUBLIC INVOLVEMENT INFORMATION

APPENDIX B: PUBLIC INVOLVEMENT INFORMATION APPENDIX B: PUBLIC INVOLVEMENT INFORMATION 5th St 15th St 7.75 x 6 Daily Sentinel Ad Thursday, September 28, 2006 4:30 PM to 7:00 PM First Congregational Church - Pilgrim Hall 1425 N. 5th in Grand Junction

Más detalles

SH 68 Project. Fact Sheet

SH 68 Project. Fact Sheet SH 68 Project Fact Sheet Why SH 68 Is Needed SH 68 is a proposed 22 mile new road that will connect I-2/US 83 to I-69C/US 281. The proposed new road will connect with I-2/US 83 between Alamo and Donna

Más detalles

CITY OF EL CENTRO PRESS RELEASE

CITY OF EL CENTRO PRESS RELEASE CITY OF EL CENTRO PRESS RELEASE Community Development Department (760) 337-4545 www.cityofelcentro.org The City of El Centro and Go Human invite Imperial Valley residents and its neighbors to walk, bike,

Más detalles

Welcome! Bienvenidos! Public Workshop For the Imperial County Transportation Commission Short Range Transit Plan

Welcome! Bienvenidos! Public Workshop For the Imperial County Transportation Commission Short Range Transit Plan Welcome! Public Workshop For the Imperial County Transportation Commission Short Range Transit Plan Bienvenidos! Taller Publico Plan a Corto Plazo de Tránsito de la Comisión de Transporte del Condado de

Más detalles

PROJECT LOCATION MAP PROPOSED IMPROVEMENTS TO FM 659(ZARAGOZA ROAD)/ MONTWOOD DRIVE/LOOP 375 INTERSECTION EL PASO COUNTY, TEXAS CSJ:

PROJECT LOCATION MAP PROPOSED IMPROVEMENTS TO FM 659(ZARAGOZA ROAD)/ MONTWOOD DRIVE/LOOP 375 INTERSECTION EL PASO COUNTY, TEXAS CSJ: PROJECT LOCATION MAP PROPOSED IMPROVEMENTS TO FM 659(ZARAGOZA ROAD)/ MONTWOOD DRIVE/LOOP 375 INTERSECTION EL PASO COUNTY, TEXAS CSJ: 1046-01-030 Public Meeting April 4, 2017 Montwood High School PUBLIC

Más detalles

BACKGROUND: KEY RECOMMENDATIONS FROM PREVIOUS STUDIES

BACKGROUND: KEY RECOMMENDATIONS FROM PREVIOUS STUDIES BACKGROUND: KEY RECOMMENDATIONS FROM PREVIOUS STUDIES ANTECEDENTES: RECOMENDACIONES CLAVE DE ESTUDIOS PREVIOS 2012 Arizona Avenue High Capacity Transit (HCT) Long Range Study Estudio a Largo Plazo del

Más detalles

D8 Hospital Center Line

D8 Hospital Center Line How to use this timetable Use the map to find the stops closest to where you will get on and off the bus. Select the schedule (Weekday, Saturday, Sunday) for when you will travel. Along the top of the

Más detalles

Positive Parenting Practices Scheduled for January 2014 through March 2014

Positive Parenting Practices Scheduled for January 2014 through March 2014 Positive Parenting Practices Scheduled for January 2014 through March 2014 Dear Pre-K SPED Teachers and Staff: Attached you will find the schedule for the Positive Parenting Practices Series. The evening

Más detalles

El Paso County Stormwater Master Plan. Public Meeting #1

El Paso County Stormwater Master Plan. Public Meeting #1 El Paso County Stormwater Master Plan Public Meeting #1 September 16, 2009 Plan Maestro de Obras de Protección y Control de Aguas Pluviales del Condado d de El Paso Junta Pública #1 16 de Septiembre del

Más detalles

(ESCRIBA EN LETRAS DE MOLDE) NOMBRE: DIRECCIÓN: AFILIACIÓN:

(ESCRIBA EN LETRAS DE MOLDE) NOMBRE: DIRECCIÓN: AFILIACIÓN: TARJETA DE COMENTARIOS San Antonio Street Bridge en Comal River 1 de mayo del 2018 New Braunfels Civic/ Convention Center 375 South Castell Avenue, New Braunfels, TX 78130 (ESCRIBA EN LETRAS DE MOLDE)

Más detalles

Fort Bend County Fresh Water Supply District No. 1. May 2017 Bond Election. Fort Bend County Fresh Water Supply District No. 1

Fort Bend County Fresh Water Supply District No. 1. May 2017 Bond Election. Fort Bend County Fresh Water Supply District No. 1 Fort Bend County Fresh Water Supply District No. 1 May 2017 Bond Election Fort Bend County Fresh Water Supply District No. 1 Elección de Bono de Mayo de 2017 District s Current Water System Water Plant

Más detalles

STEP ONE PRIMER PASO OVERVIEW VISIÓN GENERAL

STEP ONE PRIMER PASO OVERVIEW VISIÓN GENERAL STEP ONE PRIMER PASO OVERVIEW VISIÓN GENERAL STEP TWO SEGUNDO PASO YESTERDAY AYER STEP THREE TERCER PASO TODAY HOY STEP FOUR CUARTO PASO TOMORROW MAÑANA STEP FIVE QUINTO PASO CONTEXT

Más detalles

Madera County Transportation Commission Active Transportation Plan Bike/Ped Plan Survey Questions (Preguntas de Encuesta sobre Ciclismo/Peatones)

Madera County Transportation Commission Active Transportation Plan Bike/Ped Plan Survey Questions (Preguntas de Encuesta sobre Ciclismo/Peatones) 1 Where do you live? ( Dónde vives?) 2 Where do you work? ( Dónde trabajas?) City of Chowchilla (Ciudad de Chowchilla) City of Madera (Ciudad de Madera) Fairmead Berenda Raymond Western Madera County (Este

Más detalles

District 1. Cardboard will be picked up on Bergenline Avenue. and 57 th, 58 th and 59 th Streets from Bergenline Avenue to Park Avenue.

District 1. Cardboard will be picked up on Bergenline Avenue. and 57 th, 58 th and 59 th Streets from Bergenline Avenue to Park Avenue. District 1 Garbage Pickup Monday and Thursday: Tuesday and Friday: Garbage will be picked up from 49 th street up to 56 th Street from Bergenline Avenue to Boulevard East including 60 th Street and South

Más detalles

HIGH CAPACITY TRANSIT SYSTEM SISTEMA DE TRANSPORTE DE GRAN CAPACIDAD PHOENIX WEST HIGH CAPACITY TRANSIT STUDY ESTUDIO DEL TRÁNSITO DE GRAN CAPACIDAD

HIGH CAPACITY TRANSIT SYSTEM SISTEMA DE TRANSPORTE DE GRAN CAPACIDAD PHOENIX WEST HIGH CAPACITY TRANSIT STUDY ESTUDIO DEL TRÁNSITO DE GRAN CAPACIDAD HIGH CAPACITY TRANSIT SYSTEM SISTEMA DE TRANSPORTE DE GRAN CAPACIDAD 17 Phoenix 101 Peoria Glendale 2026 2026 2023 51 2031 Paradise Valley 101 Avondale Tolleson 10 2021 202 Scottsdale 202 Mesa 17 143 2016

Más detalles

Highway Alternative A/Alternativa de la Autopista A

Highway Alternative A/Alternativa de la Autopista A Highway Alternative A/Alternativa de la Autopista A General purpose lanes on the existing I- alignment Carriles de propósito general en la alineación de la I- existente Add 1 or 2 general purpose lanes

Más detalles

September 13, 2009 Bus Service Change

September 13, 2009 Bus Service Change September 13, 2009 Bus Service Change Cambio en el Servicio de Autobús del 13 de Septiembre del 2009 Routes Affected / s Afectadas: 20, 26, 29, 33, 38, 43, 46, 50, 51, 54, 55, 56, 59, 62, 71, 72, 74, 76,

Más detalles

FAMILY INDEPENDENCE ADMINISTRATION Seth W. Diamond, Executive Deputy Commissioner

FAMILY INDEPENDENCE ADMINISTRATION Seth W. Diamond, Executive Deputy Commissioner FAMILY INDEPENDENCE ADMINISTRATION Seth W. Diamond, Executive Deputy Commissioner James K. Whelan, Deputy Commissioner Policy, Procedures, and Training Lisa C. Fitzpatrick, Assistant Deputy Commissioner

Más detalles

Gateway Cities COG SCS Overview. Spring 2011 Public Information Open Houses

Gateway Cities COG SCS Overview. Spring 2011 Public Information Open Houses Gateway Cities COG SCS Overview Spring 2011 Public Information Open Houses 1 Background Senate Bill 375 - Overview Legislation passed in 2008 Aims at reducing greenhouse gas emissions (GHG) from cars and

Más detalles

59 14th Street Limited Line

59 14th Street Limited Line How to use this timetable Use the map to find the stops closest to where you will get on and off the bus. Select the schedule (Weekday, Saturday, Sunday) for when you will travel. Along the top of the

Más detalles

Interstate Alternatives Alternativas Interestatales

Interstate Alternatives Alternativas Interestatales Interstate Alternatives Alternativas Interestatales Detailed screening is a quantitative (measurebased) analysis that identifies the strengths of the various alternatives. Six main interstate alternatives

Más detalles

metrobus Georgia Ave - 7th Street Buses arrive every Los autobuses llegan cada EFFECTIVE JUNE 24, 2018 MONDAY-FRIDAY SATURDAY-SUNDAY

metrobus Georgia Ave - 7th Street Buses arrive every Los autobuses llegan cada EFFECTIVE JUNE 24, 2018 MONDAY-FRIDAY SATURDAY-SUNDAY EFFECTIVE JUNE 24, 2018 A PARTIR DEL 24 DE JUNIO DE 2018 70 metrobus Ave - 7th Street MONDAY-FRIDAY SATURDAY-SUNDAY LUNES-VIERNES SÁBADO-DOMINGO MIN MIN 6:00am - 11:00pm 6:00am - 11:00pm For arrival times

Más detalles

NOTICE OF ELECTION TO THE QUALIFIED ELECTORS OF THE CITY OF KENDLETON, TEXAS AND ALL OTHER INTERESTED PERSONS:

NOTICE OF ELECTION TO THE QUALIFIED ELECTORS OF THE CITY OF KENDLETON, TEXAS AND ALL OTHER INTERESTED PERSONS: NOTICE OF ELECTION TO THE QUALIFIED ELECTORS OF THE CITY OF KENDLETON, TEXAS AND ALL OTHER INTERESTED PERSONS: The City of Kendleton (the "City") will hold a City Council Election (the "Election") jointly

Más detalles

route ruta CL SERVICE CHANGES Effective: January 28, 2018 CAMBIOS EN SERVICIO Effectivo: 28 de enero de 2018

route ruta CL SERVICE CHANGES Effective: January 28, 2018 CAMBIOS EN SERVICIO Effectivo: 28 de enero de 2018 CAMBIOS EN SERVICIO Effectivo: 28 de enero de 2018 A partir del 28 de enero de 2018, se aplicarán los cambios en el servicio de Coastal Link GBT y las agencias asociadas que operan el servicio de Coastal

Más detalles

Coming to Your Neighborhood Indoor Constituent Meetings!

Coming to Your Neighborhood Indoor Constituent Meetings! City of Union City 3715 Palisade Avenue Union City, NJ 07087 PRESORTED STANDARD US POSTAGE PAID Newark, NJ Permit No. 3444 @OfficialUCNJ ww.ucnj.com Coming to Your Neighborhood Indoor Constituent Meetings!

Más detalles

Back to School Night August 17, :00-7:00pm

Back to School Night August 17, :00-7:00pm THUNDER NEWS Back to School Night August 17, 2015 6:00-7:00pm School starts Thursday August 20, 2015 at 7:55am CONTENTS INFORMATION......2 CALENDAR...3 BACK TO SCHOOL NIGHT.3 BELL/LUNCH SCHEDULE..4 IMMUNIZATIOS.4

Más detalles

Are you interested in helping to GOVERN the Authority, DEVELOP current and future programs, and APPROVE contracts?

Are you interested in helping to GOVERN the Authority, DEVELOP current and future programs, and APPROVE contracts? Albany Housing Authority RESIDENT COMMISSIONER ELECTION Are you interested in helping to GOVERN the Authority, DEVELOP current and future programs, and APPROVE contracts? RUN FOR RESIDENT COMMISSIONER

Más detalles

Civil Rights Complaint Form

Civil Rights Complaint Form Civil Rights Complaint Form It is the policy of the Greater Derry Salem Cooperative Alliance for Regional Transportation (CART) to uphold and assure full compliance with Title VI of the Civil Rights Act

Más detalles

Attention Passengers Atención, Pasajeros

Attention Passengers Atención, Pasajeros Fall service changes Effective SEPTEMBER 2, 2017 Cambios al servicio de Otoño vigentes el 2 de SEPTIEMBRE, 2017 Effective September 2, 2017, RIPTA will implement its Fall changes. These changes are MODERATE

Más detalles

NBCommunicator. SummerTerm Volume XXI- Issue 30 Week of July 9, Our Fall Term Begins Soon!

NBCommunicator. SummerTerm Volume XXI- Issue 30 Week of July 9, Our Fall Term Begins Soon! NBCommunicator SummerTerm Volume XXI- Issue 30 Week of July 9, 2018 Our Fall Term Begins Soon! Hello Everyone, We hope you are having a great summer! We have been busy getting things ready for the 2018-2019

Más detalles

January 1, Paula C. Holder 1234 Main St Any Town, USA Dear Member,

January 1, Paula C. Holder 1234 Main St Any Town, USA Dear Member, January 1, 2019 Paula C. Holder 1234 Main St Any Town, USA 12345 Dear Member, Your Medicare Part D plan, Teamster Plus Medicare Part D (PDP) provides a Medication Therapy Management (MTM) program at no

Más detalles

SERVICE CHANGES 2017 CAMBIOS DE SERVICIO DE 2017 SERVICE CHANGES 2017 CAMBIOS DE SERVICIO DE Información general. Overview

SERVICE CHANGES 2017 CAMBIOS DE SERVICIO DE 2017 SERVICE CHANGES 2017 CAMBIOS DE SERVICIO DE Información general. Overview SERVICE CHANGES 07 CAMBIOS DE SERVICIO DE 07 Service changes are coming on Sunday, November, 07. SERVICE CHANGES 07 CAMBIOS DE SERVICIO DE 07 Los cambios en el servicio se harán el domingo de noviembre

Más detalles

TOWN OF EAST HARTFORD MOBILE FOODSHARE DATES April June 2014

TOWN OF EAST HARTFORD MOBILE FOODSHARE DATES April June 2014 TOWN OF EAST HARTFORD MOBILE FOODSHARE DATES April June 2014 HOCKANUM PARK COMPLEX VETERANS TERRACE COMPLEX 75 Hamilton Road 102 Columbus Street 8:45-9:15 a.m. 10:00-10:30 a.m. Monday, April 7 th Monday,

Más detalles

ANX-PR/CL/ LEARNING GUIDE

ANX-PR/CL/ LEARNING GUIDE PR/CL/001 SUBJECT 53001583 - DEGREE PROGRAMME 05BH - ACADEMIC YEAR & SEMESTER 2017/18 - Annual Index Learning guide 1. Description...1 2. Faculty...1 3. Skills and learning outcomes...2 4. Brief description

Más detalles

See inside fl ap for details. KeepSanDiegoMoving.com/steerclear. Construction Information. Freeway Closure Details.

See inside fl ap for details. KeepSanDiegoMoving.com/steerclear. Construction Information. Freeway Closure Details. I-805 Closed Between SR 54 and SR 905 THIS SUNDAY AFTERNOON See inside fl ap for details. INSIDE: Construction Information Freeway Closure Details Suggested Detours For more information, visit the special

Más detalles

Winthrop High School SUMMER SCHOOL

Winthrop High School SUMMER SCHOOL Winthrop High School SUMMER SCHOOL Subjects Offered at Winthrop High School: English 9 & Algebra 1 Date of Courses: July 23 Aug 3, 2018 Location: Time: Winthrop High School 7:45 a.m. - 12:00p.m. Cost is

Más detalles

FAMILY INDEPENDENCE ADMINISTRATION Matthew Brune, Executive Deputy Commissioner

FAMILY INDEPENDENCE ADMINISTRATION Matthew Brune, Executive Deputy Commissioner FAMILY INDEPENDENCE ADMINISTRATION Matthew Brune, Executive Deputy Commissioner James K. Whelan, Deputy Commissioner Policies, Procedures, and Training POLICY BULLETIN #10-104-OPE NEW ENTRANCE TO THE EAST

Más detalles

15 TH STREET EAST & 301 BOULEVARD EAST PD&E STUDY

15 TH STREET EAST & 301 BOULEVARD EAST PD&E STUDY 15 TH STREET EAST & 301 BOULEVARD EAST PD&E STUDY FROM TALLEVAST ROAD TO US 41 August 27, 2015 Welcome to the Alternatives Public Workshop! On display tonight: Complete Streets Alternatives Purpose and

Más detalles

l Avondale l Woodridge l Brookland-CUA station l Edgewood l Rhode Island Ave station (Friday and Saturday late night only)

l Avondale l Woodridge l Brookland-CUA station l Edgewood l Rhode Island Ave station (Friday and Saturday late night only) How to use this timetable Use the map to find the stops closest to where you will get on and off the bus. Select the schedule (Weekday, Saturday, Sunday) for when you will travel. Along the top of the

Más detalles

l Avondale l Woodridge l Brookland-CUA station l Edgewood l Rhode Island Ave station (Friday and Saturday late night only)

l Avondale l Woodridge l Brookland-CUA station l Edgewood l Rhode Island Ave station (Friday and Saturday late night only) How to use this timetable Use the map to find the stops closest to where you will get on and off the bus. Select the schedule (Weekday, Saturday, Sunday) for when you will travel. Along the top of the

Más detalles

D8 Hospital Center Line

D8 Hospital Center Line How to use this timetable Use the map to find the stops closest to where you will get on and off the bus. Select the schedule (Weekday, Saturday, Sunday) for when you will travel. Along the top of the

Más detalles

MEMORANDUM CITY COUNCIL. SUBJECT: AC Transit BRT Station Architecture DATE: September 21, 2012 Meetings September 24, 26 & 29

MEMORANDUM CITY COUNCIL. SUBJECT: AC Transit BRT Station Architecture DATE: September 21, 2012 Meetings September 24, 26 & 29 DISTRIBUTION DATE: 9/21/12 MEMORANDUM TO: HONORABLE MAYOR & CITY COUNCIL FROM: Vitaly B. Troyan, P.E. SUBJECT: AC Transit BRT Station Architecture DATE: September 21, 2012 Meetings September 24, 26 & 29

Más detalles

Downtown Corridor/Segment A: Flower Street Closure. Attention Residents and Business Owners

Downtown Corridor/Segment A: Flower Street Closure. Attention Residents and Business Owners CONSTRUCTION NOTICE Downtown Corridor/Segment A: Flower Street Closure Attention Residents and Business Owners EXPO LINE The will be working along Flower Street, between 30th Street and 33rd Street, installing

Más detalles

Health Center Hours of Operation Phone. Tuesday, 11 am - 6 pm Wednesday, 8 am - 3 pm (Closed for lunch Noon - 1 pm) Walk-ins welcome

Health Center Hours of Operation Phone. Tuesday, 11 am - 6 pm Wednesday, 8 am - 3 pm (Closed for lunch Noon - 1 pm) Walk-ins welcome NEVADA HEALTH CENTERS IN NORTHERN NEVADA Health Center Hours of Operation Phone Austin 121 Main Street Austin, NV 89310 Tuesday, 11 am - 6 pm Wednesday, 8 am - 3 pm 775.964.2222 Carlin 310 Memory Lane

Más detalles

D8 Hospital Center Line

D8 Hospital Center Line How to use this timetable Use the map to find the stops closest to where you will get on and off the bus. Select the schedule (Weekday, Saturday, Sunday) for when you will travel. Along the top of the

Más detalles

Highway Alternatives

Highway Alternatives Highway Alternatives February 23 and 24, 2005 DEIS Alternatives The results of the detailed screening analysis were used to help identify the most reasonable highway alternatives. The DEIS will fully evaluate

Más detalles

REVISADO Aviso de audiencias públicas Autoridad de Tránsito del Área Metropolitana de Washington

REVISADO Aviso de audiencias públicas Autoridad de Tránsito del Área Metropolitana de Washington REVISADO Aviso de audiencias públicas Autoridad de Tránsito del Área Metropolitana de Washington Expediente R16-02: Cambios Propuestos a las Instalaciones de WMATA en la Estación de Metro King St-Old Town

Más detalles

Triple-S Salud, Inc. is an independent licensee of BlueCross BlueShield Association.

Triple-S Salud, Inc. is an independent licensee of BlueCross BlueShield Association. Circular Letter#M1807112 August 1, 2018 Action Required by September 15, 2018 in Order to Participate as a Provider in the Puerto Rico Medicaid Government Health Plan Program Dear Provider: Due to a recent

Más detalles

Construction of a water treatment plant and sewer system for the Guaqui town, Department of La Paz / Municipality of Guaqui

Construction of a water treatment plant and sewer system for the Guaqui town, Department of La Paz / Municipality of Guaqui CEDRIG Light Construction of a water treatment plant and sewer system for the Guaqui town, Department of La Paz / Municipality of Guaqui Roberto Méndez, Daniel Maselli Junio 2018 CEDRIG es una herramienta

Más detalles

Benning Road-H Street Limited Line

Benning Road-H Street Limited Line How to use this timetable Use the map to find the stops closest to where you will get on and off the bus. Select the schedule (Weekday, Saturday, Sunday) for when you will travel. Along the top of the

Más detalles

l Annandale l Falls Church l East Falls Church station

l Annandale l Falls Church l East Falls Church station How to use this timetable Use the map to find the stops closest to where you will get on and off the bus. Select the schedule (Weekday, Saturday, Sunday) for when you will travel. Along the top of the

Más detalles

1OBEY ALL TRAFFIC SIGNS AND SIGNALS RIDE TO THE RIGHT AND GO IN THE SAME DIRECTION AS OTHER TRAFFIC

1OBEY ALL TRAFFIC SIGNS AND SIGNALS RIDE TO THE RIGHT AND GO IN THE SAME DIRECTION AS OTHER TRAFFIC 1OBEY ALL 2 TRAFFIC SIGNS AND SIGNALS RIDE TO THE RIGHT AND GO IN THE SAME DIRECTION AS OTHER TRAFFIC Avoid hugging the curb. Ride at least three feet or one arm length from the curb or parked cars. Ride

Más detalles

congested east and west of Lincoln; bike/ped access

congested east and west of Lincoln; bike/ped access } Michigan Ave. congested east and west of Lincoln; bike/ped access } Freeway on- and off-ramps back up Lincoln Blvd. and 4 th St. } Unsafe mid-block ped crossings of Pico } Michigan Ave. está congestionada

Más detalles

Q1 Project ID # (found on door hanger delivered to your home) Numero de Proyecto (encontrado en el folleto distribuido a su casa)

Q1 Project ID # (found on door hanger delivered to your home) Numero de Proyecto (encontrado en el folleto distribuido a su casa) Q1 Project ID # (found on door hanger delivered to your home) Numero de Proyecto (contrado el folleto distribuido a su casa) Answer Choices C00400 Diamond Ct and Belmont Ct Sewer and Water Replacmt Responses

Más detalles

City of Concord Bicycle, Pedestrian and Safe Routes to Transit Plan

City of Concord Bicycle, Pedestrian and Safe Routes to Transit Plan City of Concord Bicycle, Pedestrian and Safe Routes to Transit Plan Community Workshop #2 Vision, Goals, Objectives and Policies July 30, 2015 Workshop Agenda Summary of community identified needs How

Más detalles

Reclaim Your Future: It s Not Too Late to Graduate

Reclaim Your Future: It s Not Too Late to Graduate Reclaim Your Future: It s Not Too Late to Graduate Campaign Saturday, September 7, 2013 from 8:00 a.m. to 1:00 p.m. VOLUNTEER SHEET Please print: Contact Name Mailing Address City State Zip Business/Organization

Más detalles

Bienvenidos! el Proyecto Rehabilitación de Chelsea/ Viaducto Ruta 1 Chelsea Project File No

Bienvenidos! el Proyecto Rehabilitación de Chelsea/ Viaducto Ruta 1 Chelsea Project File No Bienvenidos! el Proyecto Rehabilitación de Chelsea/ Viaducto Ruta 1 Chelsea Project File No. 605287 Reunión de Información Pública el Ayuntamiento Chelsea el 8 Noviembre, 2017 6:30 p.m. Bienvenida e Introducción

Más detalles

Do you use the Red Line at Fort Totten Metrorail Station? Plan ahead for this major disruption.

Do you use the Red Line at Fort Totten Metrorail Station? Plan ahead for this major disruption. The Red Line between NoMa-Gallaudet U and will shut down from Saturday, October 29 through Tuesday, November 22. Do you use the Red Line at Metrorail Station? Plan ahead for this major disruption. What

Más detalles

Notice of Public Meeting

Notice of Public Meeting Notice of Public Meeting The City of San Antonio (CoSA), in conjunction with the Texas Department of Transportation (TxDOT) will conduct a public meeting regarding the proposed pedestrian improvements

Más detalles

ANX-PR/CL/ LEARNING GUIDE

ANX-PR/CL/ LEARNING GUIDE PR/CL/001 SUBJECT 53001581 - DEGREE PROGRAMME 05BH - ACADEMIC YEAR & SEMESTER 2017/18 - Annual Index Learning guide 1. Description...1 2. Faculty...1 3. Skills and learning outcomes...2 4. Brief description

Más detalles

Viaje en Metro a las celebraciones de Año Nuevo!

Viaje en Metro a las celebraciones de Año Nuevo! metro.net Viaje en Metro a las celebraciones de Año Nuevo! La manera sencilla de llegar al desfile, las carrozas y el Rose Bowl. 05-1486mr 10-1025bd 2009 LACMTA Go Metro to 2010 New Year s celebrations!

Más detalles

Transit Alternatives Eliminated

Transit Alternatives Eliminated Transit Alternatives Eliminated Alternativas de Tránsito Eliminadas Transit Alternative 1 I-70 Alignment Bus Rapid Transit (I-70 BRT) Alternativa de Tránsito 1 Alineación de la I-70 Transporte Rápido de

Más detalles

Civil Rights Complaint Form

Civil Rights Complaint Form Civil Rights Complaint Form Title VI of the 1964 Civil Rights Act and related non-discrimination statutes and regulations require that no person in the United States shall, on the ground of race, color,

Más detalles

Bradford Columbia Suwannee Counties Centros de Mamografía

Bradford Columbia Suwannee Counties Centros de Mamografía Bradford Columbia Suwannee Counties Centros de Mamografía COLUMBIA COUNTY Lake City Shands at Lakeshore 368 N.E Franklin Street Tel. (386) 292-8015 Fax. (386) 754-8016 Horas: 8:00am 4:30pm Lake City Medical

Más detalles

By plane: There are two airports close to Tarragona- Reus and Barcelona el Prat.

By plane: There are two airports close to Tarragona- Reus and Barcelona el Prat. ARRIVAL TO TARRAGONA By plane: There are two airports close to Tarragona- Reus and Barcelona el Prat. Tarragona Reus airport is 10 min away by car or Taxi (ca. 30 ) The direct bus costs about 3-6 one-way

Más detalles

Primer. Del 25 al 27 de abril de 2016 Bogotá, Colombia.

Primer. Del 25 al 27 de abril de 2016 Bogotá, Colombia. Primer Del 25 al 27 de abril de 2016 Bogotá, Colombia. Con una asistencia de más de 520.000 personas en 14 días, una rica programación cultural con autores de primera categoría y tres días de jornadas

Más detalles

KING CITY SIGN REGULATIONS SURVEY (ENCUESTA DE REGULACIONES DE LETREROS DE KING CITY)

KING CITY SIGN REGULATIONS SURVEY (ENCUESTA DE REGULACIONES DE LETREROS DE KING CITY) KING CITY SIGN REGULATIONS SURVEY (ENCUESTA DE REGULACIONES DE LETREROS DE KING CITY) The City Council desires to improve the sign regulations and is requesting your input. The purpose for amending the

Más detalles

Corredor de Transporte del Este del Valle de San Fernando. Reuniones de Ámbito Marzo 2013

Corredor de Transporte del Este del Valle de San Fernando. Reuniones de Ámbito Marzo 2013 Corredor de Transporte del Este del Valle de San Fernando Reuniones de Ámbito Marzo 2013 Propósito de la Reunión Proveer un resumen e historial Explicar las alternativas que se están considerando Obtener

Más detalles

Approval of Resolution Ordering Election for May 5, 2018, in Trustee Districts 1 and 7. Policy Reminders

Approval of Resolution Ordering Election for May 5, 2018, in Trustee Districts 1 and 7. Policy Reminders RESOLUTION NO. 6D-1 Approval of Resolution Ordering Election for May 5, 2018, in Trustee Districts 1 and 7 The Chancellor recommends that the Board of Trustees of the Dallas County Community College District

Más detalles

We ll get you there! Lo llevaremos ahí!

We ll get you there! Lo llevaremos ahí! We ll get you there! Lo llevaremos ahí! Route 1 Rio Hondo/Bellflower Ruta 1 Effective March 25, 2018 Efectivo el 25 de marzo 2018 NORWALK TRANSIT FARE POLICY Adult Fare...1.25 Student (Grade K-12)...1.00

Más detalles

2017 South Coast Summer Classic Schedule, Rules, and General Information

2017 South Coast Summer Classic Schedule, Rules, and General Information 2017 South Coast Summer Classic Schedule, Rules, and General Information Tournament Rules / Information / Host Site Addresses Please read through all bullet points to avoid any confusion or conflicts during

Más detalles

Ingenieros Asociados INGENIERÍA CONSTRUCCIÓN OPERACIÓN MANTENIMIENTO / ENGINEERING / CONSTRUCTION / OPERATION / MAINTENANCE

Ingenieros Asociados INGENIERÍA CONSTRUCCIÓN OPERACIÓN MANTENIMIENTO / ENGINEERING / CONSTRUCTION / OPERATION / MAINTENANCE Ingenieros Asociados INGENIERÍA CONSTRUCCIÓN OPERACIÓN MANTENIMIENTO / ENGINEERING / CONSTRUCTION / OPERATION / MAINTENANCE Ingenieros Asociados Contribuimos al desarrollo de la infraestructura industrial

Más detalles

REVIEW OF THE SUSTAINABLE URBAN MOBILITY PLAN SUMP-2016

REVIEW OF THE SUSTAINABLE URBAN MOBILITY PLAN SUMP-2016 REVIEW OF THE SUSTAINABLE URBAN MOBILITY PLAN IN MARCH OF 2010 THE CITY COUNCIL IN A PLENARY SESSION PASSED THE SUSTAINABLE URBAN MOBILITY PLAN OF RIVAS VACIAMADRID SUMP-2010 The analysis of the mobility

Más detalles

Ing. Alex M. Sánchez Navarro, PhD., PE. ECMPRO

Ing. Alex M. Sánchez Navarro, PhD., PE. ECMPRO Ing. Alex M. Sánchez Navarro, PhD., PE. ECMPRO www.ecmprogroup.com Alguna vez ha estado en tráfico vehicular, sin embargo al pasar el atasco se percibe que aparentemente nada lo ha causado? Cómo podemos

Más detalles